• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,890, Processing Time 0.04 seconds

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method (CYCLONE 모델링 기법 개선을 통한 초고층 공사의 자재 양중 작업 프로세스 최적화 연구)

  • Hawng, Doowon;Kwon, Okyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.58-70
    • /
    • 2017
  • The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.

Analysis of risk factors for safety accidents for fisher onboard aquaculture fisheries management vessel (양식어업 어장관리선에 승선하는 어선원의 안전사고 위험요인 분석)

  • Seung-Hyun LEE;Su-Hyung KIM;Kyung-Jin RYU;Yoo-Won LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.60 no.2
    • /
    • pp.170-178
    • /
    • 2024
  • This study aimed to quantitatively analyze the risk using data from 329 safety accidents that occurred in aquaculture fisheries management vessels over the recent five years (2018-2022). For quantitative risk analysis, the Bayesian network proposed by the International Maritime Organization (IMO) was used to analyze the risk level according to the fishing process and cause of safety accidents. Among the work processes, the fishing process was analyzed to have the highest risk, being 12.5 times that of the navigation, 2.7 times that of the maintenance, and 8.8 times that of the loading and unloading. Among the causes of accidents, the hull and working environment showed the highest risk, being 1.7 times that of fishing gear and equipment, 4.7 times that of machinery and equipment, and 9.4 times that of external environment. By quantitatively analyzing the safety accident risks for 64 combinations of these four work processes and four accident causes, this study provided fundamental data to reduce safety accidents occurring in aquaculture fisheries management vessels.

A Study on Analysis and Design Method for Resource Management Information System in Container Terminal (컨테이너 터미널의 자원관리를 위한 정보시스템의 분석 및 설계에 관한 연구)

  • 김헌종;송재성;서만승
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2000.11a
    • /
    • pp.12-15
    • /
    • 2000
  • An SADT-based methodology is presented for systematically analyzing the container working process in container terminal, as well as an object-oriented design method for an integrated information system for container terminal resource planning and management. Our design architecture is composed of four levels, activity interface, activity PDCA control, human resource management, and facility resource management. Especially, the consideration of the human resource management level makes it possible to support cooperative tasks, to make the authority and responsibility on a task clear, and to extremely promote the balance between human and facility resources. Finally, The system architecture is suggested for Virtual Container Terminal, in which a planned container working process is simulated for previous feasibility check, work orders are transferred to control real devices, and to manage the entire process and related data.

  • PDF

A Study on Improving the Production and Shipment Using MES System (MES 시스템을 이용한 생산 및 출하 신뢰성 향상에 관한 연구)

  • Cho, Joong-Hyun;Bae, Byeong-Gon;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.04a
    • /
    • pp.73-80
    • /
    • 2007
  • Recently, the strategy of the age of limitless competition for existence of manufacturing company appears for the enhancement of productivity through the automatic system, the reduction for the cost for standardization and the decision making process for the information system. Especially the critical success factors in manufacturing company can be summarized for the establishment of production visibility through the production management, material & work-in-process management, the establish of the flexible manufacturing system for the changed order priority and the establish of the quality system for improvement of product and process quality. The existing production management systems supply only simple information about production results on real time, can delay quick decision making. And it can prevent acquiring the information about various customer needs and the communication problems with other systems. In this paper, it will show MES system, a solution for the problems of existing production management systems. And through a case study of D company, it will reveal improvement effect on shipment error using MES system and economic analysis for MES itself.

  • PDF

Automation and Common Utilization Plans of Job and Organization Analysis of Producing Institutions (생산기관 직제분석 자동화 및 공통 활용 방안)

  • Kang, Yoona;Park, Tae-yeon;Kim, Hyunjin;Oh, Hyo-Jung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.21 no.4
    • /
    • pp.81-99
    • /
    • 2021
  • Job and organization analysis of producing institutes is a task that identifies the history of transition and major business functions for various record-producing institutions and must be performed in common within the archives, and many workers must jointly refer to the relevant knowledge. However, in the field, a limited number of people in charge are individually performing by manual work, and the results are not shared. Therefore, this study aims to reduce the work burden of workers through the automation of the job and organization analysis process and build basic resources that can be commonly used by the archives. This study subdivided the task of job and organization analysis into manual, semi-automation, and automation parts by performing FGI with the practitioner of the archive and suggested ways to realize it. In addition, we derive the basic analysis data that can be commonly referenced in the electronic records management process, and by verifying the results through practitioners, efficient use of knowledge resources is suggested. Furthermore, by establishing a standardized work process, we intend to lay the foundation to support consistent and systematic work performance.

Treemapping Work-Sharing Relationships among Business Process Performers (트리맵을 이용한 비즈니스 프로세스 수행자간 업무공유 관계 시각화)

  • Ahn, Hyun;Kim, Kwanghoon Pio
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.69-77
    • /
    • 2016
  • Recently, the importance of visual analytics has been recognized in the field of business intelligence. From the view of business intelligence, visual analytics aims for acquiring valuable insights for decision making by interactively visualizing a variety of business information. In this paper, we propose a treemap-based method for visualizing work-sharing relationships among business process performers. A work-sharing relationship is established between two performers who jointly participate in a specific activity of a business process and is an important factor for understanding organizational structures and behaviors in a process-centric organization. To this end, we design and implement a treemap-based visualization tool for representing work-sharing relationships as well as basic hierarchical information in business processes. Finally, we evaluate usefulness of the proposed visualization tool through an operational example using XPDL (XML Process Definition Language) process models.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Efficient process management system based on smart app (스마트 앱에 기반한 효율적인 공정관리 시스템)

  • Han, Kwang-Woo;Jung, Su-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.724-727
    • /
    • 2015
  • Over time, advanced technology became more complicated and the requirement of work have been more harder. So there is a need for systematic management system. Modern process has most of the management system. However, in a typical process, there is still no management system. We are only managed in the process according to the memoirs and oral by -step cycle also experience. As a result, the business is stagnant, efficiency in terms of quality will be even lower. Thus, in this paper, not only the modern process, even in a general process, it is desired to develop a process management system that can provide a more efficient working environment.

  • PDF

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF