• Title/Summary/Keyword: bidding

Search Result 487, Processing Time 0.029 seconds

A Study on the Effect of the Characteristics of Transaction Stage on the Satisfaction of Logistics Outsourcing (거래단계별 특성이 물류아웃소싱 만족도에 미치는 영향에 관한 연구)

  • Lee, Namseung;Song, Sang Hwa
    • Korea Trade Review
    • /
    • v.44 no.6
    • /
    • pp.69-85
    • /
    • 2019
  • Logistics outsourcing businesses consist of the three main stages of bidding, contracting, and operations. This study focuses on the impacts of factors in the logistics outsourcing stages on outsourcing performance. Key factors in each stage may have direct influences on logistics partnerships and performance. Also, factors of each stage may impact the factors of subsequent stages. The relationships were examined using a structural equation model and verified by PLS (partial least square)-SEM methodology. Study results were as follows. First, the uncertainty of the shipper in the bidding phase affects the flexible contract in the contracting phase, and thus, affects the satisfaction of the logistics outsourcing services. Second, the uncertainty of the shipper in the bidding phase affects operations through contracts, and positively affects logistics outsourcing satisfaction through trust and cooperation.

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

Construction of a Bidding System Using SyncML Data Synchronization Mechanism (SyncML 자료 동기화 방법을 이용한 이동무선통신 환경에서의 경매 시스템 구축)

  • Park, Kee-Hyun;Yoo, Sang-Jin
    • Information Systems Review
    • /
    • v.6 no.1
    • /
    • pp.155-166
    • /
    • 2004
  • As the necessity of such mobile wireless terminals as PDAs or Cellular phones drastically increases, the terminals play important role in various business areas. In this paper, a bidding system in mobile wireless environments is constructed. However, with many mobile wireless terminals modifying at the same time their (duplicated) bidding values for a given data item, data coherency for the data item becomes essential. Therefore, in this paper, a bidding system using SyncML data synchronization mechanism is proposed and constructed. SyncML is one of data synchronization mechanisms proposed by the SyncML Initiative, a consortium of mobile wireless mobile technology leaders for universal data synchronization. The bidding system is implemented and tested in LINUX, C++, and PocketPC 2000 emulator programming environments.

A Design and Implementation of Secure Electronic Bidding System (인터넷 기반 전자입찰시스템의 보안 설계 및 구현)

  • 윤선희
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.7
    • /
    • pp.861-870
    • /
    • 2002
  • The area of business applications in the internet are extended enormously in result of fast development of computing and communication technologies, increase of internet use, and use of intranet/extranet in enterprise information system. Widely spread the use of the internet, there are various applications for Business to Business (B to B) or Business to Customer(B to C) model that are based on the intranet or extranet. This paper designed and implemented the Web-based Electronic Bidding System for Business to Business (B to B) model. The technical issues of electronic bidding system in the internet are involved in the connection between web client and server, electronic data interchange for the contract document, and security solution during the bidding and contracting processes. The web-based electronic bidding system in this paper is implemented using Java applet and servlet as a connection interface for web client and sewer, XML/EDI-based documents for a bid and a contract, and bidding server and notary server for enhancing the security using PKI(Public Key Infrastructure)-based public key cryptography, digital signature and Certification Authority (CA).

  • PDF

A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects (건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델)

  • Kim, Jeongsoo;Moon, Hyounseok;Park, Sangmi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.851-863
    • /
    • 2023
  • The mandatory use of BIM(Building Information Model) in larger Korean public construction projects necessitates participants to have a comprehensive understanding of the relevant procedures and technologies, especially during the bidding stage. However, most small and medium-sized construction and engineering companies possess limited BIM proficiency and understanding. This hampers their ability to recognize bidding requirements and make informed decisions. To address this challenge, our study introduces a method to gauge the complexity of BIM requirements in bidding documents. This is achieved by integrating a morphological analyzer, which encompasses BIM bidding terminology, with a deep learning model. We investigated the effects of the parameters in our proposed deep learning model and examined its predictive validity. The results revealed an F1-score of 0.83 for the test data, indicating that the model's predictions align closely with the actual BIM performance challenges.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Improvement Sugestion For Pine-Mushroom (Trichroma matsutake) Bidding System (기술사마당: 제언 - 생송이버섯 공판제도에 대한 개선방향 제언)

  • Chun, Myung-Seog
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.5
    • /
    • pp.56-59
    • /
    • 2010
  • Pine-Mushroom(Trichroma matsutake) Bidding System was faced with a difficult question. Both producers and consumers are required to meet improvement. Classification system has been improved with the digital system. Standard uncertainty is likely to be clearly established.

  • PDF

Estimating Method of Starting Point Bias in Bidding Game (서베이를 이용한 입찰게임에서 출발점 편의의 추정)

  • 박용치
    • Survey Research
    • /
    • v.4 no.2
    • /
    • pp.63-86
    • /
    • 2003
  • The objective of this study was to investigate the existence of starting point bias in the bidding game contingent valuation elicitation technique when determining willingness to pay (WTP) for improving the qualify of running water in Seoul and its vicinity. Of all existing contingent techniques, the bidding game most closely mimics the normal price taking behavior in local markets. Three different starting points (low, medium and high) were used to determine WTP and the existence of starting point bias in the meanwhile respectively. The respondents were randomly assigned to the three different starting point groups in order to ensure homogeneity, so that any variation seen in WTP could be attributed to the starting point effects. And a pretested interviewer-administered questionnaire used to elicit WTP. Non-parametric test and the logit model were used to analyze the data for evidence of starting point bias. In this instance, the high starting point group had a high WTP, and low starting point group had a low WTP. This means there exist starting point bias in estimating WTP by bidding game in this instance. This finding might signal that people may actually be making up their minds on the maximum amount they are willing to pay for running water service as a bidding iterating is going on and is influenced by the starting point used in the bidding game. The problem of slaking point bias can be avoided if the respondent is asked directly for the maximum WTP without payment cards or a bidding game. But such a question is perceived as being very difficult to answer and this leads to problems of non-response and being unrealistic.

  • PDF

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Generator Maintenance Scheduling for Bidding Strategies in Competitive Electricity Market (경쟁 전력시장에서 발전기 유지보수계획을 고려한 입찰전략수립)

  • 고용준;신동준;김진오;이효상
    • Journal of Energy Engineering
    • /
    • v.11 no.1
    • /
    • pp.59-66
    • /
    • 2002
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilizing strategies of their own generation equipments. This paper presents on generator maintenance scheduling and efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.