Estimation of Rock Drilling Work Size for Mountain Forest Road Construction
산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測)
- Ma, Sang Kyu (Forest Work Training Center)
- 마상규 (임업기계훈련원)
- Received : 1987.06.19
- Published : 1987.09.30
Abstract
Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.
임도시공예정지(林道施工豫定地)의 천공폭파에 따른 작업량(作業量)과 사업비(事業費)의 간이예측방법을 탐구하여 임도설계(林道設計)의 일반지침(一般指針)으로 활용하도록 하였다. 양양군 현남면 일대의 화강편마암지대에서 임도 5 km를 11개(個) 싸이클로 구분하여 20 m 측점단위별 산지경사를 조사하고 각 싸이클별 작업시간(作業時間) 재료량(材料量) 및 인력(人力)을 조사(調査)하였다. 분석결과(分析結果)에 의하면 산지경사(山地傾斜) 70% 이상(以上)인 사면(斜面)의 출현비율(出現比率)과 천공작업길이와의 상관성이 높아 이를 지표(指標)로 하여 작업량(作業量)을 추정(推定)하였다. 천공길이 총량을 추정할 수 있으면 공기압축기 가동시간(稼動時間) 착암인부수(人夫數) 및 소요(所要)화약량은 높은 상관성을 가지고 예측할 수 있다. 분석된 조사결과(調査結果)를 기초자료로 하여 산지경사(山地傾斜)에 따른 착암량과 이에 소요되는 기계 인력 및 재료량 추정치를 표(表) 5 와 같이 제시를 한다.