• Title/Summary/Keyword: Track

Search Result 6,086, Processing Time 0.029 seconds

Separation Mode Analysis of Track Assembly of Main Battle Tank (궤도형 전투차량의 궤도박리 발생 및 성장모드 예측에 관한 연구)

  • Lee, Kyoung-Ho;Park, Byoung-Hoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.173-180
    • /
    • 2007
  • In this paper, we have proposed a simple finite element model for separation mode analysis on the roadwheel and track assembly of main battle tank and established a contact stress-based mechanism which could explain the initiation and growth of separation defect occurred during the test of padreplacable track. It was proved that the longitudinal contact shear stress component on the pin hole region of the track shoe body which is parallel to the driving direction is consistent with the crack initiation at the bonding surface between track shoe and wheel-side rubber. The longitudinal shear stress increased locally near the separated region after the separation initiated. So we could assume that the local stress concentration accelerates the separation growth according to the shear mode.

Technical Trend of Track Irregularities Measuring Systems and Its Application (궤도 검측 시스템의 현황과 응용)

  • Kim, Sang-Soo;Kim, Young-Mo;Han, Young-Jea;Park, Choon-Su
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.139-142
    • /
    • 2005
  • High speed railway, KTX has started commercial service last you and passengers is increasing. To secure the safety and reliability of high speed railway, it is necessary to inspect and maintain the rail regularities. Several methods of measuring track irregularities are developed in other railway advanced countries. In this paper, we introduce foreign track Inspection methods and application scheme to Koreans.

  • PDF

Analysis of the Coupled Vibration for Traveling Wheel (주행 중 차륜의 연성 진동 해석)

  • 류윤선
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.352-357
    • /
    • 1997
  • The coupled vibration of a wheel-railway track system has been considered as that of a moving mass on a beam. In this paper, an analytical model is proposed to analyze the coupled vibration when a wheel travels on a railway track. The railway track supported by sleepers is considered as a beam on Winkler's foundations, and the wheel traveling on railway track at constant speed is considered as a moving mass. Hertz's contact stiffness is assumed between the wheel and railway track. Numerical results are compared with experimental ones to verify the validity of the numerical method. The numerical method in found to be efficient to analyze this system. Based on the numerical simulation, the appropriate analysis range of the beam model and the characteristics of coupled vibration are discussed.

  • PDF

A Study on the Criteria of Settlement in Concrete Slabtrack (토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Yun-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.

Investigation of Recent Maintenance and Management in Existing Railway Bridges for Development of Urban Maglev Track Structures Inspection Manual (도시형 자기부상철도 토목구조물 유지관리 지침 작성을 위한 국내 철도교 유지관리 현황 분석)

  • Lee, Gi-Yeol;Yang, Tae-Sock;Chung, Won-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.107-111
    • /
    • 2008
  • This paper presented a literature review and investigation analysis results of total 19 present guide book and provisions of maintenance and management system in existing railway bridges to development of urban maglev track structures inspection manual. This research carried out a cooperated research subject 3-1, development a design code and maintenance and management inspection manual for urban maglev track structures, of the Center for Urban Maglev Program. Three types of track structures were includes as a major analytical parameter together with railroad, high speed railroad, subway and light rail transit. Bridges were analyzed a general rules, investigation, evaluation, repair and strengthen method as a key aspect. And rail were analyzed examination and maintenance also. This analysis results show that the track structures evaluation are based on the test and examination results, and repaired or strengthened consideration of deterioration, track irregularity and materials according to provision requirements.

  • PDF

Effect of Settlement Restoration Grouting between concrete track/Roadbed on the train service stability (콘크리트궤도 침하복원을 위한 궤도/노반 인터페이스부 그라우팅이 주행안정성에 미치는 영향)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Tae-Guen;Kang, Tae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.796-804
    • /
    • 2008
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a digitalized grouting method as a settlement restoration method that can be suitably adopted to the concrete slab track. And we also evaluated the train service stability through the analysis of the track behavior according to the difference of the stiffness between the grouted part and the original roadbed.

  • PDF

A Study on noise measurement result of track noise absorber (도상흡음재의 도상시험에 관한 고찰)

  • Kim, Jin-Ho;Han, Suk-Yoon;Jung, Jang-Yong;Mun, Je-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1038-1042
    • /
    • 2008
  • The construction of concrete slab track system is increased recently but the noise level on slab track is 3dB(A) higher than the one on ballast track since most of noise is reflected on slab track. Currently, concrete slab track systems has been designed for Gyungbu high speed line stage 2 and Honam high speed line. For those tracks, noise absorbing blocks are considered. In this paper, noise absorbing blocks were installed at Hwang Hak tunnel for evaluation of noise absorbing blocks and the indoor noise of KTX was measured. The results have done comparative analysis.

  • PDF

Development of an Inspection Robot Operating on a Single Square Rail Track (단일 사각 레일 주행이 가능한 감시 로봇 설계)

  • Ryu, Wooseok;Lee, Sungon
    • The Journal of Korea Robotics Society
    • /
    • v.17 no.2
    • /
    • pp.216-220
    • /
    • 2022
  • This paper proposes an inspection robot that can operate on a single square rail. Various inspection robots have been developed to identify emergency situations in industrial environments, such as those involving fires or individuals with cardiac arrest. Because the robots must operate in wide areas and long tunnels, they are designed to move along a rail installed on the ceiling. Double rail track are typically used to ensure the stability of robot movement. However, the cost for installing a double rail track is nearly two times that for a single rail track. Moreover, it is challenging to install double rail tracks while ensuring the same curvature and interval between the two rails. Therefore, in this study, an inspection robot that operate on a single square rail track is developed. To ensure stable movement in the longitudinal and lateral directions, two passive guide parts are used, and the main active wheel is allowed to move on the upper side of the square rail. The prototype was manufactured, and experiments were performed for different robot velocities.

Track-Structure Interaction Analysis of Fast Hardening Track on Railway Bridge Considering Effect of Anchor and Friction (앵커와 마찰의 영향을 고려한 교량상 급속경화궤도의 궤도-교량 상호작용해석)

  • Cho, Sang-Hyeon;Lee, Il-Wha;Chung, Won-Seok;Lee, Hee-Young;Lee, Kyoung-Chan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.1
    • /
    • pp.53-61
    • /
    • 2018
  • Ballast track requires constant maintenance work due to progress of track irregularity. Fast Hardening Track(FHT) has been developed to reduce the maintenance effort done by injecting fast hardening mortar in aged ballast to convert slab track. For the application of FHT to a railway bridge, post-installed anchors should be placed at center of the track segment to fix it on bridge. This paper presents track-bridge interaction analysis results with FHT considering stiffness and strength of post-installed anchor, age of FHT concrete and friction between FHT and bridge deck surface. Based on the analysis results, this study suggests when is good to install the anchors and allow normal operation of passing train.