• 제목/요약/키워드: a planning phase

검색결과 672건 처리시간 0.025초

장대 터널의 계획과 설계 (Construction Planning and Design of a Long Tunnel)

  • 장석부;윤영훈;김용일;김진한
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

기술논문 : 다목적 실용위성 1 호의 임무계획 및 자동 명령계획표 생성기 개발 (Technical Papers : Development of KOMPSAT-1 Scheduling & Automatic Command Plan Generator ( KSCG ))

  • 김해동;최해진;김은규
    • 한국항공우주학회지
    • /
    • 제30권1호
    • /
    • pp.139-146
    • /
    • 2002
  • 다목적 실용위성 1호의 초기운영과 정상임무운영을 위한 임무 및 명령계획 작업은 MAPS(Mission Analysis & Planning Subsystem)의 임무 및 명령계획 S/W를 이용하였다. 시간이 지날수록 요구되는 임무양이 증가하면서 수동작업이 많아 요구되는 기존 S/W를 이용하여 임무운영을 수행할 경우 안정성이 크게 저하되었으며, 자동 처리과정이 부족하여 결과검증에 소모되는 시간도 증가하였다. 다목적 실용위성 관제국은 이를 개선하고자 보다 신속하고 안전하게 임무 및 명령계획 작업을 수행할 수 있으며, 중요 과정들을 자동화하여 임무운영의 안정성을 높일 수 있는 새로운 임무 및 명령계획 S/W를 개발하였다. 본 논문은 다목적 실용위성 1호의 임무계획 및 자동 명령계획표 생성기(KSCG, KOMPSAT-1 Scheduling & Automatic Command Plan Generator)의 개발내용과 실제 운영결과를 기술하였다. KSCG를 사용한 결과, 작업능률 향상과 임무운영 안정성을 획기적으로 높였다.

Cochlodinium polykrikoides(Dinophyceae)에서 분비되는 유기물질의 특성 (Characteristics of Organic Substances Produced from Cochlodiniumpolykrikoides (Dinophyceae))

  • 강양순;권정노;안경호
    • ALGAE
    • /
    • 제21권2호
    • /
    • pp.253-259
    • /
    • 2006
  • Organic substances are released from phytoplankton cells during all phases of growth. The type and amounts of organic substance excreted and the effects of nutrient limitation are often highly species-specific. Dinoflagellate, Cochlodinium polykrikoides grown in batch culture produced an exopolysaccharide. Exopolysaccharide and intracellular polysaccharide concentrations increased as C. polykrikoides cultures progressed from exponential phase, through stationary phase, to declining phase. In the exponential phase, the concentration of exopolysaccharide was relatively low, but in the stationary phase, it showed a rapid increase which seemed to coincide with the depletion of nitrate from the medium. Of the 20 amino acids analyzed, proline dominated in the organic matter of all cultures ranging from 48.2 to 79.9 nmol L–1, and constituting the 20-90% of total amino acids, and followed by histamine varying from 0.7 to 47.5 nmol L–1. Leucine and cysteine were also abundant in the stationary phase. The release rates of exopolysaccharide and intracellualr polysaccharide were higher the end of stationary phase than in the exponential phase. Exopolysaccharide concentration per cell was more than two times higher during the end of stationary phase than that in exponential phase. C. polykrikoides produced extracellular polysaccharide at a rate of 47.04 pg cell–1 day–1.

ICT 기술혁신체계 프로세스 개선방안 연구 : 과제구분 및 선정평가를 중심으로 (A Study on the Process Improvement of ICT Technological Innovation System : with the Focus on Classification and Assessment of R&D Projects)

  • 임명환;고순주;이중만
    • 경영과학
    • /
    • 제33권3호
    • /
    • pp.53-64
    • /
    • 2016
  • The government is mapping out R&D innovation measures aimed at improving the qualitative level of the performance of national R&D projects that are supported by grants or public funds. This paper proposes ways of making improvements in technology planning, project assessment, performance management, and results evaluation in order to boost the efficiency of the country's promotion of ICT R&D projects, as well as to upgrade the processes involved with its technological innovation system at each of the commercialization stages of its R&D projects. According to our experts' in-depth survey and interview, it has been found that technology planning is the most important phase in the full cycle-based technological innovation system and that the promotion of a combination of top-down and bottom-up approaches is the most reasonable. This paper also suggests it is necessary to secure a process for exploring technological opportunities as the preparatory phase for technology planning, and that it is desirable to reflect the technology demand map associated with the technology road map. Currently, R&D projects are divided into policy designation, designation contest, and free contest. To minimize the inefficiency associated with indiscriminate competition, this paper proposes the introduction of a general contest system in order to change the project assessment system into one based on the results of the competition in each category(e.g. firms, universities, research institutions, etc.).

도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안 (A methodology for an effective utilization of construction equipment for highway construction projects)

  • 송호정;최재현
    • 한국건설관리학회논문집
    • /
    • 제15권6호
    • /
    • pp.26-34
    • /
    • 2014
  • 도로공사는 선형적이고 반복적인 공사로 공사의 특성상 건설장비에 대한 의존도가 높기 때문에, 건설장비의 효율적 운용에 의한 생산성 향상 및 공사비 절감 효과가 크다. 또한, 도로공사는 시공순서, 현장상황, 적용 공법에 따라 다양한 건설 장비의 선택이 가능하기 때문에 공정계획 시, 공종 간 연계에 따른 세부 작업 및 공법을 고려하여야 한다. 시공자는 현장조건에 맞는 작업을 선택하고 투입될 장비의 종류 및 성능, 수량 등을 사전에 파악하여, 적절한 건설장비 운용계획의 수립을 통한 경제성 향상 방안을 마련해야 한다. 하지만 한정된 유사 공사의 실적정보 및 체계적인 공사계획 방법의 부재로, 적정한 공정계획 수립이 용이하지 않으며, 공법 및 건설장비의 선정에 있어 대부분 경험과 직관에 의존한 공사를 수행하고 있다. 그 결과 시공 이전 공정계획단계에서 수립된 계획은 실행단계에서의 충분한 타당성을 확보하지 못하여 그 활용도가 제한적이다. 본 연구는 일반적인 도로공사의 초기 공정계획 수립단계에서 적용가능한 주요 공종별 공정로직을 개발하고, 공종 별 세부 시공절차 분석을 통하여 현장상황 및 공종에 적용 가능한 건설장비 운용 방안을 제시하였다. 또한 공정로직에 따른 다양한 건설장비 대안들을 대상으로 프로세스 시뮬레이션을 활용하여 경제성 기반의 최적화 장비조합 방안을 개발하였다. 개발된 방법을 이용하여, 계획단계에서의 수립된 다양한 공정계획에 대해 효율성을 평가하고 최적의 자원 선정을 위한 의사결정에 도움을 줄 것으로 판단된다.

자동차부품기업의 UML기반 자재관리시스템 설계 및 구현 (Design and Implementation of UML-Based Material Management System for Automotive Part Company)

  • 박정혁;서기철;문태수
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제12권2호
    • /
    • pp.129-149
    • /
    • 2003
  • One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.

  • PDF

국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로 (A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases)

  • 황정오;오현승;최봉완;임동순
    • 산업경영시스템학회지
    • /
    • 제43권4호
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

아파트 주거의 배치계획에 있어 CFD에 의한 풍환경의 예측과 평가 (Prediction and Evaluation of the Wind Environment in Site Planning of Apartment Housing by CFD)

  • 손세형
    • KIEAE Journal
    • /
    • 제10권2호
    • /
    • pp.63-69
    • /
    • 2010
  • Diverse problems in wind environment has occurred through rapid urbanization and growth of high-rise building numbers, This study aims to propose the CFD (Computational Fluid Dynamics) simulation method and evaluation standard of wind environment in site planning of high rise apartment housing. The CFD simulation method proposed in this study is not existing detail simulation, but it is the method that a designer can correct and develop the design through immediate evaluation of design options in concept design phase. Therefore, the proposed CFD simulation method of wind environment in this study uses the BIM based CFD tool in which the 3D model in concept design phase can be used as for the CFD simulation. In this paper, the study examines existing evaluation standards of comfortableness level in wind environment for pedestrian near buildings, and selects new evaluation method which is possible to apply to the proposed CFD simulation method. In addition, it is to examine calculation time-spending and appropriate mesh division method for finding CFD result which is useful to find the best design options in aspect of wind environment in concept design phase. Furthermore, it proposes the wind environment evaluation method through BIM based CFD simulation.

병원건축의 BIM적용을 위한 공간프로그램유효성평가의 전제조건에 관한 연구 (A study on the Preconditions of Space Program Validation of Healthcare Architecture for Application of BIM Technology)

  • 성준호;김길채
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제19권2호
    • /
    • pp.19-30
    • /
    • 2013
  • Purpose: The planning and design of hospital generally requires the participation and consultation of skilled experts since it has more complex space program than any other buildings. Therefore, the BIM systems for the planning of hospital have been tried continuously. The purpose of this study is to identify the precondition for space Program validation of healthcare architecture based on BIM, which is recently receiving wide attention. Method: For this study, United States, Australia and Finland's guidelines were analyzed among the description space program validation system in 14 overseas BIM Guidelines. And the propose precondition that can be applied to healthcare architecture from among these description of space program validation items, target, process etc for General building. Result: 1) spatial program validation is the following four evaluation phase. Step 1: Standard setting phase Step 2: BIM model accuracy assessment phase Step 3: space validation phase Step 4: Performance evaluation phase 2) The standards for the building elements at Standards Setting stage is considered to the standards for the architectural elements of General building. 3) Healthcare Architecture Area calculation method is considered to be reasonable that borrowing the area calculation standard of general architecture according to the UIA of international standards. However, Be proposed of measuring method that reflect the efficiency of the design process step-by-step area calculation method. The performance assessment indicators of reflect the Hospital uniqueness have to developed. And the research needs to be carried out continuously according to the purpose for healthcare architecture of feature-oriented. Implications: In this paper like to understanding that precondition of space program validation considering the BIM. As a result, understanding to condition about step of the evaluation, the evaluation standards. Is expected to keep the focus on the development of performance indicators that reflect the uniqueness of the hospital for the efficient evaluation of the Hospital building.

다목적강당의 계획과 활용에 관한 연구 - 가변성 적용을 중심으로 - (A Study on Design and Practical Use of Multi-purpose Auditorium with Priority given to Variable Application in Educational Facility)

  • 지현정;이정란;이상홍
    • 교육시설
    • /
    • 제12권6호
    • /
    • pp.5-17
    • /
    • 2005
  • The purpose of the study is to propose architectural design standards of the Multi-purpose Auditorium planning in educational facilities. The success of the design is measured by how well variable elements are applied to parts of Multi-purpose Auditorium and designed and equipped so that all groups-amateurs, professionals, youth, and adult alike-may use it effectively. The use of this facility will extend over a wide range, including concerts, plays, motion pictures, forums, and other forms of presentation. The wall, stage, roof, windows, and furnitures are important parts of Multi-purpose Auditorium and variable elements can applied to these parts. To successfully application of variable elements, it is necessary that these elements are considered in planning phase including time schedule planning. Various elements are permit a more informal and flexible arrangement and extensive learning activity.