Browse > Article
http://dx.doi.org/10.6106/KJCEM.2016.17.5.003

Primary Management Factors for Collaboration among Participants in Technical Proposal Tendering  

Koo, Seonkeun (Department of Architectural Engineering, University of Seoul)
Lim, Susang (Department of Architectural Engineering, University of Seoul)
Yoon, Yousang (Corp. PMPgM)
Han, Sangwon (Department of Architectural Engineering, University of Seoul)
Hyun, Changtaek (Department of Architectural Engineering, University of Seoul)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.5, 2016 , pp. 3-12 More about this Journal
Abstract
Recently government is set to expand its policy to promote technical proposal tendering in a dimension of technical competitiveness reinforcement. Because a variety of complicated techniques are applied in technical proposal tendering and variables could be occurred in terms of cost, schedule, constructability and others when techniques are reflected on design document collaboration management among participants is considered insignificantly. So the research would determine primary management factors and presents management direction for collaboration among participants. First action for this is categorization of hindrance factors to collaboration into five factors as 'Poor work processing', 'Communication cap among participants', 'Lack of understanding about technical proposal tendering', 'Difficulty of decision making' and 'Insufficiency in managing the work data'. Second correlation analysis is conducted between the categorized factors and participants according to tasks in technical proposal tendering to figure out the correlation degree of variables. If there is a strong correlation between variables, hindrance factor in that case regarded primary management factor to collaboration and finally management direction is presented at each task.
Keywords
Technical Proposal Tendering; Factor Analysis; Correlation Analysis; Primary Management Factors for Collaboration;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Yu, I. H., and Kim, K. R. (2008). "Development of and Operation Model for Technical Proposal-Based Tender of Public Construction Projects." Korean Journal of construction engineering and management, 9(2), pp. 136-145.
2 Um, H. R. (2014). "A Study on the Application of Construction Management to Technical Proposal Tendering." MS thesis, Seoul National Univ. of Science & Technology, Korea.
3 Lim, H. K. (2007). "Collaborative Design Management System based on the Product Information Analysis in Curtain Wall Engineering." MS thesis, Dankook Univ, Korea.
4 Lee, J. H., Yi, J. S., Shin, S. W., Park, K. R., and Lim, J. Y. (2010). "Development of Design Collaboration Management System for Multiple Participants in Design Projects." Korean Journal of construction engineering and management, 11(3), pp. 23-32.   DOI
5 Choi, M. S., Kim, Y. D., Lee, S. W., Lee, Y. S. and Choi, E. J. (2013). "Improvement and operation of System for Technical proposal tendering." Construction Economy Research Institute of Korea, pp. 5-6.
6 Kunwon Engineering (2011). "Flowchart of technical proposal service" (Feb. 3, 2016)
7 Kim, S. K. (2014). "A Study on the Efficient Management Process Model of the Best Value System." MS thesis, Hanyang Univ., Korea.
8 Jacob C, Patricia C, Stepten G. W., and Leona S. A. (2003). "Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences." Journal of Educational and Behavioral Statistics, 30(2), pp. 227-229.   DOI
9 Chun, J. Y., and Oh, S. J. (2003). "Constitutional Directions of Decision Support Process for Cooperative Design in Architectural Design Phase." Journal of The Architectural Institute of Korea Structure & Construction, 12(11), pp. 173-180.
10 Choi, C. (2014). "Improvement of Evaluation Criteria for Design Development and Construction Document Technical Proposal Tendering." MS thesis, Univ. of Seoul, Korea.