Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method  

Hawng, Doowon (Department of Architecture, Soongsil University)
Kwon, Okyung (Department of Architecture, Soongsil University)
Choi, Yoonki (Department of Architecture, Soongsil University)
Publication Information
Korean Journal of Construction Engineering and Management / v.18, no.2, 2017 , pp. 58-70 More about this Journal
Abstract
The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.
Keywords
Improvement of CYCLONE Modeling; Work Process; Construction Lift; High-rise Building;
Citations & Related Records
Times Cited By KSCI : 10  (Citation Analysis)
연도 인용수 순위
1 Bae, J., Soh, J., Lee, J. and Han, C. (2013). "Analysis of Operating Performance of Construction Lift Using Monitoring Sensor" Proceedings of the 2013 KICEM Conference .
2 Chang, D. (1986). "RESQUE : A resource based simulation system for construction process planning" Ph.D. Dissertation, University of Michigan.
3 Cho, C., Shin, T., Won, S., Kim, J. and Cho, M. (2011). "An Algorithm for Hoisting Time Calculation in Super-tall Building Construction" Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 120-129.   DOI
4 Halpin, D. (1977). "CYCLONE : method for modeling job site process" ASCE Journal of the Construction Division, 103(3), pp. 489-499.
5 Han, C., Lee, J. and Won, S. (2012). "A Computation model for Resource-based Lifting loads of the liftcars for super high-rise buildings" Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 135-143.   DOI
6 Kim, S., and Han, K. (2008). "A Study on the Estimation of Proper Numbers of Construction Lifts" Journal of the Korea Institute of Building Construction, 8(3), pp. 119-125.   DOI
7 Lee, M., Won, M., Lee, U., Cho, H. and Kang, K. (2014). "Integrated Lifting Model of Planning and Operation for Finishing Workers in Tall Building Construction" Journal of the Architectural Institute of Korea, Structure and Construction Section, 30(5), pp. 125-133.   DOI
8 Liu, L. (1991). "COOPS: Construction object-oriented process simulation system" Ph.D. Dissertation, University of Michigan.
9 Martinez, J. (1996). "Stroboscope: State and resource based simulation of construction processes" Ph.D. Dissertation, University of Michigan.
10 Moon, J., Park, M., Lee, H. and Jung, M. (2014). "Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super Highrise Buildings" Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 53-62.   DOI
11 Soh, J., Bae, J., Han, C. and Lee, J. (2015). "A Study on Optimal Inspection Interval for the Major Components of Construction Lift" Korean Journal of Construction Engineering and Management, KICEM, 16(3), pp. 68-77.   DOI
12 Park, M., Ha, S., Lee, H. and Kim, S. (2011). "An Optimization Model of Temporary Lift's Vertical Zoning for Worker Lifting Operation in the High-rise Building Construction" Journal of the Architectural Institute of Korea, Structure and Construction Section, 27(11), pp. 193-202.
13 Shin, J. and Kwon, S. (2013). "Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building" Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 153-163.   DOI
14 Shin, Y. (2011). "Construction Lift Planning System in Tall Building Construction" Journal of the Architectural Institute of Korea, Structure and Construction Section, 27(11), pp. 227-235
15 Shin, Y. and Kang, K. (2010). "Construction Lift Planning Model Using Discrete-Event Simulation in Tall Building Construction" Journal of the Architectural Institute of Korea, Structure and Construction Section, 26(9), pp. 119-127.