Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

A Study of the Characteristics of Lee Kyo-Won's Landscape Design (이교원 조경의 특성에 관한 연구)

  • Seo, Young-Ai;Choi, Jung-Min;Zoh, Kyung-Jin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.2 s.121
    • /
    • pp.13-24
    • /
    • 2007
  • This study aims to investigate the characteristics of Lee Kyo-Won's landscape architecture and add to the literature in this field. Also, the current status of and issues in landscape design will be dealt with through the lens of the individual landscape architect's worts. By adopting a critical analysis, this study will look closely into the background of his career and ideas regarding landscape design. The inherent nature of his coherent style in landscape design will be listed as follows: total design, design-build systems, experimentation with new kinds of plants and materials, and the pursuit of minimalism. His design domain covers various elements such as paving, street lamps, and clock towers, among others. He was often involved in managing outdoor sculpture and he also provided the total packaging of the design-build systems for most of his landscape projects. These are the main reasons why his landscape works can maintain their high end quality; through his craftsmanship, a fine quality of detail was achieved in his landscape design. This tell us the possible options that can be adopted such as landscape architectural design management or landscape architectural turn-key systems, which differ from the prevailing dual system between design and construction. However, his own particular system can not be replicated in ordinary situations because contemporary practices require us to coordinate the various stakeholders concerned in the decision-making process of the design. In general, it is fair to say that we can give him the credit for enhancing the status of landscape design as an independent, specialized field.

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.