• Title/Summary/Keyword: bus rapid transit system

Search Result 19, Processing Time 0.032 seconds

A Study on the Improvement of Pavement for Bus Rapid Transit System in Seoul (서울시 중앙버스전용차로 포장방법 개선방안 연구)

  • Bae, Yoon Shin;Kwon, Wan Taeg;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • PURPOSES: This study is to suggest the improvement for bus rapid transit system in Seoul METHODS: The maintenance cost for bus lane damages and plastic deformations are increased by bus passing speed, heavy bus weight, and climate change (localized torrential downpour, subtropical climate) and the accident risk has been increased. RESULTS: Recent analysis of pavement damage indicates that bus lane damage caused by heavy weight is overwhelming and it is urgent to prepare countermeasures. CONCLUSIONS : Pavement data of bus rapid transit system, bus transit numbers and pavement damage elements were analyzed. By analyzing pavement maintenance, design and construction, the countermeasures for the improvement of bus lane pavement and effective maintenance were suggested.

Review of Intermodal System of AGT and Bus (AGT와 버스의 혼용시스템에 대한 고찰)

  • MOK Jai Kyun;Chang Se Ky;Yoon Hee Taek;Woo Yoon Seuk
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.58-63
    • /
    • 2003
  • This study shows the functional contribution into the public transportation system for congestion area. And there is a introduction for the rapid bus transit developed in Europe community. It can be classified the public transportation as urban transit, subway and bus. For a few years, it has been introduced the AGT system as a role of the alternative and lengthening system of subway line. Recently, there is going on construction of AGT system in some regional cities. The AGT system has advantages in terms of accessibility and cost-effective rather than subway. But the bus system is advantageous at the points rather than AGT system. It is obvious that the bus system is most cost-effective for infrastructure and system rather than any other public transports. If the bus system has punctuality and precise docking, that becomes best choice for public transportation scheme. There are tries to develop new systems by means of the f1les up the advantages in bus and AGT system, which can be classified as BRT(Bus Rapid Transit}. The idea is simple; 'Thirik rail, use advanced buses.' It is introduced the IRISBUS system at this article, which was developed in Europe community. And it is introduced the project architecture to develop the similar system to IRISBUS in KRRI through National Transportation Key Technology R&D Project

  • PDF

Fuel Cell Track Rapid Transit for Metro Area (도시형 연료전지 궤도차량 시스템)

  • Chang, Seky;Mok, Jai-Kyun;Moon, Kyeong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.842-846
    • /
    • 2004
  • Both traffic congestion and air pollution in the metropolitan area can be greatly relieved by promoting the use of public transportation with zero emission system. Bus and subway are very convenient means for the people moving in the route areas. But they are not enough to satisfy handicapped or old people to have access to them and also do not solve environmental problems completely. New vehicle system, fuel cell track rapid transit, will be introduced as a countermeasure for such problems in the present paper.

  • PDF

A Study on DRT System Introduction for Aging Society : A Case Study on Kimhae City (고령화사회의 DRT(Demand Responsive Transit)시스템 도입방안에 관한 연구 - 김해시를 중심으로 -)

  • Oh, Yun-Pyo;Kim, Jae-Youl
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.3
    • /
    • pp.27-36
    • /
    • 2008
  • Rapid increase of aging population and progressed migration from rural areas to urban areas have caused deficit of bus routes in local cities. This increasing burden of operation deficit affects the movement strategy of the transportation vulnerable who are using buses. Along with dramatically increased aging in Korea, there is an urgent need to implement a new method which can guarantee mobility rights of public transportation especially for the elderly. This study focuses on the case of Demand Responsive Transit(DRT) system that has been operating in America, Europe, Japan, etc. Kimhae(Sangdong-myeon and Saengnim-myeon) is selected as a study area. This study investigated the possibility of adopting DRT system on the perspectives of the consumer and provider by the analysis of traffic condition such as the number of transportation vehicles, present bus service and regulation and conduct of questionnaire survey which includes present bus service and DRT system and so on. In conclusion, DRT system in Kimhae city will reduce transport cost, increase affordability through the betterment of service level and secure mobility rights for the transportation vulnerable.

Safety Analysis on Pedestrian Crossings in Urban Corridors with Bus Rapid Transit System (중앙버스전용차로 횡단보도의 보행 안전도 평가)

  • Han, Sang-Jin;Kim, Kewn-Jung
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.1-8
    • /
    • 2008
  • Seoul metropolitan government has introduced Bus Rapid Transit (BRT) systems in some major urban corridors on July 1st, 2004, and has reported that it was successful on the ground that bus speed has been increased in the corridors with BRT system and that it has also resulted in the increase of bus patrons. However, there comes a negative claim that BRT has increased the number of fatalities in the same corridors. This study first aims at developing safety evaluation indicators of pedestrian crossings, then compares values of those indicators from pedestrian crossings with and without BRT systems. The safety evaluation indicators of pedestrian crossing are developed as: the number (or ratio) of conflicts between pedestrians and vehicles, the number (or ratio) of vehicles violating pedestrian signals, the number (or ratio) of pedestrians remaining crossings at red signals, and the number (ratio) of pedestrians walking beyond crossing areas. When we compare values of these indicators for both pedestrian crossings with and without BRT system, it has turned out that crossings with BRT systems has more number of conflicts than the crossings without BRT systems, but it cannot be said that the ratio of conflicts will be different between two crossing types. It means that the number of conflict will increase as the number of pedestrians and vehicles in the crossings. When we note that BRT system intrinsically attract more number of pedestrians who get-in or get-off bus stops, we cannot said that BRT system will be safer for pedestrians.

  • PDF

A Study on Design Specifications and Evaluation of Structural Strength for PRT (소형궤도차량(PRT) 차체의 설계사양 도출 및 구조강도 평가 연구)

  • Cho, Jeonggil;Koo, Jeongseo;Kang, Seokwon;Jeong, Raggyo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.4
    • /
    • pp.144-152
    • /
    • 2013
  • PRT(Personal Rapid Transit) system is a new transportation system which will meet increasing demands of traffic in Korea. It is also an environment-friendly transportation and automatically operated. For these reasons, researches on the PRT system are actively undergoing, but the PRT vehicles have different forms of subway, bus, etc. There are no design standards to evaluate structural integrity, yet. In this paper, Structural design specifications are derived, which are based on the performance test standard for EMU and the ASCE-APM standards. We also perform the static and fatigue analyses by FE simulation and suggest strategies to improve an initial structure design. In addition, we derived the design specifications for energy-absorbing structures to meet the conditions of the collision scenarios predefined from a view point of operation safety.

The Research on Transportation Systems Development in Sejong City (세종특별자치시의 발전을 위한 교통체계 연구)

  • Ju, Yong-Jun;Ryu, Chang-Su;Park, Hyo-Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.11
    • /
    • pp.2738-2744
    • /
    • 2014
  • For balanced development of the Sejong City, early settlement in transport infrastructure should precede the most. Of various means of transport, this study focus on BRT(Bus Rapid Transit) and the railway. Than the subway construction costs only a tenth. Equipped with a system of underground transport capacity to significantly increase the new concept of public transport in the BRT, utilizing the existing line railway to be constructed broad Chungcheong. The extension revolves 1 line of Daejeon subway to Jeongbuse kind government complex and the communication facilities is cooked for the rapid increase in the transportation demand according to the before central administration organization and Sejong city inflow of population.

Study on the Standard Specification of Linear Induction Motor Type Light Rail Vehicle Electrical Equipment (선형유도모터형식 경전철 전기장치 표준사양 연구)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Ryu, Sang-Whan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1181-1182
    • /
    • 2007
  • Light Rail Transit (LRT) System is an urban transit system which has approximately an intermediate transportation capacity between conventional subway and bus ($5,000{\sim}25,000$ persons per hour and per direction). It is a high-tech system which operational capacity, punctuality and mobility are remarkably improved. There are some types of LRT systems such as monorail, tramway, AGT(Automated Guideway Transit), and so on. The LRT systems have been applied and being operated in about a hundred lines around the world and many projects that apply the LRT systems in Korea are being proceeded and scheduled. For the efficient management, economical construction, and safe operation of various LRT systems, the establishment of national standard is necessary such as vehicle standardized specification, vehicle performance test standard, vehicle safety standard, construction guide, operation regulation, etc. of LRT systems. This paper presents the standard specification of electrical equipment of linear induction motor type light rail vehicle, that is LIM AGT(AGT system propelled with linear induction motor) vehicle. The LIM AGT system has been applied in Japan subway and ART(Advanced Rapid Transit) system of Canada and Yongin LRT is currently under construction.

  • PDF

Importance and Satisfaction Rating Assessment of users Regarding BRT Facility and Operation : The Case of Busan (BRT 시설 및 운영에 관한 이용자의 중요도 만족도 평가 : 부산광역시를 중심으로)

  • Kim, Seong Eun;Jung, Hun Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.595-603
    • /
    • 2019
  • To alleviate the demand on private car that is constantly increasing, Busan Metropolitan City (BMC) has established Bus Rapid Transit (BRT) to revitalize public transportation. But there are no unified lane system between BRT and general bus stations, which makes off-lane turning general bus to contribute to congestion. And as the bottleneck phenomenon at entrance/exit accelerates the congestion, there has been huge dissatisfaction among commuting drivers. Therefore, this study identifies efficient methods to operate better through measuring civilian awareness. We evaluate both satisfaction and drawbacks on BRT service with Importance-Performance Analysis (IPA). We first distinguish the groups by the awareness on BRT and their main transit usage, and then clarify the difference between the groups. And as a result, the group who is positive to BRT and uses buses often demands improvement in bus indoor comfort and curbing jaywalking. On the other hand, group who is negative to BRT and uses private cars often demands improvement in lane changing and the moving speed of private cars. We next examines the groups with MDPREF, one method of Multidimensional Scaling (MDS). And we have clarified that the evaluating criteria and the individual attributes of the groups corresponds very well.

Determination of the Optimal Bus-stop Location and Headway of Bus Rapid Transit Using Bus-stop-based O-D Data (급행버스 노선의 정류장 위치 및 배차간격 결정에 관한 연구 (노선별 정류장간 O-D 자료를 활용하여))

  • Cho, Hye-Jin;Lee, Young-In
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.63-74
    • /
    • 2005
  • When we introduce the BRT systems, it is very important to decide the operating factors, such as bus-stop locations or headway. If the factors are inappropriate, unessential expenses for the operator and users of the bus line may be caused, and it leads increase of social total cost. So, it is necessary that we consider users' origin and destination of each bus line when we set location of bus-stops and the optimal headway. Meanwhile, Smart Card System was introduced of fare collection for the Public Transportation Reform in Seoul last year. This new card system makes it possible to store up the information about bus operating and passenger's trip link. With these substantial information. we can estimate bus-stop-based O-D table. So, in this thesis, it was studied a systematic methodology to find the optimal location and headway for skip-stop bus system (as a type of first step for BRT). The proposed methodology in this thesis is expected to be useful to effect analysis or setting operating factors for skip-stop bus system in each bus line.