• Title/Summary/Keyword: construction schedule

Search Result 751, Processing Time 0.029 seconds

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Peak-time Characteristics and Parking Apron Requirements of Korean Airports (국내공항의 항공기 운항 첨두 특성과 첨두시 주기장 소요에 관한 연구)

  • Yoo, Seung-Gwon;Lee, Yeong-Heok
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.6
    • /
    • pp.27-42
    • /
    • 2003
  • The basis for planning airport development is the specific demand at peak hour among various aviation demands. The demand at peak hour is regarded to be the source which enables us to estimate the size requirement and capacity of an airport facility. The distribution type of peak hour-operation depends on the difference of aircraft route, geographical location of airport, passengers and cargo. The demand at peak hour is calculated with peak hour factor. So far, the features of peak hour adopted for domestic airport construction plan have been based on the foreign research results. However, it is officially unconfirmed whether the various peak hour characteristics or peak hour factor suggested from foreign studies can be compatible with Korean state or not. In this study, the aircraft operation pattern and the peak hour characteristics are analyzed with hourly data using the operation schedule of an airport for the last 5 years and the actual result statistics of Korean air transportation by airport through the recent 10 Years. After the peak hour factor of the airports is calculated and compared with existing research results, peak hour factor by annual operation frequency is suggested for Korean airports.

A Study on Database System for Hostorical Booking of Korean Railroad (한국철도의 예약실적 데이터베이스 시스템에 관한 연구)

  • Oh, Seog-Moon;Hwang, Jong-Gyu;Hyeon, Seung-Ho;Kim, Yong-Gyu;Lee, Jong-Woo;Kim, Young-Hoon;Hong, Soon-Heum;Park, Jong-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.371-374
    • /
    • 1998
  • The construction of the transportation history database system is to serve the scheduling and seat inventory controling. Recently, lots of countries have been faced with the advance era because of the new railway transportation system, like the high speed railway and/or magnetic levitation vehicle system. This can be reasonably translated as those of operators are willing to provide the more various and high quality schedule to the customer. Those operators these ideas make possible to forecast that scheduling process is going to be complicated more and more. The seat inventory control, so to speak Yield Management System(YMS), goes a long way to improve the total passenger revenue at the railway business. The YMS forecasts the number of the last reservation value(DCP# END) and recommends the optimal values on the seat sales. The history database system contains infra-data(ie, train, seat, sales) that will be the foundation of scheduling and seat inventory control application programs. The development of the application programs are reserved to the next step. The database system is installed on the pc platform (IBM compatible), using the DB2(RDBMS). And at next step, the platform and DBMS will be considered whether they can meet the users' requirement or not.

  • PDF

Problem and Improvement of the Computerization Practice Real - estate Registration

  • Youn, Sung-Ho;Kim, Moon-sung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.1
    • /
    • pp.161-168
    • /
    • 2016
  • It has become the information medium that mediate between individuals of marketing with the new information media that use of the Internet in accordance with the progress of the IT industry- real estate marketing, real estate leasing, real estate auctions, etc. The real estate registration services should be disclosed to outside that include a schedule details the public book-register and problems caused by it should be reasonably resolved by handling a large amount of real estate registration work quickly, accurately handling to utilize Information Technology(IT) through the information system construction as the feature to process the information of register entries. Computerization of real estate registration will raise the efficiency of the registration as well as people can see the information related to real estate on the basis of published content without limitation the time and place and will pursue the ideal and reliability of the registration -web accessibility improving of the Internet Registry and permanent storage of preserving documents by electronic means. It is very large that impact on the real estate transaction if the accuracy of legal registration choosing formalism in the processing of real estate registration business through the Internet than written application is highly probable to occur incorrect registration. Also, It is necessary to manage it effectively -if you do not quickly and exactly respond to it, there is problems such as delays or poor registration service because real estate business activated and real estate registration services also increased sharply. In this paper, we will identify the problems of the real estate registration work and suggest improvements about it.

Construction of Database for Application of APEX Model in Korea and Evaluation of Applicability to Highland Field (APEX 모델의 국내 적용을 위한 데이터베이스 구축 및 고랭지 밭에 대한 적용성 평가)

  • Koo, Ja-Young;Kim, Jonggun;Choi, Soon-Kun;Kim, Min-Kyeong;Jeong, Jaehak;Lim, Kyoung Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.6
    • /
    • pp.89-100
    • /
    • 2017
  • The Agricultural Policy/Environmental eXtender (APEX) model was developed to extend EPIC's capabilities of simulating land management impacts for small-medium watershed and heterogeneous farms. APEX is a flexible and dynamic tool that is capable of simulating a wide array of management practices, cropping systems, and other land uses across a broad range of agricultural landscapes. APEX have its own agricultural environmental database including operation schedule, soil property, and weather data etc., by crops. However, agriculture environmental informations the APEX model has is all based on U.S. As this can cause malfunction or improper simulation while simulating highland field. In this study, database for APEX model to be utilized for South Korea established with 44,814 agriculture fields in Pyeongchang-gun, Korea from 2007 to 2016. And assessed domestic applicability by comparing T-P unit load criteria presented by National Institution of Environmental Research and result of APEX model. As a result of APEX model simulation, average T-P value for decade was 6.18. Average T-P of every year except 2011 was in range of 5.37~10.43 and this is being involved into criteria presented by National Institution of Environmental Research. It is analyzed that adjusting slope factor can make the model applicable for domestic agricultural environment.

Requirements for Berth-Allocation Planning When Taking Pier-Available Resources and Submarine Support Service Request Schedules into Account (잠수함 지원업무 요구일정과 부두 가용자원을 고려한 선석할당계획)

  • Choi, Ji-Won;Choi, In-Chan
    • Journal of Navigation and Port Research
    • /
    • v.44 no.6
    • /
    • pp.501-508
    • /
    • 2020
  • His paper looks more closely at the Republic of Korea's (ROK) Navy submarine berth-allocation strategies, with the study's results ultimately resulting in the proposition of an integer programming model. Current submarine berth-allocation planning problems include the need for more minimal berth-shifting and general support service failures, as a lack of efficient submarine berth-allocation often leads to submarines unable to receive the support service they need due to the inadequacy of their assigned berths. Currently, the ROK Navy allocates berths by only taking available reserve resources and the full-capacity limits of support services into account. This paper expands upon this strategy, and proposes a model which would allow for submarine berth allocation planning to also take submarine support service scheduling into account, allowing for more efficient and timely submarine servicing. This proposed model in turn minimizes berth shifting, support service failures, and allows for full coordination with the submarine support service request schedule. The construction of this model was carried out through data gathered on the ROK Navy's fleets and forces, allowing for a more nuanced analysis of existing issues with submarine berth-allocation planning.

A Study on Traffic Supporting System Enhancing the Safe Passage under Sea Bridge for Towing Vessels (예부선의 해상교량 안전통항을 위한 안전운항지원시스템 구축에 관한 연구)

  • Lee, Yun-Sok;Yun, Gwi-Ho;Park, Young-Soo;Kim, Jong-Sung;Cho, Ik-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.13 no.4
    • /
    • pp.71-78
    • /
    • 2007
  • Towing vessels have carried out the important role and service in the maritime industry construction, such as port and sea bridge construction, fairway dredging and sea reclamation etc. Furthermore, tugboat takes the largest portion in number of vessel at the domestic registry and barges as big as the general merchant vessel, which are getting specialized and larger, are in operation. In spite of the increase of marine accidents under this situation, there has been no proper measure for the safe navigation of tugboat in the aspect of a nation. This paper aims to propose the measure for the safe navigation of tugboat according to the frequent marine accident of tugboat with sea bridge. Therefore, we show an example of the sailing schedule and operation checklist based on the analysis of statistics and precedent of marine accident and the investigation of the actual operation state of tugboat in the aspect of a contract of carriage and a personnel setup, which should be checked by the operator of tugboat, to pass through sea bridge safely and propose the safe traffic supporting system based on electronic chart system to improve the safe navigation of tugboat.

  • PDF

Development of the Work Information Management System of Pavement Crack Sealing Using IT (정보기술을 활용한 도로면 크랙실링 작업정보 관리시스템 개발)

  • Byun, Woong-Ho;Oh, Se-Wook;Lee, Jeong-Ho;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.613-618
    • /
    • 2006
  • Crack in Pavements have been continually increased aby water penetration Therefore, the cracks can result in deterioration of the pavements that could be extremely dangerous fro road users. Creak sealing work performed in outdoor is very dangerous, costly and labor intensive. To slove these problems, automated crack sealing systems have been developed. it Would be needed that work information related to crack sealing must be gathered in an effort to used for existing or future crack sealing work. Furthermore, work information related to crack sealing could be utilized in analyzing work productivity and condition. The primary objective of this study is to propose a PDA and Web-based system for work information management of crack sealing which enables to effectively interchange work information between head office and fieds, and to accurately collect work information. Finally, it is anticipated that the effective use of the developed PDA and web-based system would be able to effectively share work information, measure productivity, estimate costs as well as plan future work schedule.

  • PDF

Primary Management Factors for Collaboration among Participants in Technical Proposal Tendering (기술제안입찰 참여자간의 협업지원을 위한 중점협업관리요소 도출)

  • Koo, Seonkeun;Lim, Susang;Yoon, Yousang;Han, Sangwon;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.3-12
    • /
    • 2016
  • Recently government is set to expand its policy to promote technical proposal tendering in a dimension of technical competitiveness reinforcement. Because a variety of complicated techniques are applied in technical proposal tendering and variables could be occurred in terms of cost, schedule, constructability and others when techniques are reflected on design document collaboration management among participants is considered insignificantly. So the research would determine primary management factors and presents management direction for collaboration among participants. First action for this is categorization of hindrance factors to collaboration into five factors as 'Poor work processing', 'Communication cap among participants', 'Lack of understanding about technical proposal tendering', 'Difficulty of decision making' and 'Insufficiency in managing the work data'. Second correlation analysis is conducted between the categorized factors and participants according to tasks in technical proposal tendering to figure out the correlation degree of variables. If there is a strong correlation between variables, hindrance factor in that case regarded primary management factor to collaboration and finally management direction is presented at each task.

A Study on the Suggestion of Traffic Supporting System Enhancing the Safe Passage under Sea Bridge for Tugboat (예부선의 해상교량 안전 통항을 위한 안전운항지원시스템 제안)

  • Lee, Yun-Sok;Yun, Gwi-Ho;Park, Young-Soo;Kim, Jong-Sung;Cho, Ik-Soon
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.05a
    • /
    • pp.101-108
    • /
    • 2007
  • Tugboat has carried out the important role and service in the maritime industry construction, such as port and sea bridge construction, fairway dredging and sea reclamation etc. Furthermore, tugboat takes the largest portion in number of vessel at the domestic registry and barges as big as the general merchant vessel, which are getting specialized and larger, are in operation. In spite of the increase of marine accident under this situation, there has been no proper measure for the safe navigation of tugboat in the aspect of a nation. This paper aims to propose the measure for the safe navigation of tugboat according to the frequent marine accident of tugboat with sea bridge. Therefore, we show a example of the sailing schedule and operation checklist based on the analysis of statistics and precedent of marine accident and the investigation of the actual operation state of tugboat in the aspect of a contract of carriage and a personnel setup, which should be checked by the operator of tugboat, pass through sea bridge safely and propose the safe traffic supporting system based on electronic chart system to improve the safe navigation of tugboat.

  • PDF