Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit  

Song, Tae-Hyeob (Korea Institute od Civil Engineering and Building Technology)
Seong, Jin-Uk (Department of Enviromental Engineering, Kumoh National Institute of Technology)
Publication Information
Journal of the Korean Recycled Construction Resources Institute / v.5, no.4, 2017 , pp. 427-434 More about this Journal
Abstract
The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.
Keywords
Unit level; Construction waste; New construction; Demolition work;
Citations & Related Records
연도 인용수 순위
  • Reference
1 MOCT (2012). Construction Standard Product.
2 Ministry of Environment. (2012). Korea Environment Corporation, 2011 Status of Waste Generation and Disposal Nationwide.
3 Kim, H.Y., Kim, C.H., Lee, C.G. (2004). A Study on EstimationCriteria of Construction, Korea Institute of ConstructionManagement.
4 Statistical Office. (2016). Construction Orders in 2016. Korea National Statistical Data, kosis.kr.
5 KEI. (2004). A Study on the Separation and Discharge of Construction Waste and Estimation of Generated Unit Cost.
6 Ministry of Environment. (2011). The 2nd Basic Plan for Recycling of Construction Waste.
7 KICT (2009). Construction Dismantling System of Construction Waste and Calculation of Proper Construction Cost, Ministry of Environment.
8 Kim, Y.I., Song, T.H., Lee, S.H. (2013). A study on classification and estimation of occurrence rate of construction wastes for improvement of material recycling rate, Journal of the Architectural Institute of Korea, 29(12).