DOI QR코드

DOI QR Code

Primary Management Factors for Collaboration among Participants in Technical Proposal Tendering

기술제안입찰 참여자간의 협업지원을 위한 중점협업관리요소 도출

  • Koo, Seonkeun (Department of Architectural Engineering, University of Seoul) ;
  • Lim, Susang (Department of Architectural Engineering, University of Seoul) ;
  • Yoon, Yousang (Corp. PMPgM) ;
  • Han, Sangwon (Department of Architectural Engineering, University of Seoul) ;
  • Hyun, Changtaek (Department of Architectural Engineering, University of Seoul)
  • Received : 2016.02.25
  • Accepted : 2016.08.16
  • Published : 2016.09.30

Abstract

Recently government is set to expand its policy to promote technical proposal tendering in a dimension of technical competitiveness reinforcement. Because a variety of complicated techniques are applied in technical proposal tendering and variables could be occurred in terms of cost, schedule, constructability and others when techniques are reflected on design document collaboration management among participants is considered insignificantly. So the research would determine primary management factors and presents management direction for collaboration among participants. First action for this is categorization of hindrance factors to collaboration into five factors as 'Poor work processing', 'Communication cap among participants', 'Lack of understanding about technical proposal tendering', 'Difficulty of decision making' and 'Insufficiency in managing the work data'. Second correlation analysis is conducted between the categorized factors and participants according to tasks in technical proposal tendering to figure out the correlation degree of variables. If there is a strong correlation between variables, hindrance factor in that case regarded primary management factor to collaboration and finally management direction is presented at each task.

최근 정부는 기술 위주의 경쟁을 강화하는 차원에서 기술제안입찰방식을 점차 확대시켜 나가고 있다. 기술제안입찰방식은 다방면의 복잡한 기술이 적용되고 이러한 기술들을 설계도서에 반영할 시 비용, 공기, 시공성 등의 측면에서 원안에 대한 변수가 발생될 수 있기 때문에, 참여자간의 협업이 중요함에도 불구하고 이에 대한 관리는 미흡하였다. 따라서 본 연구에서는 기술제안입찰에서 참여자간의 협업지원을 위해 협업저해요인을 도출하여 이를 중점적으로 관리하는 방향을 도출하고자 하였다. 이를 위해 첫째로 요인분석을 실시하여 협업저해요인을 5가지 유형으로 분류하였고 두 번째로 분류된 5가지 요인들과 기술제안입찰 각 업무별 참여자간의 상관분석을 통해 변수간의 상관도를 분석하였다. 변수간의 상관도가 높은 협업저해요인을 중점협업관리요소로 정의하고 끝으로 각 업무별로 이를 관리할 수 있는 방향을 제시하였다.

Keywords

References

  1. Choi, C. (2014). "Improvement of Evaluation Criteria for Design Development and Construction Document Technical Proposal Tendering." MS thesis, Univ. of Seoul, Korea.
  2. Chun, J. Y., and Oh, S. J. (2003). "Constitutional Directions of Decision Support Process for Cooperative Design in Architectural Design Phase." Journal of The Architectural Institute of Korea Structure & Construction, 12(11), pp. 173-180.
  3. Choi, M. S., Kim, Y. D., Lee, S. W., Lee, Y. S. and Choi, E. J. (2013). "Improvement and operation of System for Technical proposal tendering." Construction Economy Research Institute of Korea, pp. 5-6.
  4. Jacob C, Patricia C, Stepten G. W., and Leona S. A. (2003). "Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences." Journal of Educational and Behavioral Statistics, 30(2), pp. 227-229. https://doi.org/10.3102/10769986030002227
  5. Kim, S. K. (2014). "A Study on the Efficient Management Process Model of the Best Value System." MS thesis, Hanyang Univ., Korea.
  6. Kunwon Engineering (2011). "Flowchart of technical proposal service" (Feb. 3, 2016)
  7. Lee, J. H., Yi, J. S., Shin, S. W., Park, K. R., and Lim, J. Y. (2010). "Development of Design Collaboration Management System for Multiple Participants in Design Projects." Korean Journal of construction engineering and management, 11(3), pp. 23-32. https://doi.org/10.6106/KJCEM.2010.11.3.23
  8. Lim, H. K. (2007). "Collaborative Design Management System based on the Product Information Analysis in Curtain Wall Engineering." MS thesis, Dankook Univ, Korea.
  9. Um, H. R. (2014). "A Study on the Application of Construction Management to Technical Proposal Tendering." MS thesis, Seoul National Univ. of Science & Technology, Korea.
  10. Yu, I. H., and Kim, K. R. (2008). "Development of and Operation Model for Technical Proposal-Based Tender of Public Construction Projects." Korean Journal of construction engineering and management, 9(2), pp. 136-145.