An Empirical Study on the Effect of public Construction Industry by Expansion of New Budget System (계속비 사업 확대로 인한 공공건설사업 파급효과 분석)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.153-163
    • /
    • 2008
  • Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

Development of the Work Information Management System of Pavement Crack Sealing (도로면 크랙실링 작업정보 수집 관리시스템 개발)

  • Byun, Woong-Ho;Oh, Se-Wook;Lee, Hyun-Jung;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.80-91
    • /
    • 2007
  • Crack in Pavements have been continually increased a by water penetration Therefore, the cracks can result in deterioration of the pavements that could be extremely dangerous fro road users. Creak sealing work performed in outdoor is very dangerous, costly and labor intensive. To slove these problems, automated crack sealing systems have been developed. it Would be needed that work information related to crack sealing must be gathered in an effort to used for existing or future crack sealing work. Furthermore, work information related to crack sealing could be utilized in analyzing work productivity and condition. The primary objective of this study is to propose a PDA and Web-based system for work information management of crack sealing which enables to effectively interchange work information between head office and fields, and to accurately collect work information. Finally, it is anticipated that the effective use of the developed PDA and web-based system would be able to effectively share work Information, measure productivity, estimate costs as well as plan future work schedule.

A Study on Utilizing BIM Level of Architectural Design Information for School Facilities (BIM을 활용한 학교시설 설계정보단계 설정에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Kim, Hyung-Un
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.13-20
    • /
    • 2012
  • The recent advances in digital technology allow the use of BIM for integratively managing various information pertaining to an architectural structure. This can be the suitable tool for effectively utilizing the various requests of both the users and the administrators from the planning phase. In particular, planning and constructing a school facility can be challenging because it is an important learning facility where the students are required follow a set schedule. Accommodating to the various needs and requests of the users and the other related parties in the progress can be very difficult. Therefore, in order to use the BIM with the basis of data to manage the lifetime of the school facility, it is necessary to develop the specialized BIM process customized to the school facilities. Using this as the base, the BIM process specifically for school facilities should be phased in, applied, and expanded. The objective of this study is to define the scope of application and to plan for the efficient utilization of the BIM process specialized for school facilities, when conducting the project from planning phase to design development phase through the series of processes. Unlike the presently used enhancement of the visible minute details of the models, the methods to enhance the quality of information contained inside the model will be proposed. Also, the user will participate in the school facility construction. The realistic BIM application is aimed through the research for the processes for building models that will be utilized for construction and management.

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

The Characteristics of the Repair Unit Cost in Public Rental Housing (공공임대주택 단위 수선비용 특성 분석)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.103-109
    • /
    • 2014
  • Apartment housing should require the systematic maintenance to provide the decent living condition during its life. Each household should participate the maintenance activities and pay for the repair. Therefore, the required cost for repair would be needed to plan in the repair schedule because each household could not pay the much repair money at a time. After apartment constructed, a long term repair plan would be prepared in repair time, repair scope and a required cost. A few studies are said that the repair cost depends on the building deterioration, elapsed year and management factors. The above factors are not be certain to affect the repair management while it may be important to prepare the required money and the repair time. In this paper, it aimed at analyzing the correlation between the repair management and the management factors, especially total area, number of household. This would educe the unit cost per number of household and management area in the individual boiler and elevator with full change and full repair. The unit cost per number of household and area for full change are about 199,000 won/household and $1,954won/m^2$ in the individual boiler respectively. The unit cost of the elevator for full change is 94,000 won/household and $5,429won/m^2$ respectively. Second, this study shows that the elapsed year after construction would not be related the repair unit cost.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

Towards attaining efficient management of berth maintenance in Saudi Arabian Industrial Ports

  • Mohammed E. Shaawat;Abdullah Binomar;Abdulaziz S. Almohassen;Khalid Saqer. Alotaibi;Mahmoud Sodangi;Ahmad Aftab
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.1
    • /
    • pp.25-42
    • /
    • 2023
  • Despite the significance of ports as critical economic infrastructure, the berth facilities usually deteriorate due to heavy loading, unloading, aging, environmental weather conditions, marine growths, and lack of efficient maintenance management. Marine berths require proactive maintenance management to limit deterioration and defects as no berth facility is maintenance-free. Thus, delay in carrying out maintenance work for the marine berths can be devastating to the operational process involving ship entry, loading, and unloading operations. The aim of this research is to coordinate both operations work, and maintenance works that take place inside the berth of a local industrial port in Saudi Arabia, by developing a novel framework that integrates both works without affecting the efficiency and functionality of the berth. The study focused on defining the operational process of the port and identifying the elements with direct and indirect effects. In addition to determining the priority for the entry of ships inside the berth, it also identified the factors involved in designing a framework that included maintenance work as a component of the monthly berth occupancy schedule. By applying a mathematical model, a framework was established, which includes all the important elements of the process. As a result of the mathematical method formulation process, a database was designed that organizes and coordinates the operations of all berths within the port. This creates time to carry out the required maintenance work monthly as well as ease of coordination with the contractors responsible for the implementation of those works.