1 |
송장호(2007), "컨테이너터미널에서의 Double cycle 하역기법의 최적 운영방안", 한국해양대학교 석사학위논문
|
2 |
Lim, A., Rodrigues, B., Xiao, F., and Zhu, Y.(2004), "Crane scheduling with spatial constraints", Naval research logistics, Vol.51, No.3, pp.386-406
DOI
ScienceOn
|
3 |
Peterkofsky, R. I., Daganzo, C. F.(1990), "A branch and bound solution method for the crane scheduling problem", Transportation research part B, Vol.24
DOI
ScienceOn
|
4 |
Zhang, H., Kim, K. H.(2009), "Maximizing the number of dual-cycle operations of quay cranes in container terminals", Compusters & Industrial Engineering, Vol.
56, No.3, pp.979-992
DOI
ScienceOn
|
5 |
최용석, 하태영(2005), "운영시스템의 도입에 따른 컨테이너터미널의 생산성 향상 평가", 한국항해항만학회지, 제29권, 제1호, pp.97-104
DOI
|
6 |
Moccia, L., Cordeau, J., Gaudioso, M., and Laporte, G.(2006), "A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal",Naval research logistics, Vol.53, No.1, pp.45-59
DOI
ScienceOn
|
7 |
Sammarra, M., Cordeau, J., Laporte, G., and Monaco, M. F.(2007), "A tabu search heuristic for the quay crane scheduling problem", Journal of Scheduling, Vol.10, No.4/5, pp.327-336
DOI
ScienceOn
|
8 |
Daganzo, C. F.(1989), "The crane scheduling problem", Transportation research part B, Vol.23, pp.197-175
|
9 |
Liu, J., Wan, Y., Wang, L.(2006), "Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel deartures", Naval
research logistics, Vol.53, No.1, pp.60-74
DOI
ScienceOn
|
10 |
Kim, K. H., Park, Y. M.(2004), "A Crane scheduling method for port container terminals", European Journal of Operational Research, Vol.156, No.3, pp.752-768
DOI
ScienceOn
|
11 |
Zhu, Y., Lim, A.(2006), "Crane scheduling with non-crossing constraint", Journal of the Operational Research Society, Vol.57, pp.1464-1471
DOI
ScienceOn
|
12 |
최용석, 김우선, 하태영(2006), "컨테이너터미널 리모델링기술검토 : 부산항 사례, 한국항해항만학회지", 제30권, 제6호, pp. 499-508
DOI
|
13 |
Goodchild, A. V., Daganzo, C. F.(2006), "Double-Cycling Strategies for Container Ships and Their Effect on Ship Loading and Unloading Operations", Transportation. Science. Vol.40, No.4, pp.473-483
DOI
ScienceOn
|
14 |
Lee, D.-H., Wang, H. Q., Miao, L.(2008a), "Quay crane scheduling with non-interference constraints in port container terminals", Transportation Research part E, Vol.44, No.1, pp.124-135
DOI
ScienceOn
|
15 |
Goodchild, A. V., Daganzo, C. F.(2007), "Crane double cycling in container ports: Planning methods and evaluation", Transportation research part B, Vol.41,
pp.875-891
DOI
ScienceOn
|
16 |
Lee, D.-H., Wang, H. Q., Miao, L.(2008b), "Quay crane scheduling with handling priority in port container terminals", Engineering Optimization, Vol.40, No.2,
pp.179-189
DOI
ScienceOn
|