1 |
Y.S. Lee, J.O. Kim, H.C. Kim and D.U. Jang, "A Study on Modeling of Life Cycle Cost for Magnetic Levitation Train", JKSR, Vol. 12, No. 6, pp. 1076-1080, 2009.
|
2 |
J.H. Kim, H.K. Jun, J.S. Park and H.Y. Jeong, "A Study on the Life Cycle Cost Calculation of the Railroad Vehicle Based on the Maintenance Information", JKSR, Vol. 12, No. 1, pp. 88-94, 2009.
|
3 |
J.W. Kim, K.W. Chung, J.S. Park and J.D. Chung, "A Life Cycle Cost Model and Procedure for the Acquisition of Rolling Stocks", JKSR, Vol. 13, No. 3, pp. 257-263, 2010.
|
4 |
Korea railway corporation fixed asset accounting guideline, Korea railway corporation, 2009.
|
5 |
J.M. Kim, C.J. Yun, Y.S. Kim, C.Y. Chang and J.S. Lee, "The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1)", JEET, Vol. 60, No. 11, pp. 2176-2181, 2011.
|
6 |
C.J. Yun, M.G. Noh and J.M. Kim, "The Life Cycle Cost Estimation for Domestic Products Motor Block of KTX-1 Considering Periodic Maintenance", JEET, Vol. 62, No. 2, pp. 288-292, 2013.
|