Decision-making system for the resource forecasting and risk management using regression algorithms (회귀알고리즘을 이용한 자원예측 및 위험관리를 위한 의사결정 시스템)

  • Han, Hyung-Chul;Jung, Jae-Hun;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.311-319
    • /
    • 2015
  • In this paper, in order to increase the production efficiency of the industrial plant, and predicts the resources of the manufacturing process, we have proposed a decision-making system for resource implementing the risk management effectively forecasting and risk management. A variety of information that occurs at each step efficiently difficult the creation of detailed process steps in the scenario you want to manage, is a frequent condition change of manufacturing facilities for the production of various products even within the same process. The data that is not contiguous products production cycle also not constant occurs, there is a problem that needs to check the variation in the small amount of data. In order to solve these problems, data centralized manufacturing processes, process resource prediction, risk prediction, through a process current status monitoring, must allow action immediately when a problem occurs. In this paper, the range of change in the design drawing, resource prediction, a process completion date using a regression algorithm to derive the formula, classification tree technique was proposed decision system in three stages through the boundary value analysis.

A Study on the Technique of Construction Site Management based on UAV and USN (UAV와 USN 기반의 건설현장관리기법 연구)

  • Yeon, Sang-ho
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.457-467
    • /
    • 2019
  • In recent years, various methods have been attempted to visually manage the construction site efficiently, and in particular, there has been a tendency to use a UAV or a drone in the air rather than a land on a construction site, Can be visually photographed and recorded or analyzed. In this study, the unmanned aerial photographs were taken at least three times and the USN sensors were simultaneously operated on the main structure at the time of shooting, The goal of this research was to make the image information and environmental information of the construction site available for efficient construction management by matching. As a result, not only professional engineers at construction sites but also administrative managers can visually confirm the detailed situation of the site at the time of the construction site and the completion status, and can help decision making in appropriate budget input and appropriate resource support The experts in each field discussed the safety management of the construction site, the prevention of disaster and various factors of change which can be changed by natural environment factors.

Current Status of Ocean Satellite Remote Sensing Data and Its Distribution (해양의 인공위성 자료 현황과 배포 소개)

  • Yang, Chan-Su
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.11a
    • /
    • pp.51-55
    • /
    • 2007
  • As for satellite programs, the multipurpose satellite 1(KOMPSAT-1) was successfully launched on Dec. 21, 1999 and operated for three years. It is still properly operated even though its life cycle was ended. The development of KOMPSAT-2 (Korea Multipurpose Satellite-2) is near completion and the development of KOMPSAT-3, KOMPSAT-5 and COMS (Communication, Ocean, Meterological Satellite) are proceeding swiftly. In KORDI(Korea Ocean Research and Development Institute), the KOSC (Korea Ocean Satellite Center) construction project is being prepared for acquisition, processing and distribution of sensor data via L-band from GOCI(Geostationary Ocean Color Imager) instrument which is loaded on COMS(Communication, Ocean and Meteorological Satellite); it will be launched in 2000. Ansan(the headquarter of KORDD has been selected for the location of KOSC between 5 proposed sites, because it has the best condition to receive radio wave. The data acquisition system is classified antenna and RF. Antenna is designed to be ${\emptyset}$ 9m cassegrain antenna which has 19.35 $G/T(dB/^{\circ}K)$ at 1.67GHz, RF module, is divided into LNA(Low noise amplifier) and down converter, those are designed to send only horizontal polarization to modem The existing building is re-designed and classified for the KOSC operation concept; computing room, board of electricity, data processing room, operation room Hardware and network facilities have been designed to adapt for efficiency of each functions. The distribution system which is one of the most important systems will be constructed mainly on the internet, and it is also being considered constructing outer data distribution system as a web hosting service for to offering received data to user under an hour.

  • PDF

The Dessing and Implementation of the SPR/SCR Management System for Reliability Data Collection and Analysis (신뢰성 데이터 수집 및 분석을 위한 SPR/SCR 관리 시스템의 설계 및 구현)

  • Lee, Chang-Hui;Han, Pan-Am
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.2
    • /
    • pp.409-429
    • /
    • 1997
  • Problems encountered during software development or pteration nay result from defects in the software,ghrdware,or their oterations.Because of their diversity,the determination of the sources of a problem and its corrective adtion requires a centrally controlled system for monitoring provlems and detemining systematiccauses. In the paper,the SPR/SCR management system was developed and applied for the collection and analysis of the error data,process data and product data delected by each phasd in SDLC.There are four objectibes in the SPR/SCR management system.The first is to assure that software errors are documented,corrected,and vot forgottem. The second is to assure that SPR.are assessed for their validity.The third is to provide feedback on SPR status to the developer and the user.The fourth is ot prvide data for measuring and prediciting sofware quality and reliability.These goals could be satisfied by the application of the SPR/SCR mangement system.Also,the accomplishment rate of software reliability,criterion of test completion,estimation of release time, efficient development and management can be reflected by applying the SPR/SCR management system.

  • PDF

Calculation of preliminary site-specific DCGLs for nuclear power plant decommissioning using hybrid scenarios

  • Seo, Hyung-Woo;Sohn, Wook
    • Nuclear Engineering and Technology
    • /
    • v.51 no.4
    • /
    • pp.1098-1108
    • /
    • 2019
  • Korea's first commercial nuclear power plant at Kori site was permanently shut down in 2017 and is currently in transition stage. Preparatory activities for decommissioning such as historical site assessment, characterization, and dismantling design are being actively carried out for successful D&D (Dismantling and Decontamination) at Kori site. The ultimate goal of decommissioning will be to ensure the safety of workers and residents that may arise during the decommissioning of nuclear facilities and, thereby finally returning the site to its original status in accordance with the release criteria. Upon completion of decommissioning, the resident's safety at a site released will be assessed from the evaluation of dose caused by radionuclides expected to be present or detected at the site. Although the U.S. commercial nuclear power plants with decommissioning experience use different site release criteria, most of them are 0.25 mSv/y. In Korea, both the unrestricted and restricted release criteria have been set to 0.1 mSv/y by the Nuclear Safety and Security Commission. However, since the dose is difficult to measure, measurable concentration guideline levels for residual radionuclides that result in dose equivalent to the site release criteria should be derived. For this derivation, site reuse scenario, selection of potential radionuclides, and systematic methodology should be developed in planning stage of Kori site decommissioning. In this paper, for calculation of a preliminary site-specific Derived Concentration Guideline Levels (DCGLs) for the Nuclear Power Plant site, a novel approach has been developed which can fully reflect practical reuse plans of the Kori site by taking into account multiple site reuse scenarios sequentially, thereby striking a remarkable distinction with conventional approaches which considers only a single site scenario.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

A Study on the Transfer of Container Management Responsibilities to Drivers in the Inland Transportation of Containers (컨테이너 내륙운송에 있어서 운전기사에 대한 컨테이너 관리의 전가문제에 대한 고찰)

  • Yi, Ha-Yeon;Cho, Chan-hyouk
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.2
    • /
    • pp.69-80
    • /
    • 2022
  • Road transportation accounts for the largest share of cargo transport in Korea. Inland transportation is not only the beginning and completion point of container transportation, but it is also very complex and has many workers. The main job of container drivers, who play a key role in inland logistics, is to transport containers from ports and terminals to destinations. However, in addition to the main role, various container management obligations, such as cleaning containers and managing damaged containers during the transportation process, are implicitly transferred to container drivers. However, little research has been conducted on this issue. This study identified the working environment of container drivers and empirically analyzed the current status of container management responsibilities by drivers. Furthermore, it analyzed whether there was a difference in the degree of container management requirements by shipping company, terminal, and shipper. Differences in requirements for region(Busan, Kwangyang, Pohang) were analyzed, and improvement measures for the problem of transferring container management were also presented.

Procedural Quest Generation by NPC in MMORPG (MMORPG에서 NPC중심의 절차적 퀘스트 생성)

  • Jeong, Bo-Gyun;Cho, Sung Hyun;Kang, Shin Jin
    • Journal of Korea Game Society
    • /
    • v.14 no.1
    • /
    • pp.19-28
    • /
    • 2014
  • This paper tried to verify whether we can make NPCs generate emergent quests consistently by experiments in the persistent world of Role Playing Games where the persistent world can generate stories through interaction among game components. In this paper, we test NPC based procedural quest generation techniques assuming quest types suggested in the past research in the persistent virtual RPG world. Our system uses desire model of NPCs and dynamic resource management system to make decision of quest generation. Our decision process considers desire satisfaction, money deposit, and friendship of NPCs. These parameters are dynamically changed by quest completion status, and affect next quest generation process. This paper shows that NPCs in the persistent virtual world can generate quests based on procedural quest techniques consistently.

A Study on the Improvement of Optimum Cost Estimation of Cultural Property Utilization Business by Case Study (사례분석을 통한 문화재 활용사업의 적정대가기준 수립에 관한 연구)

  • Lee, Young-Mi;Oh, Se-Wook;Ahn, Bang-Ryul;Park, Hee-Taek
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.4
    • /
    • pp.119-131
    • /
    • 2017
  • The recent cultural properties utilization projects by the Cultural Heritage Administration have no rational standards to pay reasonable prices to stakeholders participating in budget compilation or projects. Therefore, there are frequent conflicts when calculating budgets between the Cultural Heritage Administration supervising projects and local governments or private organizations. Especially, as the items or detailed standard of budget compilation from planning to completion of projects are unclear, it is hard to stably operate projects, and eventually, they are no more than one-shot events without being developed into long-term projects. Thus, this study analyzes the overall operational status, systems, and problems of current cultural properties utilization projects. A national-level budget compilation standard system is then suggested, for the stable operation of cultural properties utilization projects. In addition, this study benchmarks the items and detailed standard of budget compilation used in similar areas, and also puts together actual cases.