The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

An Optimization Model for Concurring Landscape Detailed Design with Final Products (조경공사의 설계와 시공일치를 위한 최적 모형)

  • 이용훈;이기의;서옥하
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.4
    • /
    • pp.105-116
    • /
    • 2000
  • The purpose of this paper is to minimize differences between landscape detailed design (hereafter 'design') and final landscape construction products in working sites (hereafter 'products'). Ten landscape sites constructed in recent two years were selected to examine the differences. Differences in quantities and quality between design and products were surveyed and the results were analyzed with the 'differential analysis method'. The method employed in this paper can be used as an optimization model to minimize the differences between design and products. This paper suggests that every landscape field should mark less than 13.672% calculated from the 10% of total amount for excellent construction products. This should be approved by the president, according to the Clause 20 of General Conditions of the Contract, divided by the ratio of quantities affecting mainly he average Difference in Value between Design and Construction(DVDC). This value can be the critical point from the differential analysis method for the optimal maximum DVDC between landscape design and final landscape construction products in fields.

  • PDF

A Study on the Application of Smart Safety Technology at Construction Sites in South Korea

  • Choi, Ji-Sun;Hwang, Hoon-Hee;Ryu, Suzy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.153-161
    • /
    • 2022
  • Among all industries, the construction industry still remains a traditional one with low productivity due to its labor-intensive and field-dependent production system, its supplier-oriented industrial structure, and the disruption of the information flow between participants. In addition, the construction industry in South Korea has recently been required to transform itself according to social trends such as aging, the reduction of skilled workers, and the shortening of working hours, and the disaster and death rates in the industry, which are more than twice as high as those in other industries, are making it more necessary to solve chronic safety problems. Therefore, the purpose of this study is to grasp the actual condition of safety management on construction sites in South Korea and analyze cases of K-smart technology utilization for preventing safety accidents on construction sites. The study investigated and analyzed the following. First, construction sites in South Korea were analyzed by type of safety accident, by type of construction, and by construction contract amount. Second, the current status of accidents on small-sized construction sites with a high fatal accident rate and cases of safety accidents on construction sites were investigated. The results of the study are expected to contribute to the dissemination and spread of smart safety technology for not only identifying major factors in safety accidents that occur on construction sites but also preventing workers from suffering accidents.

  • PDF

The Current Situation of Construction Arbitration and Suggestions to Increase its Use in Korea (우리나라의 건설중재 현황과 활성화 방안)

  • Chae Wan-Byung
    • Journal of Arbitration Studies
    • /
    • v.14 no.2
    • /
    • pp.243-279
    • /
    • 2004
  • The construction arbitration field has developed considerably since the latter half of the 1990s. Through analysis of construction arbitration cases taken up by KCAB, this paper intends to show the present condition and the improvement direction of construction arbitration in Korea. The number of construction arbitration cases filed at KCAB has been increasing rapidly after 1997, but recently the rate of increase has tended to decline. From 2000 to 2003 the number of arbitration cases increased 23% each year, on average, but in 2003 the increase was only 7.6%. In the very beginning, public construction claims made up the majority of all construction cases, however, civil construction claims are increasing gradually. The arbitration amount in the construction field is very high, owing to public construction claims. For example, the arbitration amount per case was 5 billion won, on average,. in the public construction field. It is shown that the claimants of arbitration are mostly constructors and the main reasons for making claims are to demand payment for construction and payment for additional work. KCAB investigated the performance status of arbitration awards. The voluntary performance rate for awards in construction arbitration is nearly 80% and in 11%, a suit was filed to appeal the arbitration award. In spite of the development of construction arbitration, some improvements are requested. There have been arguments about the effectiveness of selective arbitration agreement in the General Terms of Construction Contract. This has caused a decrease in arbitration cases, so improvements in this dispute settlement clause need to be made. Enforcement of arbitration awards is granted by the judgment of a court. Resulting from this, appeals for arbitration awards are not allowed, however, up to three appeals for the enforcement of awards are allowed in court. As such, the enforcement system for arbitration awards needs to be improved and simplified.

  • PDF

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.