The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

A study on the improvement of The standard specifications for Mock-up Test in the Curtain-wall construction (Curtain-wall공사에 있어서 Mock-up Test 건축공사표준시방서의 개선 방안에 관한 연구)

  • Lee Jin-Man;Kang Jae-Wang;Son Yong-Geun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.491-494
    • /
    • 2003
  • Curtain wall (for the outside wall) must be designed and constructed to resist weather condition of nature like rain. wind and surrounding environment. So, Now days, Mock-up test of curtain wall's total capability is generally used for skycraft building. But, Mock-up test specification in korea is so weak that there are lots of disputation. Also, lacking of clearness in specification causes many trouble in adaptation. Therefore, I would like to consider the problem of Mock-up test specification by inspecting and comparing with other country's works. and I will mention the way of approvement in our specification.

  • PDF

A study on the Chronological Recordings and construction method of Wooden Pagoda Sites of Baekjae (백제(百濟) 목탑지(木塔地) 편년(編年)과 축기부(軸基部) 축조기법(築造技法)에 관한 연구(硏究))

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.17 no.4
    • /
    • pp.65-82
    • /
    • 2008
  • The wooden pagoda sites which have been confirmed in Baekjae's former territory so far have flattened surface of the earth or foundation pert made by digging up the earth. In particular, the latter is found more often in the pagoda sites of Baekjae, which is essential and absolutely necessary because of the characteristics of pagoda structure. The wooden pagoda sites with foundation part made by digging up the earth under the stylobate are found at Yongjeongli ruined temple site of Woongjin area, and at Neung-sa temple site, Wangheung-sa temple site, Geumgang-sa temple site, and Mireuk-sa temple site of Sabi period. They are also observed at Hwanglyong-sa nine-storied wooden pagoda of Shilla and at Biin five-storied stone pagoda of early Goryeo. They are important data improving that the construction technologies of Baekjae continued to be applied to build stone or wooden pagodas, transcending time and space. Recently, the site assumed as a wood pagoda site of Hanseong area was examined in Gyeongdang sect ion of Pungnap mud fortification. If this is proved to be a real wooden pagoda site, this digging-up construction technology of foundation part ann be concluded to be a traditional engineering technology of Baekjae which was frequently used from Hanseong period to Sabi period. On the other hand, this digging-up construction technology of foundation part has been found only at pagoda sites and main building sites of temple ruins, and it helps examine their symbolism.

  • PDF

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Identifying Correction Range of Geomagnetic Field for Indoor Positioning of Workers at Construction Site (건설현장 내 작업자 실내측위를 위한 지구자기장 보정 범위 도출)

  • Kim, Hyeonmin;Ahn, Heejae;Lee, Changsu;Kim, Harim;Ko, Youngwoong;Cho, HunHee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.93-94
    • /
    • 2022
  • Although various studies about indoor positioning systems, such as beacon and Wifi, have been conducting for indoor positioning of workers at construction sites, these systems have limitations in terms of accuracy or economics. To overcome these limitations, geomagnetic field sequence-based indoor positioning technology can be a good alternative. However, it is necessary to correct the geomagnetic field near the construction material stocking area since the geomagnetic field can be distorted near construction materials such as rebars. Therefore, this study conducted an experiment for identifying correction range of geomagnetic field near the construction material stocking area. It was analyzed that the geomagnetic field should be corrected up to 60cm in the horizontal direction from the stocking point if the height of stocking area for rebars is 40cm or more. This study can be used for important reference for development of geomagnetic field sequence-based indoor positioning technology suitable for construction sites.

  • PDF

A Study on the Heat Resistance of Light-Weight Polymer Concrete Composites (경량 폴리머 콘크리트 복합체의 내열성능에 관한 연구)

  • Jo, Young-Kug
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.131-137
    • /
    • 2008
  • In recent years, the light-weight aggregate has widely been used to reduce the weight of construction structures, and to achieve the thermal insulation of building structures. The purpose of this study is to evaluate the heat resistance of polymer concrete composites with light-weight aggregate made by binders as resin and cement with polymer dispersion. The light-weight polymer concrete composites are prepared with various conditions such as binder content, filler content, void-filling ratio, light-weight aggregate content and polymer-cement ratio, and tested for heat resistant test, and measured the weight reducing ratio, strengths and exhaustion content of gas such as CO, NO and $SO_2$. From the test results, the weight reducing ratio of light weight polymer concrete using UP binder after heat resistance test increase with an increase in the UP content irrespective of the filler content. The weight reducing ratio of polymer cement concrete is considerably smaller than that of UP concrete. In general, the strengths after heat resistance of polymer concrete composites are reduced about 40 to 65% compared with those before test. The exhausted quantity of CO, NO and $SO_2$ gases in polymer concrete composites is less than EPS(Expanded poly styrene). From the this study, it is confirmed that the many types gases discharge according to binder type of polymer concrete composites, its amount is controlled by selection of the binder type and mix proportions.

Standardization of Impact Test Methods of Non-bearing Lightweight Wall for Building (건축용 비내력 경량벽체의 내충격성 시험방법의 표준화)

  • Kim, Ki-Jun;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.181-182
    • /
    • 2015
  • The use of non-bearing light weight wall has increased recently due to the increase of high-rise buildings and supply of long-life housing. Light weight wall has advantages such as reducing the self-weight of the building, convenience in installation, and shortening construction period, however, must have a sufficient strength to external force. This study standardized the impact resistance test method for light weight walls by using the actual impact load obtained through load analysis test in previous studies. The impact resistance test method was divided into the test method that uses soft body and the one that uses hard body. The size of specimen was set up as height 2.4m and width 3.0m. The size and shape of the body followed those used in BS 5234-2 and so on for the compatibility with the test method used overseas. The judgment criteria for impact resistance based on test results were not defined uniformly as the assessment of functional damage can vary depending on the type of material, structural method, purpose of wall, and so on even when the same impact load was applied.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

A Study on the Environmental Impact Assessment for Passive Apartment based on Life Cycle Assessment (LCA에 기초한 패시브 공동주택의 친환경성 평가에 관한 연구)

  • Gong, Yu-Ri;Tae, Sung-Ho;Song, Suwon;Roh, Seung-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.537-543
    • /
    • 2014
  • As environmental matters such as Green House Effect rise, many construction industries are putting an effort on minimizing environmental impact in terms of building life cycle throughout the world. However, in South Korea, evaluating the eco-friendly building based on life cycle assessment has been facing an academic ostracism while the most studies are focusing on assessing the 6 environmental impact assessments of passive apartment based on life cycle assessment. The theoretical consideration of the life cycle assessment and environmental impact category were performed and the direction of the study was set up. Also, existing apartment and passive apartment, which had same structure and same type were chosen and building materials per unit area were compared to find out the difference environmental impact for building life cycle. As a result, passive apartment was rated as low level among the 6 environmental impacts. Also, effect of building material on passive apartment was more important than its operational stage.