• 제목/요약/키워드: Standard unit cost

검색결과 197건 처리시간 0.029초

화공플랜트 견적 소프트웨어 개발에 관한 연구 (Development of the Estimation Software for a Petrochemical Plant)

  • 민봉기;이재헌
    • 플랜트 저널
    • /
    • 제8권1호
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구 (A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 - (Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • 표준품셈은 우리나라 건설공사에 있어 가장 기본적인 요소이지만, 표준품셈이 공동주택 건설공사에서 실제 투입 되는 노무량과 큰 차이를 나타내고 있다. 따라서 실적공사비방식에 의해 공사비를 산정하는 것이 합리적인 대안이 될 수 있으나 원가계산서상에 각종 경비 등에는 정확한 노무량을 파악하여야 비용이 산출될 것이며 공사 진도 관리를 위해 투입 노무량을 정확히 파악할 필요가 있다. 본 연구는 2000년 이후 준공 된 수도권에서 공동주택 건설공사에서 표준품셈과 실투입 노무량을 조사하여 비교한 결과 다음과 같은 결과를 얻을 수 있었다. 실제 투입 노무량은 조적공 1.184인/천매, 미장공 0.048인/$m^2$, 방수공 0.039인/$m^2$, 타일공 0.059인/$m^2$이다. 표준품셈 대비 투입율은 보면 조적공 59.8%, 미장공41.3%, 방수공 31.5%, 타일공 34.3%이다. 방수공의 투입 비율이 가장 낮고 조적공이 비교적 높았다. 따라서 우리나라 공동주택 건설공사의 노무량은 실적공사비를 토대로한 원가계산이 바람직하지만, 공사관리에서 노무량이 주요 변수인 만큼 실제에 근접한 표준품셈을 지속적인 보완이 필요할 것으로 보인다.

해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토 (An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost)

  • 성낙원;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.579-583
    • /
    • 2004
  • 고속도로 신설 및 확장공사는 국가의 기반시설을 설치하기 위한 대규모 공공사업으로 정확한 산출근거에 의해 공사비용을 산정하여 적정 예산을 책정하여야 한다. 그러나 현재 고속도로 신설 침 확장공사의 구조물 해체 비용은 단지 구조물 설치 비용에 표준품셈에 명기된 일정 비율($10\~70\%$)을 곱하여 산정되고 있다. 해체 비용 산정에 이용되고 있는 표준품셈 상의 일정 비율은 과거 실적데이터를 기반으로 구축된 것이 아니라 해외 산정방식을 참고로 공사 관리자의 주관적 경험을 적용하여 도출된 것이다. 설치비에 일정비율을 곱하여 해체 비용을 산정하는 기존 방식은 프로젝트의 특성 및 건설현장의 주변 여건을 고려할 수 없으므로 노무량 및 장비 투임량의 변화를 고려할 수 없는 문제점을 가지고 있다. 따라서, 본 연구에서는 다양한 현장 조사 및 실측을 통한 해체 공사비 원가 분석을 수행하여 구조물 해체를 위한 적정원가 산정기준을 제시하고 기존 비율단가 적용방식의 적정성을 검토하고자 한다.

  • PDF

NUCLEAR FUEL CYCLE COST ESTIMATION AND SENSITIVITY ANALYSIS OF UNIT COSTS ON THE BASIS OF AN EQUILIBRIUM MODEL

  • KIM, S.K.;KO, W.I.;YOUN, S.R.;GAO, R.X.
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.306-314
    • /
    • 2015
  • This paper examines the difference in the value of the nuclear fuel cycle cost calculated by the deterministic and probabilistic methods on the basis of an equilibrium model. Calculating using the deterministic method, the direct disposal cost and Pyro-SFR (sodium-cooled fast reactor) nuclear fuel cycle cost, including the reactor cost, were found to be 66.41 mills/kWh and 77.82 mills/kWh, respectively (1 mill = one thousand of a dollar, i.e., $10^{-3}$ $). This is because the cost of SFR is considerably expensive. Calculating again using the probabilistic method, however, the direct disposal cost and Pyro-SFR nuclear fuel cycle cost, excluding the reactor cost, were found be 7.47 mills/kWh and 6.40 mills/kWh, respectively, on the basis of the most likely value. This is because the nuclear fuel cycle cost is significantly affected by the standard deviation and the mean of the unit cost that includes uncertainty. Thus, it is judged that not only the deterministic method, but also the probabilistic method, would also be necessary to evaluate the nuclear fuel cycle cost. By analyzing the sensitivity of the unit cost in each phase of the nuclear fuel cycle, it was found that the uranium unit price is the most influential factor in determining nuclear fuel cycle costs.

8200호대 전기기관차용 기존품 보조전원장치의 수명주기비용 평가에 관한 연구 (A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive)

  • 이계승;김완일;김재문
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.331-336
    • /
    • 2018
  • In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.

정보통신시설공사 수량산출기준에 관한 연구 (A Study on the Standard Method of Measurement Information Communication Field Contractors)

  • 설동화;이광희
    • 정보통신설비학회논문지
    • /
    • 제2권4호
    • /
    • pp.52-63
    • /
    • 2003
  • This study proposes a change from the currentexpected price integrated system, which is based on the standard of estimated unit manpower and material, to a new actual construction cost integrated system. In order to implement it, the standard method of measurement organization system as well as the communication area standard of estimated unit manpower and material should be changed Moreover, the work breakdown structure and itemized structure should be assorted.

  • PDF

간호중재분류체계(NIC)에 근거한 내${\cdot}$외과계 간호단위의 간호중재 수행 및 건강보험 수가 항목 분석 (Analysis of the Nursing Interventions Performed in the Medical & Surgical Units and the Health Insurance Cost Items Based on the NIC)

  • 박옥엽;정면숙
    • 간호행정학회지
    • /
    • 제11권4호
    • /
    • pp.449-467
    • /
    • 2005
  • Purpose: This study aims to offer the fundamental data in order to cost the nursing service on the basis of the NIC and a close examination of the interventions that are contained in the health insurance cost list under the system of the current health insurance. Methods: The data is handled with the SPSS 10.0 program. The participants' general peculiarity is calculated in terms of the real number and the percentage, and the performing frequency of the nursing interventions is calculated in terms of the mean and the standard deviation. the correlation between the participants' general peculiarity and the performing frequency of the nursing interventions is analysed with t-test or one way ANOVA of SPSS. Results: In the performing frequency of the nursing interventions, the domain of "the physiological: basic" was the highest as 2.69${\pm}$1.21, the domain of "the behavioral" was the lowest as 2.11${\pm}$1.12. There were 50 core interventions in the medical unit, 48 in the surgical unit, 24 in the MICU and 33 in the SICU. The health insurance cost items contained commonly in the core interventions of each unit were 12, and the health insurance cost items except 12 items contained commonly in the core interventions of each unit were appeared 14 items in the medical unit, 6 in the surgical unit, 7 in the MICU and 2 in the SICU. The core interventions contained commonly in four units of the medical unit, the surgical unit, the MICU & the SICU are 18. And among these, the core interventions contained in the health insurance cost items are 10; pain management, hyperglycemia management, analgegic administration, medication administration: intravenous, oxygen therapy, pressure ulcer prevention, fluid management, fluide monitoring, intravenous(IV) insertion, intravenous(IV) therapy. As the result of the comparison & analysis between the core interventions of the NIC and the health insurance cost items, the core interventions contained in the health insurance cost list are 21(29 as the health insurance cost items). Conclusion: In the performing frequency of the nursing interventions, the domain of "the physiological: basic" is being performed most frequently, and in the performing frequency of the core interventions, the interventions of the domain of "the physiological: complex" is being performed most frequently. On the basis of these results, the writer hopes that the attempts to interlink the nursing interventions into the nursing cost by using of standard terms and the efforts to cost the nursing services would also be made in the future constantly.

  • PDF

무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석 (Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method)

  • 이동욱;조홍준;이근조;김남식
    • 대한토목학회논문집
    • /
    • 제31권3D호
    • /
    • pp.457-468
    • /
    • 2011
  • 최근 들어 제주도내 도심지에서 주로 시공이 이루어지는 하수관거 정비공사 및 일부 도로공사 현장의 암 터파기 시공에서 무진동 굴착공법이 사용되고 있으나, 단위 물량에 대한 공사비를 산정함에 있어서 적정한 단가가 제시되지 못하는 문제점이 있다. 따라서 본 연구에서는 제주 지역 인근 현장에서 암터파기 작업에 활용되고 있는 무진동 굴착공법에 대한 현장 모니터링을 바탕으로 일위대가방식과 작업조 방식의 생산성을 비교 분석하였다. 이를 위해 35개 현장의 작업 데이터를 수집하였고, 30개 데이터를 통해 회귀식을 도출하였으며, 나머지 5개의 자료를 통해 검증을 실시하였으며, 이를 통해 작업조 방식의 1일 작업물량은 $16.43m^3$ 임을 도출하였다. 또한 작업조 방식의 공사비의 산정을 위해 현장여건을 고려한 장비의 조합과 작업인원에 차이를 둔 노무량의 조합을 도출하였다. 회귀분석을 통해 도출된 작업조의 1일 작업물량($16.43m^3$)에 근거한 공사비를 산출하였고, 이를 일위대가 방식의 공사비와 비교, 분석하였다.

해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발 (Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation)

  • 김효진;강인석;이동욱;김창학
    • 대한토목학회논문집
    • /
    • 제34권3호
    • /
    • pp.1007-1015
    • /
    • 2014
  • 지속가능한 발전을 추구하는 최근의 추세에서 해체산업은 자원의 재활용이나 재생측면에서 중요성이 더욱 커져가고 있다. 주택건립 및 기존주택현황을 고려할 때 해체시장의 규모는 계속 증가될 것으로 예측되고 있다. 그러나 국내에는 해체공사의 발주 및 입찰에 기본이 되는 내역기준이 매우 미비한 실정이고, 공사비를 산정하기 위한 전산시스템도 개발되어 있지 못하다. 따라서 본 연구에서는 분별해체에 대한 시험시공 자료를 분석하여 분별해체공사의 일위대가 산정에 도움 될 수 있는 품 21개 항목과 현재 해체공사에 가장 많이 활용되고 있는 1.0m3 급 압쇄장비의 작업능력을 제시한다. 해체공사의 원활한 공사비 견적을 위해 해체공사에 특화하여 단가정보, 단가관리, 표준일위대가관리, 일위대가표, 내역서 작성, 보고서 작성 시스템을 개발하였다. 공사비 견적 시스템은 기계식해체와 발파식해체에 공통 적용가능토록 구성하였다. 본 시스템의 가장 큰 특징은 표준 WBS를 활용하여 비용견적을 수행하는 것이다. WBS는 표준 일위대가표 및 표준 DB와 연계되어 견적에 경험이 없는 사용자도 견적작업을 수행할 수 있는 장점을 갖게 된다.