Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.
NGUYEN, Phong Thanh;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
제8권2호
/
pp.309-315
/
2021
Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner's design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively.
최근 국내에서 도심재생을 위한 입체복합공간 개발사업으로 여러 메가프로젝트가 수행중이지만, 메가프로젝트 실적 자료 및 경험, 기술부족으로 인해 여러 가지 문제점들이 드러나고 있다. 다양한 유형의 프로젝트들로 구성된 입체 복합공간 개발 사업에서 프로그램 및 프로젝트 수준으로 메가프로젝트를 관리할 수 있는 기술이 요구된다. 메가프로젝트는 다년간에 걸쳐 수행되는 사업으로 사업기간 예측과 그에 따른 공정관리가 무엇보다 중요하다. 따라서 메가프로젝트 특성에 맞는 프로그램레벨에서의 공정관리 기술 개발이 필요하다. 본 연구에서는 공정관리 기술개발의 선행연구로 사업초기단계 사업기간 예측 및 일정 계획 방법에 대해서 제시하였다. 먼저 과거 수행된 단일시설 및 복합시설의 프로젝트 속성정보와 설계 및 공사기간의 일정데이터를 수집하여, 프로젝트 기간 예측을 위한 DB의 개발방향을 제시하였다. 그리고 메가프로젝트 사업초기단계 사업기간 예측 시 영향을 미치는 발주자의 요구사항과 사업비 투입계획에 따라 시나리오를 개발하여 사업기간 예측 방법에 대해 제시하였고, CCPM을 통한 사업기간 단축가능성을 제시하였다.
정부기관은 공사계획단계 및 시공 중 발생하는 설계변경으로 인한 공사비 증가가 23,663억 원에 달하는 것으로 발표한바 있다. 설계변경은 표준화가 어려운 건축설계의 특성으로 인해 발생하는 현상으로 발주자의 요구사항변경, 관련 제도, 설계 부적정, 현장여건 등 건설프로젝트 전반에 걸쳐 그 원인이 존재하기 때문에 기본설계 및 중간설계 단계에서 완벽한 설계를 한다 하더라도 설계변경을 예방하고 감소시키는 데에는 한계가 있다. 또한 공사계획 및 시공단계에서 단편적 인 검토만으로 설계변경안을 선정하는 현행 관리프로세스는 또 다른 설계변경을 유발시켜 재시공과 그에 따른 공사비 증가의 주된 원인이 되고 있어, 공사계획 및 시공 중 발생한 설계변경에 효율적으로 대처하는 방안이 요구되고 있다. 이에 본 연구에서는 CM 발주방식의 건축프로젝트를 대상으로 건설사업관리자가 프로젝트 수행 중 발생하는 설계변경에 대하여 다수의 설계변경안을 비용, 성능, 시공성 측면에서 복합적이고 정량적으로 평가하여 적정 설계변경안을 선정할 수 있는 의사결정지원 프로세스의 논리구조와 기본모형을 제시하였다.
Many project (such ESCO or BRP) are being implemented for existing building energy saving. Most of medium or large building that use many energy being implemented this project. In the case of large or medium building must implement obligatorily Energy auditing. Therefore, They can be recognize their building energy consumption situation. But, In the case of small building don't need obligatorily energy auditing. Therefore, They can't be recognize their building energy consumption situation. As a result, Small buildings are difficult to participate in energy efficiency retrofit. In this research, Building owners of buildings energy load recognition and energy efficiency retrofit possible participation was analysis though survey. Survey results, Most building owners don't know building energy load. But they have a good mind to retrofit building energy efficiency. As a result, If they have energy load information, they will be participate energy efficiency retrofit.
본 연구는 우리 기업이 해외공사를 수행하기 위한 초기 계획과정 중 특성별 리스크 분석을 통한 현실적인 미래 현금흐름을 예측하고자 하는데 그 목적이 있다. 이를 위하여 건설 공사 현금흐름에 영향을 미치는 리스크를 해당 국가의 경제적 여건에 따른 재무적 리스크와 프로젝트 특성에 따라 내부적으로 발생할 수 있는 프로젝트 리스크로 구분하였으며, 각각의 발생 특성에 따라 적합한 현금흐름에의 적용방안을 제시하였다. 재무적 리스크는 리스크 자체의 변동성에 기초하므로 Monte-Carlo 시뮬레이션 기법을 사용하여 현금흐름의 변화폭을 예측하고 민감도 분석을 실시하였으며, 프로젝트 특성 리스크는 실무자의 주관적 판단에 따른 리스크 발생가능성을 체크리스트 형태로 예측한 후 이에 대한 관리자의 수용여부에 초점을 두었다. 이 과정에서 리스크 태도와 공사규모에 기초한 주요 관리대상 리스크를 선별하는 방안을 제시함으로써 리스크 발생에 대비하기 위한 예비비를 산정하는 공동적인 척도를 마련할 수 있다. 또한, 기존의 리스크 분석과정에서 발생확률과 피해금액에 의한 기대값을 사용하는 것에 대해 문제를 제기하고, 동계적 확률을 구하기 어려운 건설 프로젝트의 특성에 맞게 피해 예상금액을 현금흐름에 적용하는 방안을 제시함으로써 현실적인 현금흐름 예측을 가능케 하였다.
정부는 재정 부담을 완화하면서 사회간접시설을 조기에 구축할 수 있는 SOC 민간투자사업 제도를 도입하여 적극 장려하고 있다. 민간투자사업의 비중은 2005년을 기준으로 전체 SOC 투자의 15%에 이를 만큼 크게 성장하였으며 이러한 성장세는 당분간 지속될 것으로 판단된다. 하지만 화려한 양적인 성장에 비해서 사업의 효율성, 생산성, 사업 규모의 적정성 등에 관한 문제점들이 지적되고 있다. 이에 본 연구에서는 민간투자사업에서 나타나고 있는 문제점을 도출하고, 이러한 문제점의 해결 방안으로 민간투자사업에 CM을 적용하는 방안을 제시하였다. 제시한 방안을 통하여 단기적으로는 SOC 민간투자사업의 효율성과 생산성을 증대시키는 효과를 얻을 수 있을 것이며, 장기적으로는 CM 적용의 좋은 사례(best practice)로 건설 산업 전반에 CM이 도입되는 촉매제가 될 것이다.
For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.
Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.
The 6th International Conference on Construction Engineering and Project Management
/
pp.714-715
/
2015
Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.