• Title/Summary/Keyword: Technical Management Process

Search Result 758, Processing Time 0.035 seconds

An Analysis of the Importance of the Success Factors in Implementation Stage of ERP System

  • YI, Seon-Gyu;Kim, Jong-Ju
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.12
    • /
    • pp.165-171
    • /
    • 2016
  • This study analyzes the relative importance of the introducing factors for the critical success factors in the implementation stage of the lifecycle of ERP system using Delphi technique and Analytic Hierarchy Process(AHP). In the 1st layer of the hierarchy, technical factor is evaluated as the most important factor among organizational, technical, and supplier factors. In the 2nd layer, choosing a proper ERP package is evaluated as the most important factor within 15 factors followed by process-oriented approach, technical suitability, minimized customization, integration and association of system with trading parter, association with legacy systems, and support and involvement of top management. As a result of this analysis enterprise should choose an ERP package that is suitable to its business environment, and make the best use of(take full advantage of) best practice that ERP package provides to optimize the existing business procedure or process(to approach the existing business procedure or process). This study also shows the range of customization of the features provided by the ERP package should be minimized.

An Evaluation of Process Capability Using Degree of Conformance (적합성 정도를 이용한 공정능력의 평가)

  • Park, Sang-Gyu;Chung, Kyu-Ryun
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.1
    • /
    • pp.50-60
    • /
    • 1996
  • Though the quality characteristics within a specified tolerance are equally desired quality there is a difference in conformance between a specification limit and a target value. In this paper we propose a measure of process capability that takes into account the degree of conformance to a target value as well as the process variation.

  • PDF

How to develop corporate real estate? A decision support tool for CREM

  • Dorr, Anne;Pfnur, Andreas
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • Various forms of procurement are open to companies when constructing new owner-occupied properties. The selection of a form of procurement is an important decision-making problem for companies and their Corporate Real Estate Management (CREM) departments. With this in mind, a decision support tool has been developed to optimise the outcome and success of company's proposed real estate development projects and is presented in this paper. This model can also be used for current real estate portfolios to optimise returns in the long term. In pursuit of this objective and in order to provide an academic basis for this study, decision-relevant goals and parameters were initially identified from the referenced literature used in our research. These were subsequently evaluated in a case study of a corporate development project and identified as specific decision criteria from the perspective of the CREM. The investigation identified 15 criteria that are relevant to the corporate decision-making process in procuring and/or developing property. A model for supporting and resolving decision-making problems of this type was derived from decision theory. In this paper, a decision-making tool is presented that takes into account all the decision criteria from the CREM point of view for the first time. This model should therefore serve as an aid in implementing the decision-making process for the development of real estate projects in a more structured and transparent manner.

Improvement of Basic Design Process for Submarines by Integration of SE-Based Technical Review and Requirements Management Process (SE 기반 기술검토 및 요구사항 관리 프로세스의 통합을 통한 잠수함 기본설계 프로세스의 개선)

  • Shin, Sung-Chul;Park, Jin-Won;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.96-104
    • /
    • 2018
  • Military vessels are complex weapon systems consisting of various integrated onboard equipment. Since their acquisition of military equipment takes a long period of time and a prototype ship is deployed and tested, vessel development has relied on its proprietary process. However, due to the growing complexity of onboard equipment technology, application of systems engineering (SE) process has become indispensable. Nonetheless, an effective design process complementing the existing design with the SE has not yet been developed. As such, we have studied an improved basic design process for submarines based on SE. To do so, we analyzed the processes for the basic design, technical review, and requirement management. Included reviews and requirements are SRR, SFR and PDR, and SSRS, SSS, and SSDD. By combining the results in the SE framework, we built an improved basic design process that can be applied in parallel with the SE-based technical review and requirement management. To assess the process, we applied our proposed model to the submarine development undergoing the basic design phase. It is possible to effectively manage the requirements, design artifacts and improve traceability, and also utilize them as test and evaluation materials. The SE-based basic design process is expected to be useful in other kinds of vessel design.

A Study on the Implementation of PDM Integration Environment in Heterogeneous Distributed Environment (이기종 분산환경에서 PDM 통합환경 구현에 관한 연구)

  • 김형선
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.33-45
    • /
    • 1998
  • The typical characteristic of PDM(Product Data Management) System seperates the databases to store the meta data and applications. Therefore, meta data contains the information for the location of file, user profiles, relationships between the files, and process. PDM utilizes these information efficiently and does file management, configuration management, and process management. In this view, the integration strategy of PDM is to merge data and process. In the view of architecture, the interface between data and application and the actions of each application execute seamlessly. This architecture is viewed as integrated data and process among enterprises and implemented with client/server technology in distributed process environment that interfaced with open object-oriented technology which is developed with business object in the object-oriented infrastructure. In this paper, we studied the definition, function, and scope of PDM and researched the core technologies to implement the PDM integration environment. We also researched the PDM utilization in distributed enterprise environment and implementation of PDM integration environment with this technical background.

  • PDF

A Study on Factory Building Fire Risk Reduction Management (공장건물의 화재리스크 경감방안에 관한 연구)

  • Chung, Eui-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.43-53
    • /
    • 2008
  • This study is carried out for the fire safety of the factory building, the fire risk reduction measure in compliance with an example approached in fire risk reduction systematically, contribute to reduce the fire risk. The analytical fire risk process of discovering, identifying, estimating and evaluating risk and control measure as risk reduction measures are core concept, applies loss prevention with loss control techniques. The painting process in the workplace where the fire hazard and death accident accompanies coexists. Loss prevention problem of creation prevention of dangerous atmosphere at workplace is health and human services problem of normal circumstances, must be inspected with problem of combustible gases at the time of fire explosion. Static electricity measure accomplished the risk control process thoroughly as the fire risk reduction process model with the ignition sources measure which is presented. Fire risk from within organizing will be able to classify with each field by detailedly but risk treatment process will be able to apply basically all the same concept. Consequently about risk management example from before, this study is proposed risk management techniques that standardized rightly in the actual condition of organization with one plan, with discovery of fire risk, the feedback process in compliance with a fire risk reduction and the review which control the result is joint responsibility of engineer, technical expert and manager as part of safety management to practice with the fact must be supervised.

An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering (시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리)

  • Hong, Dae Geun;Byun, Hee Chul;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

Priorities Analysis of NCS Vocational Key Competence of Nurse using AHP Method (AHP기법을 활용한 간호사의 NCS직업기초능력 우선순위 분석)

  • Park, Ji Yun;Lee, Myung Sun
    • The Journal of Korean Society for School & Community Health Education
    • /
    • v.18 no.3
    • /
    • pp.83-95
    • /
    • 2017
  • Objectives: The purpose of the research is understand the priorities of national competency standards vocational key competence factors in nurse who is work in Seoul and Incheon. Methods: The design of this study is descriptive investigation research, and the subjects were 144 nurse. we establish the vocational key competency defined in national competency standards as analytic hierarchy analysis model. The vocational key competency has 10 categories and 34 sub-categories. And based on the survey in nurse, the weight representing relative importance of each factor were calculated by using analytic hierarchy process method. Results: The analytic hierarchy process analysis on 10 categories showed that professional ethics(0.149) was higher than any other categories while that of numeracy(0.040) was at the bottom. And the analysis on sub-categories revealed that the most important factors in each categories included the Ethical community(Professional ethics), Conflict management skills(Interpersonal skills), Problem solving capability(Problem-solving skills), Listening skills(Communication skills), Applicable technical skills(Technical skills), Ability to understand business(Ability to understand organizational structures), Information processing capabilities(Information capacity), Self-management skills(Self-development capability), Ability to manage time(Resource management capabilities), Basic math skills(Numeracy). Conclusions: The results in this study can be used as basic data for the development of liberal arts curriculum for Nursing.

  • PDF

A Study on a Method to Use Industrial and Technical Information in Process of R&D Project Planning (연구개발(R&D)과제 기획에서의 산업·기술정보 활용방안)

  • Kim, Yong;Han, Hee-Jung;Lee, Kyun-Hyung;Lee, Yoon-Seok;An, Seung-Kwon
    • Journal of Information Management
    • /
    • v.43 no.4
    • /
    • pp.69-96
    • /
    • 2012
  • Based on analysis of trend and development of industrial and technical information such as patents and scientific data, using industrial and technical information in the process of planning can be a important factor to reduce budget and opportunity cost. This study aims to investigate needs to collect and analyze industrial and technical information in planning of R&D project. To do it, this study examines definitions, needs and types of industrial and technical information for planning of R&D project. And then this study investigates the importance of use of industrial and technical information in the process of planning of R&D and performs case study in domestic and foreign countries. Lastly, this study investigates a method to analyze industrial and technical information for R&D planning and proposes the role of a library for R&D planning.

Systems Engineering Application of Imaginary WIG(Wing-In-Ground Effect) Ship Acquisition Project (가상 함정획득사업의 Systems Engineering 적용 (INCOSE SE Handbook ver. 3.1 중심으로))

  • Lee, Su Oek;Shin, Seung Chun;Choi, Nag Jun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.57-65
    • /
    • 2009
  • The purpose of Defense Acquisition Project is that the superior weapons validated needs and performance are supplied to military user with limited financial resources and time. The Warship Acquisition Project is not only like this, But also has special characteristics of long project period and first-constructed ship's operation employment. So, The Warship Acquisition Project need systematic and efficient procedure & management. And this paper researches System engineering application of imaginary WIG(Wing-In-Ground Effect) ship acquisition project based Systems Engineering Handbook ver.3.1 published by INCOSE, the lead of field. The Imaginary WIG(Wing-In-Ground Effect) ship acquisition project applied the four processes(technical project, Enterprise & Agreement, Enabling Systems), the basis of INCOSE Engineering Handbook ver.3.1, and the each process output compared with DAPA(Defense Acquisition Program Administration)'s warship acquisition procedure.

  • PDF