Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects  

Baek, Seung-Ho (Construction Management.Economic Research Devision, Korea Institute of Constructin Technology)
Kang, Tai-Kyung (Construction Management.Economic Research Devision, Korea Institute of Constructin Technology)
Lee, Yoo-Sub (Construction Management.Economic Research Devision, Korea Institute of Constructin Technology)
Publication Information
Journal of the Korea Institute of Building Construction / v.12, no.1, 2012 , pp. 108-114 More about this Journal
Abstract
Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.
Keywords
previous bid price; escalation method; construction cost index;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Public Procurement Sevice. Practice & Casebook on Price fluctuation[Internet]. DaeJeon: Public Procurement Sevice; 2003 nov [cited 2009 nov1]. 322 p. Available from:http://www.pps.go.kr/user.tdf?a=user.board.BoardApp &c= 2001&board_id=P_03_03_03&mc=P_03_03_03
2 Ministry of Government Legislation. Enforcement Degree, Enforcement Regulation of Contract to which The State is a Praty[Internet]. Seoul: Ministry of Government Legislation, 2009 oct [cited 2011 oct 28). 19 p. Available from :http://www.law.go.kr/lsSc.do?menuId=0&subMenu=4&query=
3 Ministry of Strategy and Finance. Government Contract Regulation[Internet]. Gwacheon: Ministry of Strategy and Finance, 2007 may [cited 2011 may 13). 304 p. Available from: http://www.mosf.go.kr/law/law03b.jsp
4 Kim KS, Hyun CT, Hong TH, Jo SM, Mun HS. Development of an unit cost modification model for proper actual cost data in small building construciton projects. Journal of the Korea Institute of Building Construction. 2010 Jun 20;10(1):81-84.   DOI
5 Kang YS, Kwon SW, Kim CG. The comparison analysis between quantity per unit method and past actual data input method for construction cost. Proceedings of Korea Institute of Construction Engineering and Management; 2006 Nov 11; Kyung Hee University, Suwon (Korea). Seoul (Korea): Korea Institute of Construction Engineering and Management;2006. p. 82-85.
6 Hwang SW. Historical cost index [Internet]. DaeJeon: Public Procurement Sevice; 2006 sept [cited 2011 sept 21]. 28 p. Available from:
7 http://www.pps.go.kr/user.tdf?a=user.board.Board App&c=2001&board_id=P_03_05_03&mc=P_03_05_03
8 Kim SH. The rationalization of contract sum adjustment through case study of price fluctuation adjustment based on index adjustment method. Journal of Korea Institute of Construction Engineering and Management. 2011 Jul 21;12(4):71-7.   DOI   ScienceOn
9 Jeong KC, Kim YA, Kim YS. Problems and improvement schemes to historical cost fluctuation ratio calculation according to the excalation. Proceeding of Korea Institute of Construction Engineering and Management; 2008 Nov 7; Korea University. seoul (korea): Korea Institute of Construction Engineering and Management; 2008. p. 884-88.
10 Cho HH, Doe GY. Improvement of contract sum adjustment method caused by price fluctuation using construction cost index. Journal of Korea Institute of Construction Engineering and Management. 2005 Feb 21; 6(1):162-68.
11 Lee JS, Shin YC. Improvement on the managerial method of price fluction system. Journal of Korea Institute of Construction Engineering and Management. 2011 Mar 21;12(2):5-6.