• Title/Summary/Keyword: construction CALS system

Search Result 73, Processing Time 0.027 seconds

A Study of IDEF Modelling on the Construction Project (건설사업에 IDEF 모형화에 관한 연구)

  • Kwon, Oh-Ryong;Yuem, Jun-Koun
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.117-124
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry. Acquisition and supply process of the system are represented by IDEFO function models and FCIC information systems are briefly described in this paper. The model presented here can be used as a reference for the development of CALS system.

  • PDF

A plan of improvement and DB analysis for the elevation of CALS System performance (건설CALS시스템 성능향상을 위한 DB분석 및 개선방안)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.31-33
    • /
    • 2012
  • 국내 건설공사의 기획 설계 시공 유지관리 전 단계에서 발생하는 방대한 정보를 제공 중인 건설CALS시스템은 국토해양부 뿐만 아니라 건설사 및 1,400여 곳 이상의 건설현장에서 사용 중인 시스템이다. 그러나 건설CALS를 구성하고 있는 단위 시스템들의 개발 시기 및 주체가 달라 통합 기능개선 운영 단계에서 DB의 논리적 구조가 복잡하게 변경되어 데이터 누락, 처리속도 저하 등의 문제가 발생하고 있다. 이에 본 논문에서는 건설CALS를 구성하고 있는 4개 시스템의 DB를 분석하여 개선이 필요한 항목을 도출하고 취약한 부분의 개선방안을 제시하였다. 제시된 방안은 DB시스템을 운영하는데 있어 가장 기본적인 방법으로써 쿼리문의 처리속도 및 DB장애 발생 시 복구능력 향상 등을 통해 시스템의 안정적이고 효율적인 운영이 가능하다.

A Study on Adaption of eGoverment Standard Framework to the CALS System (건설CALS시스템 전자정부 표준프레임워크 적용을 위한 사전 분석)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.751-753
    • /
    • 2013
  • '98년 건설CALS기본계획을 바탕으로 개발된 건설CALS시스템은 건설사업관리 건설인허가 단위시스템을 시작으로 시설물유지관리 용지보상 건설CALS포탈 등 5개 단위시스템을 개발하여 운영중에 있으며 국내 900여개 이상의 건설현장 및 건설 관련 공공기관에서 사용하고 있다. 그러나 각 단위시스템의 개발 시기 도구 등이 서로 상이하여 사용자 요구사항 및 법령 개정에 따른 시스템 개편 등 외부 환경변화의 패러다임을 적용하기 어려운 실정이다. 이에 본 논문에서는 각 단위 시스템의 구조적 요소를 통일하고 외부환경의 적용이 가능한 전자정부 표준프레임워크의 적용 가능성을 분석하였다. 이는 객체 지향 중심의 웹 시스템 구조를 프레임워크 기반으로 변경하는 것으로써 시스템 재사용성이 향상되고 신규 기능 추가가 용이해지며 리소스 절감이 가능할 것이다.

The content based standard data search technology under CALS integrated data environment (국방 CALS 통합 데이터 환경을 위한 내용 기반의 표준 데이터 검색 기술 개발)

  • Jeong, Seung-Uk;U, Hun-Sik
    • Journal of National Security and Military Science
    • /
    • s.2
    • /
    • pp.261-283
    • /
    • 2004
  • To build up the military strength based on information oriented armed forces, the Korean ministry of national defense (MND) promotes the defense CALS (Continuous Acquisition and Life cycle Support) initiative for the reductions of acquisition times, improvements of system qualities, and reductions of costs. These defense CALS activities are the major component of the underlying mid and long term defense digitization program and the ultimate goal of program is to bring a quick victory by providing real-time battlefield intelligence and the economical operations of the military. The concept of defense CALS is to automate the acquisition and disposition of defense systems throughout their life cycle. For implementing defense CALS, the technology for exchange and sharing CALS standard data that is created once and used many times should be considered. In order to develop an efficient CALS information exchange and sharing system, it is required to integrate distributed and heterogeneous data sources and provide systematic search tools for those data. In this study, we developed a content based search engine technology which is essential for the construction of integrated data environments. The developed technology provides the environment of sharing the CALS standard data such as SGML(Standard Generalized Markup Language) and STEP(Standard for The Exchange of Product model data). Utilizing this technology, users can find and access distributed and heterogeneous data sources without knowing its actual location.

  • PDF

Construction of Korean Korea CALS Standardization (한국적 CALS 표준화 구축방안)

  • 김철환;김규수;신영인
    • The Journal of Society for e-Business Studies
    • /
    • v.1 no.1
    • /
    • pp.117-140
    • /
    • 1996
  • CALS is recognized as a national response to the new chapter of information society. It is essential that the standardization in Korea should be constructed compatible with not only domestic but also international standardization trend. This study aims to propose a proper direction of CALS standardization in Korea, based on the international CALS standardization movement. This paper classifies standard into five types and provides a proper direction and guidance far each standard. As a trend of CALS standard, all ten data files are converted using SGML standard far the interchangeability of data among heterogenous systems. CAD and Graphic data arc also moving toward to the STEP as their standard. In this regard, this paper discusses how to implement SGML and STEP Model. Finally, this paper proposes a method how to construct an EDI system with CALS standard and how to establish a standard authorization institute which will be responsible far the standard authorization. Furthermore, this paper also proposes the CALS Test Network (CTN) as its experimental method.

  • PDF

Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System (건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Smart Media Journal
    • /
    • v.4 no.4
    • /
    • pp.70-79
    • /
    • 2015
  • The Construction Project Information System(CPIS), an information system constructed as part of the Construction Continuous Acquisition & Life-cycle Support(CALS) of the Ministry of Land, Infrastructure, and Transport(MOLIT), is designed to digitize construction projects across all stages, and enable sharing of information so as to enhance the productivity and efficiency of construction projects and secure their transparent administration. One of MOLIT's internal work systems, CPIS focuses on work-handling and data management. However, now over 10 years old after its construction, it focuses on text and document-based construction project information, but it cannot be interfaced with the visualization-based GIS, which limits the sharing and dissemination of information and the determination of the overall construction project status. To resolve the existing CPIS limitations and problems and to upgrade the system, this study examined domestic and overseas GIS technology trends and relevant information systems, and analyzed the CPIS status and problems. It thus proposed total GIS application measures to upgrade CPIS. Also, it identified detailed CPIS utilization measures and GIS application measures by unit system, and analyzed considerations for GIS application.

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

CALS System Development Methodology Using Document Trace Diagram and IDEF Model (Document Trace Diagram 과 IDEF 모델을 이용한 CALS 시스템 개발 방법론)

  • Kim, Soung-Hie;Cho, Sung-Sik;Lee, Jae-Kwang;Han, Chang-Hee;Yoon, Young-Suk
    • Asia pacific journal of information systems
    • /
    • v.8 no.3
    • /
    • pp.37-49
    • /
    • 1998
  • The basic goal of CALS is to improve transactions and relationships among organizations through information sharing and integration. CALS is an information strategy which needs strong cooperation between organizations or between users and developers in design step. However, current design methodologies using IDEF models, that are considered to be standard for CALS system development, has some limitations. For example, it is difficult for system developers to communicate with counterparts by IDEF model since IDEF models are difficult for counterparts to understand. In this paper, we suggest a development methodology for GALS systems by complementing IDEF model with Document Trace Diagram, which we developed as a communication tool, The concept of Document Trace Diagram stems from the fact that most information exchanged within or between organizations is in the form of documents and most standard operating procedures of organizations are about processing the documents. It helps system developers identify functions and their ICOMs (Input, Control, Output, Mechanism) with ease and little communication cost. With this methodology, we have constructed the GALS prototype system for construction industry.

  • PDF

Research on the Plans of Construction Information for National Infrastructure in Public Construction Projects (공공건설사업에서의 국가기반시설 건설정보 서비스 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.12
    • /
    • pp.1026-1035
    • /
    • 2013
  • The construction field is implementing cost savings and business process improvements by adopting and applying various information technologies to secure the construction sector's technological competitiveness amid the economic recessions inside and outside South Korea. Therefore, affiliated agencies of the Ministry of Land, Infrastructure, and Transport are reinforcing transparency and efficiency in construction project management through informatization. These agencies are also performing construction project management and maintenance and management businesses by constructing various information systems to create higher added values and secure competitiveness. However, as the application of the constructed information system is limited to a portion of public construction projects, it is not yet possible to understand the whole status of the national infrastructures. Therefore, this paper aims to propose a construction information service plan, its future promotion method and procedure of application on the entire national infrastructures. This plan would be carried out by collecting, linking and fabricating the main construction information from the information systems of the affiliated agencies around the construction project information system(Construction CALS System) being applied at the organizations under the Ministry of Land, Infrastructure, and Transport. Such a plan is expected to facilitate effective project management and maintenance of public construction projects and serve as a useful tool for major decision making endeavors such as future policy planning. The proposed plan is also expected to facilitate the management and application of construction information from the construction up to the maintenance management of the national infrastructures.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.