Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate -  

Ko, Yongho (Department of Architectural Engineering, Inha University)
Ngov, Kheang (Department of Architectural Engineering, Inha University)
Noh, Jaeyun (Department of Architectural Engineering, Inha University)
Kim, Yujin (Department of Architectural Engineering, Inha University)
Han, Seungwoo (Department of Architectural Engineering, Inha University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.6, 2022 , pp. 21-29 More about this Journal
Abstract
Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.
Keywords
Productivity; Construction Standard Production Rate; Discrete Event Simulation; Equipment Combination;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 AbouRizk, S. (2010). "Role of simulation in construction engineering and management." Journal of construction engineering and management, 136(10), pp. 1140-1153.   DOI
2 Halpin, D.W., and Riggs, L.S. (1992). "Planning and analysis of construction operations." John Wiley & Sons.
3 Han, S.W., Lee, S.Y., Hong, T.H., and Chang, H. (2006). "Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations." Canadian Journal of Civil Engineering, 33(9), pp. 1105-1114.   DOI
4 Kim, H.M. (2012). "Fuzzy technique-based productivity estimation by means of construction delay factor analysis on curtain wall operations in high-rise building constructions." MS thesis, Inha University, Incheon, South Korea.
5 Han, S.W., Lee, T.H., and Ko, Y.H. (2014). "Implementation of construction performance database prototype for curtain wall operation in high-rise building construction." Journal of Asian Architecture and Building Engineering, 13(1), pp. 149-156.   DOI
6 Lee, D.E., Kim, Y.W., and Son, C.B. (2013). "Estimating Productivity of Al-Form operation using WebCYCLONE system." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 115-122.   DOI
7 Korea Price Information. (2022). https://www.kpi.or.kr (accessed on 14. Sep. 2022).
8 Labban, R., AbouRizk, S., Haddad, Z., and Elsersy, A. (2013). "A discrete event simulation model of asphalt paving operations." 2013 Winter Simulations Conference (WSC), pp. 3215-3224.
9 Mohamed, Y., and AbouRizk, S.M. (2005). "Framework for building intelligent simulation models of construction operations." Journal of computing in civil engineering, 19(3), pp. 277-291.   DOI
10 Lu, M. (2003). "Simplified discrete-event simulation approach for construction simulation." Journal of Construction Engineering and Management, 129(5), pp. 537-546.   DOI
11 Ministry of Land, Infrastructure and Transport. (2021). Construction Standard Production Rate.
12 Zayed, T.M., and Halpin, D.W. (2000). "Simulation as a tool for resource management." 2000 Winter Simulation Conference Proceedings, 2, pp. 1897-1906.
13 Kim, S.C., Kong, M.J., Choi, J.W., Han, S.W., Baek, H.Y., and Hong, T.H. (2021). "Feasibility analysis of COVID-19 response guidelines at construction sites in south korea using CYCLONE in terms of cost and time." Journal of Management in Engineering, 37(5), p. 04021048.
14 Martinez, J.C. (2010). "Methodology for conducting discrete-event simulation studies in construction engineering and management." Journal of Construction Engineering and Management, 136(1), pp. 3-16.   DOI
15 Oh, J.H., Song, T.S., and An, B.Y. (2020). "A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work." Korean Journal of Construction Engineering and Management, KICEM, 21(6), pp. 16-26.   DOI
16 Smith, S.D. (1999). "Earthmoving productivity estimation using linear regression techniques." Journal of construction engineering and management, 125(3), pp. 133-141.   DOI
17 Watkins, M., Mukherjee, A., Onder, N., and Mattila, K. (2009). "Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions." Journal of construction engineering and management, 135(7), pp. 657-667.   DOI
18 Shin, Y., Cho, H., and Kang, K.I. (2011). "Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction." Automation in construction, 20(5), pp. 550-558.   DOI
19 Widia, A. (2022). WebCYCLONE Users manual, available in: https://www.academia.edu/34614245/WebCYCLONE_Users_Manual
20 Zankoul, E., Khoury, H., and Awwad, R., (2015). "Evaluation of agent-based and discrete-event simulation for modeling construction earthmoving operations." ISARC. Proceedings of the international symposium on automation and robotics in construction 2015, 32, pp. 1-9.
21 Lee, J.H. (2010). "Construction performance evaluation of an advanced-technology based on construction simulation technique: Focused on steel staircase." MS thesis, Inha University, Incheon, South Korea.