A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System (시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로)

  • Won, Ji-Sun;Cho, Geun-Ha;Ju, Ki-Beom
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.4
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

BIM-based Design Verification Performance Analysis with Priority Rules Applied (우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석)

  • Huh, Seung-Ha;Shim, Jae-Hyeong;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.1-11
    • /
    • 2021
  • BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.

A Study on the Rule Development for BIM-based Automatic Checking in a Duct System (덕트설비의 BIM 기반 자동검토를 위한 규칙개발에 관한 연구)

  • Song, Jong-Kwan;Cho, Geun-Ha;Ju, Ki-Beom
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.11
    • /
    • pp.631-639
    • /
    • 2013
  • This study derives quality checking items in Building Mechanical Systems Design Criteria, and suggests quality criteria to review BIM models in the duct system of an air conditioning system for rule-based automatic checking. First, components for the duct system of an air conditioning system were reviewed, and the quality checking items were drawn from Building Mechanical Systems Design Criteria, through assessment according to object, attribute and relationship composing the BIM model. Second, quality checking types were derived, by analyzing the quality checking items and Rule set of the Solibri Model Checker. Finally, methods of algorithm functioning for checking the BIM models for mechanical systems in computers were drawn, and Elements to comprise the quality checking criteria (rule) were suggested. This study means that that checking items are derived from domestic criteria, and a way for the development process of determining quality checking criteria (rules) is suggested.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

Developing a 3D BIM for Earthwork Construction

  • Moon, Sungwoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.245-247
    • /
    • 2015
  • The Building Information Model (BIM) is gaining wide popularity in the construction industry. This attempt is, however, limited to a predefined operation of structural facilities. The application of BIM can be extended to include undefined operations in earthwork construction. The objective of this paper is to introduce the concept of an earthwork BIM environment that is currently under development in the Construction System Laboratory at Pusan National University. First, this paper defines the concept of earthwork BIM. Second, it discusses the key aspects of earthwork BIM, including 1) geographical information, 2) equipment configuration, and 3) equipment position. In the future, the 3D BIM environment will be tested at an actual construction site to determine its applicability, and it will be extended to include construction equipment such as bull dozers and pay loaders.

  • PDF

Information Modeling of Railway Track using Information Iinkage of Railway Alignment and Alignment-based Objects (철도 선형중심의 객체 정보연계를 통한 철도 궤도부 정보모델 생성 방안)

  • Kwon, Tae Ho;Park, Sang I.;Shin, Min Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.507-514
    • /
    • 2017
  • As BIM has been widely used in the field of architecture, efforts to apply BIM to civil engineering structures are increasing rapidly. Since commercial BIM softwares are focused on building structure, it is difficult to apply to alignment-based civil infrastructures. In this study, we proposed a method to generate an information model that reflects cant by sharing information between alignment-centered modeling tools and BIM authoring tools to manage information of railway track. The railway track modeling process consists of classifying structures into continuous and non-continuous structures, creating continuous structures by alignment-centered modeling tools, and using the shared alignment information to generate information model of the non-continuous structures. Non-continuous structures were generated by an algorithm that calculates the position and rotation information of each structure based on discretized railway alignment and cant information transmitted to the BIM authoring tools. The availabilities of proposed method were studied by applying to the osong test-line. Using the test model, it was shown that the objects were identified, the properties were extracted, and the quantities of each structure were calculated.

A Study on the Development of a Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.127-135
    • /
    • 2010
  • As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.