BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices

BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-

  • Received : 2010.10.05
  • Accepted : 2011.01.21
  • Published : 2011.03.31

Abstract

High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

최근 도심지 고밀화에 따른 공간의 효율적 이용이 요구됨에 따라 대규모의 고층 사무공간이 증가하고 있으며, 이와 함께 주거, 상업, 문화 등 다양한 기능을 밀접하게 연관시킨 고층 복합시설도 점차 늘어가고 있다. 이러한 대형 건설, 프로젝트는 긴 공사기간이 소요되어 공사비 예측이 쉽지 않으며, 막대한 비용이 투입되기 때문에 비용 예측의 중요성이 더욱 증대되고 있다. 이러한 상황에서 최근 극심한 경제변화에 따른 건설자재가격의 변동은 자재비를 포함한 공사비 예측을 어렵게 만드는 주요 원인이다. 따라서 본 연구는 건설자재단가 시계열자료를 활용, 미래의 자재단가 예측을 위한 시계열모델을 구축하고 복잡한 모델 프로세스를 간소화하는 자재별 최적 예측모델 도출시스템을 구축한다. 또한 Building Information Modeling(BIM)의 접근을 통해 자재의 투입시기 및 투입물량을 분석, 시계열모델을 통해 예측한 자재단가 예측 값과 조합함으로써 총 자재비를 포함하는 BIM기반 공사원가 예측 시계열모델을 제시한다. 본 연구는 시계열모델의 하나인 Autoregressive Integrated Moving Average(ARIMA)모델에 대한 예측력 비교를 통해 자재단가 예측을 위한 적합모델을 도출하였다. BIM기반의 원가예측 시계열모델은 자재의 투입시기별 자재단가 변동치를 예측함으로써 급변하는 경제 환경 변화에 대처할 수 있는 도구가 될 것이다.

Keywords

References

  1. 대한건설협회 (2008). "완성공사원가통계 개황", 대한건설협회 보고서, pp1-16, (2010.12.21).
  2. 정동빈 (2009). SPSS-PASW 시계열 수요예측 1, 한나래아카데미. pp.11-186.
  3. 조담 (2006). 금융계량분석, 도서출판 청람. pp.193-253.
  4. 한국물가정보(KPI). "주요 건설자재 물가정보 서비스" (2010.12.21).
  5. Ashuri, B. and Lu, J. (2010). "Forecasting ENR Construction Cost Index: A Time Series Analysis Approach", Construction Research Congress 2010, ASCE, pp.1345-1355.
  6. Eastman, C. Teicholz, P., Sacks, R., and Liston, K. (2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, John Whiley & Sons Inc., USA, pp.25-64.
  7. Issa, R. A. (2000). "Application of Artificial Neural Networks to Predicting Construction Material Prices", Proceedings of the Eighth International Conference on Computing in Civil and Building Engineering, ASCE, pp.1129-1132.
  8. Jrade, A. and Alkass, S. (2007). "Computer-Integrated for Estimating the Costs of Building Project", The Journal of Architectural Engineering, 13(4), pp.205-223. https://doi.org/10.1061/(ASCE)1076-0431(2007)13:4(205)
  9. Lu, T. and Abourizk, S. M.. (2009). "Automated Box-Jenkins Forecasting Modeling", Automation in Construction, 18(5), pp.547-558. https://doi.org/10.1016/j.autcon.2008.11.007
  10. Ng, S. T., Cheung, S. O., Skitmore, M., and Wong, T. C. (2004). "An Integrated Regression Analysis and Time Series Model for Construction Tender Price Index Forecasting", Construction Management and Economics, 22(5), pp.483-493. https://doi.org/10.1080/0144619042000202799
  11. Shaheen, A. A., Fayek, A. R., and Abourizk, S. M. (2007). "Fuzzy Numbers in Cost Range Estimating", The Journal of Construction Engineering and Management, 133(4), pp.325-334. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:4(325)
  12. Shane, J. S., Molenaar, K. R., Anderson, S., and Schexnayder, C. (2009). "Construction Project Cost Escalation Factors", Journal of Management in Engineering, 25(4), pp.221-229. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:4(221)
  13. Stoy, C., Pollalis, S., and Schalcher, H. (2008). "Drivers for Cost Estimating in Early Design: Case Study of Residential Construction", The Journal of Construction Engineering and Management, 134(1), pp.32-39. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(32)
  14. Trost, S. and Oberlender, G. (2003). "Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression", The Journal of Construction Engineering and Management, 29(2), pp.198-204.