Browse > Article
http://dx.doi.org/10.5370/KIEE.2018.67.2.331

A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive  

Lee, Kye-Seung (Dept. of Railway Vehicle & Operation System Engineering, Korea National University of Transportation)
Kim, Wan-il (Dept. of Transportation System Engineering, Korea National University of Transportation)
Kim, Jae-Moon (Dept. of Transportation System Engineering, Graduate School of Transportation, Korea National University of Transportation)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.67, no.2, 2018 , pp. 331-336 More about this Journal
Abstract
In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.
Keywords
Auxiliary power unit; Life cycle cost; Evaluation model; Preventive maintenance cost; Electric locomotive;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Y.S. Lee, J.O. Kim, H.C. Kim and D.U. Jang, "A Study on Modeling of Life Cycle Cost for Magnetic Levitation Train", JKSR, Vol. 12, No. 6, pp. 1076-1080, 2009.
2 J.H. Kim, H.K. Jun, J.S. Park and H.Y. Jeong, "A Study on the Life Cycle Cost Calculation of the Railroad Vehicle Based on the Maintenance Information", JKSR, Vol. 12, No. 1, pp. 88-94, 2009.
3 J.W. Kim, K.W. Chung, J.S. Park and J.D. Chung, "A Life Cycle Cost Model and Procedure for the Acquisition of Rolling Stocks", JKSR, Vol. 13, No. 3, pp. 257-263, 2010.
4 Korea railway corporation fixed asset accounting guideline, Korea railway corporation, 2009.
5 J.M. Kim, C.J. Yun, Y.S. Kim, C.Y. Chang and J.S. Lee, "The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1)", JEET, Vol. 60, No. 11, pp. 2176-2181, 2011.
6 C.J. Yun, M.G. Noh and J.M. Kim, "The Life Cycle Cost Estimation for Domestic Products Motor Block of KTX-1 Considering Periodic Maintenance", JEET, Vol. 62, No. 2, pp. 288-292, 2013.