Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

두 경부 종양의 C-T 영상을 이용한 방사선 치료계획시 Artifact가 선량 계산에 미치는 영향

  • 김경태;주상규
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.13 no.1
    • /
    • pp.109-112
    • /
    • 2001
  • 1. 목적 : head and neck cancer 환자의, C-T 영상을 이용한 방사선치료계획시 치과 보철물에 의해 발생하는 artifact가 선량 계산에 미치는 영향을 분석하고자 한다. 2. 재료 및 방법:두 경부와 유사한 크기의 Polystyrenes Phantom ($20{\times}20{\times}25cm^3$) 을 제작하고, 팬톰내에 금으로 인공보철물을 제작하여 보철물 부착 전.후를 C-T Scan (High Speed Advantage, GE, US) 하였다. artifact에 의한 영향을 쉽게 분석하기위해 팬톰내에 다른 구조물은 만들지 않았으며 두가지 방법으로 얻어진 영상을 이용하여 조사면의 크기와 조사 방향을 변화 시켜 가며 1문 조사(SSD 100 cm)에 의한 치료 계획(3D RTP system, Prowess, US)을 수립하여 기준점(5,10 cm depth)에서의 선량 변화를 비교 분석하였다. 아울러 3회 반복 scan하여 artifact에 발생 유형과 CTNo을 이용한 density을 분석하였다. 3. 결과: C-T Scan으로 얻어진 image 상에 나타난 Artifact는 CT no $-1000{\sim}+2775$(기준 $-1000{\sim}+3700$)까지의 다양한 값을 가지며 보철물을 기준으로 방사형태로 분포하였다. artifact가 선량 계산에 미치는 영향을 분석한 결과 보철물 사용시 5cm깊이의 기준점에서 절대선량은 평균 $+1.5{\pm}2.8\%$, 10 cm 깊이에서는 $+1.8{\pm}3.5\%$의 오차를 보였다. 조사방향에 의한 오차는 artifact에 대해 측면 조사한(gantry $270^{\circ}$)경우에서 높게 관찰되었다. 4. 결론: 두 경부 종양의 방사선 치료시 치과 보철물에 의한 artifact는 흔히 관찰가능하며 본 실험을 통해 다양한 형태와 다양한 density을 가짐을 알수있었다. 영상에 나타난 정도에 비해 선량계산에 미치는 평균 오차는 낮게 평가되었지만 조사 방향과 보철물의 위치에 따라 변동이 크게 나타날 수 있어 치료 계획시 가능한 artifact의 영향을 적게 받는 빔의 선택이 정확한 선량 계산에 도움을 줄 것으로 사료된다.

  • PDF

Application of CBM-CFS3 Model to Assess Carbon Stock and Age Class Changes Over Long Term Forest Planning in a Korea's National Forest (산림탄소축적을 고려한 국유림 장기경영계획 수립을 위한 CBM-CFS3 모델의 적용)

  • Jang, Kwangmin;Won, Hyun-Kyu;Kim, Young-Hwan;Tak, Kwang-IL;Shin, Man Yong;Lee, Kyeonghak
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.591-597
    • /
    • 2011
  • Forest carbon stock changes in a national forest were assessed by CBM-CFS3 model with different management scenarios to support decision making for a long term forest planning. Management scenarios were composed with 4 different levels of timber harvesting - current harvesting level (scenario1), 30% increment in each period (scenario2), 3 times increment (scenario3), and 5 times increment (scenario4). For each scenarios, changes in total carbon stocks, carbon stocks of each carbon pools, carbon stocks of harvested wood products (HWP) and age class structure were estimated over 100-year planning horizon. The estimated total carbon stock including HWP at the end of final period (100 years) was 433.1 tC/ha under scenario 1, but the age class structure has skewed right to the upper classes, which is not desirable for sustainable forest management. Under the scenario 4, however, the total carbon stock decrease to 385.5 tC/ha and the area of old growth forest show a significant decline. The estimated total carbon stock under scenario 2 and 3 were 411.7 tC/ha and 410.5 tC/ha respectively, and it was able to maintain the initial level of the forest carbon stocks during the planning horizon. Also the age class structures under the scenario 2 and 3 were evenly distributed from class 1 to class 8. Overall, scenario 2 and 3 were the most acceptable forest management options, in terms of carbon stock changes and age class structure.

Difference in canopy and air temperature as an indicator of crop water stress and its feasibility for irrigation scheduling (작물 캐노피 온도와 대기온도간의 상관관계 분석 및 활용 연구)

  • Kim, Minyoung;Choi, Yonghun;Jeon, Jonggil;Kim, Youngjin
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2017.04a
    • /
    • pp.131-131
    • /
    • 2017
  • 작물의 체온인 엽온은 작물의 증발산량 또는 작물의 스트레스와 관련이 있으며, 일반적으로 일사, 풍속, 습도 등 기상조건과 잎의 크기, 형태 등 생리작용 등에 의해 지배된다. 엽온을 작물의 수분스트레스지수, 증발산량 등을 산정하기 위한 인자로 많이 활용되고 있으며, 최근 ICT 기술의 발달로 인해 열영상 카메라, 적외선 센서 등을 활용해서 실시간 측정을 하고, 정보를 작물 생육환경 제어에 활용하는 연구들이 많이 이루어지고 있다. 본 연구에서는 시설오이를 대상으로 캐노피 온도(Canopy temperature, $T_c$)와 대기온도(Air temperature, $T_a$)간의 상관관계, 또 ($T_c-T_a$)와 포화수증기압차(Vapor pressure deficit, VPD)와의 관계를 분석하였다. 대기온도와 상대습도를 이용하여 산정된 VPD가 엽온에 미치는 영향을 분석한 결과, 엽온 증가에 따라 VPD가 증가하였으며, 캐노피와 대기온도간의 차이 또한 VPD간에 음의 상관관계($R^2=0.82{\sim}0.89$)가 나타났는데, 이는 대기온도에 따른 엽온과 포화수증기압의 상승이 원인인 것으로 나타났다. ($T_c-T_a$)와 VPD값을 이용하면 작물 수분스트레스(Crop Water Stress Index, CWSI)를 산정할 수 있는 데, 결과값을 분석한 결과 $T_c$$T_a$의 차가 적은 경우 CWSI값이 증가함을 알 수 있었다. 향후 연구에서는 추가적으로 다양한 재배환경에서의 캐노피 온도, 포화수증기압차, 그리고 CWSI를 산정하여, 적정 생육 환경조성을 위한 지표로 활용할 계획이다.

  • PDF

Sensitivity Test for a Linear Programming Problem with Bounded Variables (일반한계문제의 감도분석)

  • 박순달
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.7 no.2
    • /
    • pp.49-52
    • /
    • 1982
  • 정규형(cannonical form) 또는 표준형(standard form)의 선형계획법문제의 감도분석은 이미 잘 알려져 있다. 여기에서는 다음과 같은 일반한계문제의 감도분석을 다루기로 한다. max CX s.t. (I) AX= b 0$\leq$ι$\leq$X$\leq$u 이 경우에서도 일반 선형계획법문제와 같이 C,b,A에 대해 감도분석을 수행할 수 있다. C와 b에 대한 강도분석은 비교적 쉬우나 A에 대한 것은 퍽 복잡하다.

  • PDF

Dual Cycle Plan for Efficient Ship Loading and Unloading in Container Terminals (컨테이너 터미널의 효율적인 선적 작업을 위한 Dual Cycle 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.33 no.8
    • /
    • pp.555-562
    • /
    • 2009
  • At container terminals, a major measurement of productivity can be work-efficiency in quay-side. At the apron, containers are loaded onto the ship and unloaded to apron by Q/C(Quay Crane). For improving the productivity of quay crane, the more efficient Y/T(Yard Tractor) operation method is necessary in container terminals. Between quay-side and yard area, current transferring methods is single-cycling which doesn't start loading unless it finishes unloading. Dual-cycling is a technique that can be used to improve the productivity of quay-side and utility of yard tractor by ship loading and unloading simultaneously. Using the dual-cycling at terminals only necessitates an operational change without purchasing extra equipment. Exactly, Y/T operation method has to be changed the dedicate system to pooling system. This paper presents an efficient ship loading and unloading plan in container terminals, which use the dual-cycling. We propose genetic and tabu search algorithm for this problem.

Optimal Parameter Design for Al/SiC Composites using Design of Experiments (실험계획법에 의한 Al/SiC 복합재료의 최적공정 설계)

  • Lee, K.J.;Kim, K.T.;Kim, Y.S.
    • Journal of Power System Engineering
    • /
    • v.15 no.5
    • /
    • pp.72-76
    • /
    • 2011
  • In this work, the parameter optimization for thermal-sprayed Al/SiC composites have been designed by $L_9(3^4)$ orthogonal array and analysis of variance(ANOVA). Al/SiC composites were fabricated by flame spray process on steel substrate. The hardness of composites were measured using micro-vickers hardness tester, and these results were analyzed by ANOVA. The ANOVA results showed that the oxygen gas flow, powder feed rate and spray distance affect on the hardness of the Al/SiC composites. From the ANOVA results, the optimal combination of the flame spray parameters could be extracted. It was considered that experimental design using orthogonal array and ANOVA was efficient to determine optimal parameter of thermal-sprayed Al/SiC composites.