Criteria for the Float Distribution

여유시간 분배기준에 관한 연구

  • Published : 2003.11.01

Abstract

The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

Critical Path Mettled(CPM)은 공정을 계획하고 관리하는데 효과적인 도구이다. CPM의 장점 중 한 가기는 여유시간(Float)을 계산할 수 있다는 것이다. 여유시간은 프로젝트 전체의 공기에 영향을 주기 않고 연장할 수 있지만 공정관리 상의 부산물이기 때문에 소유권에 대한 개념과 범위가 명확하지가 않다. 때문에 사업참여자들이 여유시간을 사용할 때에는 이해관계가 얽혀있어 많은 분쟁을 일으켰다. 이를 해결하기 위해 여유시간 분배와 소유권에 대한 연구가 진행되어 왔으나 여유시간 분배의 기준을 전체 공정에 대한 비율에 두고 있어 합리적인 분배가 이루어지기 못했다. 따라서 본 연구에서는 여유시간 활용목적에 대해 분석한 결과를 기반으로 하여 여유시간 분배 기준을 공기지연 리스크로 제시하였고, 소유권의 개념을 적용시키기 위해 사업참여자 주체별로 공기지연 리스크인자를 구분하였다. 또한 공기지연 리스크인자가 전체 공정에 대해 일률적으로 영향을 끼치는 것이 아니기 때문에 공종에 따라 공기지연 리스크인자들의 영향력을 평가하기 위한 Framework을 구축하였고, 평가를 위한 방법과 기준을 활용할 수 있는 분배방법을 제시하였다.

Keywords