A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects  

Kim, Seong-Jin (Department of Future Technology and Convergence Research, Korea Institute of Civil Engineering and Building Technology)
Kim, Bum-Soo (Department of Future Technology and Convergence Research, Korea Institute of Civil Engineering and Building Technology)
Kim, Tae-Hak (Department of Future Technology and Convergence Research, Korea Institute of Civil Engineering and Building Technology)
Kim, Nam-Gon (Department of Future Technology and Convergence Research, Korea Institute of Civil Engineering and Building Technology)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.20, no.11, 2019 , pp. 208-216 More about this Journal
Abstract
Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.
Keywords
Life Cycle; Construction Project Information; Information Integration; DB Standardization; CALS;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Moo-young-Yoo, Chang-Shik Choi, "A Study of Resource Management System on Construction Site Using IoT", Korea Concrete Institute, 2017.
2 Hyung-Guk Lee, Hong-Cheol Lee, Dong-Eun Lee, "Developing IoT-based Construction Progress Measurement Prototype", Journal of the Architectural Institute of Korea Structure & Construction, 2015.11.
3 In-Hyeok Eom, Don-Hee Kim, "A Study on the Integrated Management System for Quality Inspection & Test Report of Construction Project", Korean Society of Civil Engineers, 2018.10.
4 Du-Hyun Yim, Jeong-Woo Park, Kwang-Woo Nam, "Plans for the Integrated Operation of Intelligent Service Facilities", Journal of the Korean Association of Geographic Information Studies, 2017.3.
5 Kwang-Tae Na, Byeung-Hee Kang, "The Establishment of an Activity-Based EVM - PMIS Integration Model", Journal of the Korea Institute of Building Construction, 2010.2.
6 Gu-Chun Jung, Efficiency Improvements for PMIS Using IT Technology, Master's thesis, Chung-Ang University, Seoul, Korea, pp.12-13, 2012.
7 Sang-Ho Lee, "Status & Problems of Total Project Cost Mangement System", KRIHS vol. 44, 2005.
8 Young-Jin Kang, A Study on Contract System for Longterm Government Construction Projects, Master's thesis, Korea Unversity, Seoul, Korea, pp.14-35, 2003.
9 KICT, 18 Operation and Technical Improvement of Construction CALS System(I), 2018.12.
10 MOEF, Total Project Cost Management Guideline, 2018.7.