A methodology for an effective utilization of construction equipment for highway construction projects  

Song, Hojeong (School of Architectural Engineering, Korea University of Technology and Education)
Choi, Jaehyun (School of Architectural Engineering, Korea University of Technology and Education)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.6, 2014 , pp. 26-34 More about this Journal
Abstract
Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.
Keywords
Highway Construction; Planning and Scheduling Equipment Combinations; Process Simulation;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Kim, K. J., Kim, J. R., and Chin, K. H. (2001). "Integration of Cost and Schedule Control in Public Road Construction Projects". The Journal of Korean Society of Civil Engineers, 21(5), pp. 703-712.
2 Choi, J. H., Lee, D. H., Kim., S. H. and Kim, S. K. (2010). "Factors Affecting Selection & Combination of Earthwork Equipment". The Korean Institute of Building Construction, 10(1), pp. 201-205.
3 Goldenberg. M and Aviad Shapira, M. (2007). "Systematic Evaluation of Construction Equipment Alternatives: Case Study". Korean Journal of Construction Engineering & Management, 133(1), pp. 72-85.   DOI
4 Hassan, M. M and Gruber, S (2008). "Simulation of Concrete Paving Operations on Interstate-74". Korean Journal of Construction Engineering & Management, 134(1), pp. 2-9.   DOI   ScienceOn
5 Hwang, J. H., Hwang, H. W. and Kim, B. S. (2009). "Conceptual Design of Optimization Model for Earthwork Equipment Combination Using Multiobjective Optimization Method". Proceedings of KICEM annual conference. KICEM, 9.
6 Kang, K. H., Kim, S. H., and Kim, J. J. (2010). "Heavy Equipment Management Plan for BIM-Based Construction Project". The Journal of Korea Institute of Building Construction, The Korean Institute of Building Construction, 10(1).
7 Lee, K. S. and Park, H. S. (2011). "Implementation of Time Management; Based on Road Construction Projects". The Journal of Korean Society of Civil Engineers, 31(3), pp. 451-456.   과학기술학회마을
8 Markiz, N., Jarade, A. (2012). "A Decision-Support Model Utilizing a Linear cost Optimization Approach for Heavy Equipment Selection". Journal of Construction Engineering and Management, ASCE. pp. 100-109.
9 Moselhi, O. (2009). "Optimization of Earthmoving Operartions in Heavy Civil Engineering Projects". Journal of Construction Engineering and Management, ASCE. pp. 948-954.
10 Ohn, S. W., Woo, S. K. and Kim, O. K. (2007). "An Application of Simulation Method to Planning of Road Pavement Operation". Korean Journal of Construction Engineering and Management, KICEM, 8(1), pp. 124-131.   과학기술학회마을
11 Yun, S. H. and Kim, S. S. (2005). "Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information". Korean Journal of Construction Engineering and Management, KICEM, 6(6), pp. 107-114.   과학기술학회마을
12 Prasertrungruang, T and Hadikusumo, B.H.W. (2009). "Modeling the Dynamics of Heavy Equipment Management Practices and Downtime in Large Highway Contractors". Korean Journal of Construction Engineering & Management, 135(10), pp. 939-947.   DOI   ScienceOn
13 Son, H. J., Kim, C. W., Cho, S. Y. and Kim, Y. S. (2007). "Optimization of Heavy Equipment Operations on a Construction site Using Simulation". The Journal of Korean Society of Civil Engineers, 27(5), pp. 579-588.   과학기술학회마을
14 Won, S. K., Kim, S. K. and Han, C. H. (2007). "A Combination Model of Earthwork equipment using System Dynamics". Korean Journal of Construction Engineering and Management, KICEM, 8(2), pp. 194-202.
15 Lee, S. W., Kim, O. K. and Woo, S. K. (2007). "Study on Development for Plan Model of Tunnel construction by using Arena-on focused NATM". Proceedings of KICEM annual conference. KICEM, 7, pp. 872-875.