• Title/Summary/Keyword: construction cost estimation

Search Result 493, Processing Time 0.031 seconds

Economic Evaluation on a private electric Generation Application in Unelectrified Remote Islands in Korea (미 전화 도서 자가 발전방식 도입에 따른 경제성 검토)

  • Ahn, Kyo-Sang;Lim, Hee-Chun;Eom, Young-Chang
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.14 no.4
    • /
    • pp.348-358
    • /
    • 2003
  • According to Electricity Acceleration Law of Rural Area recently, the needs for replacement of a small scale diesel power generation facility which supplied electricity to 10-50 households Remote Islands has been revealed due to high operating and maintenance cost of Diesel Power Generation. Optimization of electric power system for Small Remote Islands must be made considering the economics, reliability and stability as power sources and estimation of total construction cost of those power stations. For its purpose, an assessment of power generation options such as Photovoltaic, Fuel cell, Wind-hybrid was implemented, economic evaluation of power supply shows the Photovoltaic, Fuel Cell for few household's islands and Diesel, Wind-hybrid for more inhabited islands. Power supplied by Diesel shows the best response to increasing electric demand and system reliability even with its lower economic value. Those who are in charge of power planning have to pay attention to system reliability, stability and operating characteristics of candidate's power supply besides its economics.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF

Spatial interpolation of geotechnical data: A case study for Multan City, Pakistan

  • Aziz, Mubashir;Khan, Tanveer A.;Ahmed, Tauqir
    • Geomechanics and Engineering
    • /
    • v.13 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Geotechnical data contributes substantially to the cost of engineering projects due to increasing cost of site investigations. Existing information in the form of soil maps can save considerable time and expenses while deciding the scope and extent of site exploration for a proposed project site. This paper presents spatial interpolation of data obtained from soil investigation reports of different construction sites and development of soil maps for geotechnical characterization of Multan area using ArcGIS. The subsurface conditions of the study area have been examined in terms of soil type and standard penetration resistance. The Inverse Distance Weighting method in the Spatial Analyst extension of ArcMap10 has been employed to develop zonation maps at different depths of the study area. Each depth level has been interpolated as a surface to create zonation maps for soil type and standard penetration resistance. Correlations have been presented based on linear regression of standard penetration resistance values with depth for quick estimation of strength and stiffness of soil during preliminary planning and design stage of a proposed project in the study area. Such information helps engineers to use data derived from nearby sites or sites of similar subsoils subjected to similar geological process to build a preliminary ground model for a new site. Moreover, reliable information on geometry and engineering properties of underground layers would make projects safer and economical.

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

Estimation of Bearing Capacity for In-Situ Top-Base Method by Field Experimental Plate Load Test (현장평판재하시험에 의한 현장타설형 팽이말뚝기초의 지지력산정)

  • Shin, Eun-Chul;Ahn, Min-Hye
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • The problems like a deterioration of loading bearing capacity, an exaggeration of settlement and lateral deformation are able to be generated, meanwhile structures are built in soft ground. Top-Base method is belonged to a rigidity mat foundation method which is used to surface treatment of soft ground. This method makes an effect to increase the bearing capacity of foundation using friction force, and prevent the differential settlement. Further more, the In-Situ Top-Base method has advantages in the phase of economic effect by reduction of the construction cost and offers an expediency on construction comparing with precast products. This paper presents the way of the estimation of bearing capacity for In-Situ Top-Base method through field plate load test in soft ground. It utilizes the results to a future design by analyzing the properties in the existing study and designs through these analysis and calculating the top-base method's reasonable range.

A Study on the Economic Estimation of the Recycling of Construction Waste (건설폐기물(建設廢棄物) 재활용(再活用) 과정에 대한 경제성(經濟性) 평가(評價) 연구(硏究))

  • Park, Won-Woo;Lee, Sang-Duck;Min, Bo-Ra;Park, Lee-Ran;Gim, Ui-Gyeong;Baek, Mi-Hwa;Kim, Dong-Su
    • Resources Recycling
    • /
    • v.17 no.2
    • /
    • pp.55-62
    • /
    • 2008
  • Amount of waste is always generated in industrialization process and it is gradually increasing. Domestic and industrial waste in 2003 increased by 9.5 percent than that of the last year(2002), whereas the amount of construction waste increased largely by 21 percent. Recently construction waste of total waste accounts for nearly 50 percent, waste concrete and Ascon from the construction waste takes up to 73 percent. Furthermore, amount of natural materials are gradually decreasing, that is, they are not sufficient any more. Owing to these reasons, the importance of recycling construction waste has been emphasized. The use of recycling aggregate makes the disposal of construction waste easier as well as protects environment from gathering raw aggregate. Also, it has the alternative effect economizing the insufficient new natural aggregate. This study employs the cost-benefit model to analyze the economic effect of construction waste recycling of Ascon which takes relatively high part of the total waste. The cost-comparison between raw aggregate and recycling aggregate were analyzed. With the model, the economic effect of Ascon recycling in 2003 and 2004 in capital area of Korea were analysed. Cost comparison between raw aggregate and recycling aggregate were also carried out. The result showed that the economic effect of Ascon recycling increased to 0.0808 for 2004 as compared 0.0694 for 2003. We could not conclude using above data, but this result shows that the economic benefit of Ascon recycling of construction waste has increased.

Study on the Design Automation of Steel House Shop drawing (스틸하우스 설계 자동화의 필요성과 적용방법에 관한 연구)

  • Won, Wan-Youn;Park, Hyeon-Soo
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.103-106
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997. Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object (BIM 기반의 공간객체를 이용한 물량산출 정확성 분석)

  • Cha, You-Na;Kim, Seong-Ah;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.