• Title/Summary/Keyword: Standard cost

Search Result 2,276, Processing Time 0.041 seconds

Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis (사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구)

  • Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF

The Reduction ways of Medicine Material Costs of Nuclear Medicine In Vitro (핵의학 체외검사의 진료재료비용 절감 방안)

  • Song, Hun-Kang;Seo, Jung-Mi;Yang, Joon-Ho;Kim, Eun-Jung;Kim, Chang-Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.15 no.2
    • /
    • pp.111-115
    • /
    • 2011
  • Purpose: In vitro uses dose response curve with 6 to 7 standard concentrations in every examination to analyze examination results and this use of dose response curve comprises a large portion of the consumption of medicine material. At this present, some ones of in-hospital examination items have shown mostly low result of distribution in the analyzed features and these examinations have been judged that it would be unnecessary to use the last standard concentration. Hence, this study selects those examination items showing low result of distribution and reviews the cases contributed to less consumption of medicine material and revenue growth of hospital by reduction of medicine material used in the place of the last standard concentration. Materials and Methods: The study was made targeting 11 examination items out of total 43 items of the in-hospital examination and since these examination items were mostly low in the features as the examination results of patients or the examination results were distributed to show lower concentration than the previous last standard concentration, it carried out the examination without using the last standard concentration, which could generate the effect to reduce medicine material (examination tube) used in the last standard concentration as many as the number of examination carried out. For this, it examined the number of medicine material reduction by month during the period from July, 2009 to February, 2011 and estimated the reduction amount of medicine material calculated the number of reduction by the unit cost of medicine material as well as the profit generated by the reduced medicine material to use for the medicine material of patient examination. Results: The total number of medicine material reduced during the period from July, 2009 to February, 2011 was 3,131 pieces, which had the effect to reduce the medicine material equivalent to about 31 kits of reagent. To calculate this by the unit cost of the medicine material, it analyzed to reduce about 6.4 million won of medicine material cost. Also the reduced medicine materials were used for medicine materials of patient examination and this was analyzed to generate about 13.75 million won of profit based on the ABC cost accounting. Conclusion: It showed no problem in the analysis of examination result even without using the last standard concentration regarding those examination items with low distribution of the patient examination result. For these examination items, it was able to reduce medicine material used for the last standard as many as the number of examination carried out. Also, the adjustment of concentration range was found to have no problem in the reliability of examination result. Therefore, this case will be applicable in those occasions of when the analysis of patient examination result is mostly distributed at the lower level or when an examination with the distribution of patient results in the range of lower concentration than the previous last standard concentration is carried out and this is considered to increase the efficiency in the use of medicine material in vitro as well as contribute to the profit of hospitals.

  • PDF

Application of IFC Standard in Interoperability and Energy Analysis

  • Hyunjoo Kim;Zhenhua Shen
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.87-93
    • /
    • 2013
  • In this research, a new methodology to perform building energy analysis using Industry Foundation Classes (IFC) standard has been studied. With the help of Archicad 14 modeling software, a 3D test model is generated and then exported to IFCXML format. A ruby code program retrieves the building information from the resulting IFCXML file using Nokogiri library. An INP file is created and gets ready for next energy analysis step. DOE 2.2 program analyzes the INP file and gives a detailed report of the energy cost of the building. Case study shows when using the IFC standard method, the Interoperability of the energy analysis is greatly improved. The main stream 3D building modeling software supports IFC standard. DOE 2.2 is able to read the INP file generated by IFC file. This means almost any 3D model created by main stream modeling software can be analyze in terms of energy cost Thus, IFC based energy analysis method has a promising future. With the development and application of IFC standard, designers can do more complex and easy-to-run energy analysis in a more efficient way.

  • PDF

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

A Study on the optimum scale of the number of beds of both the standard and the high-class (기준병상수와 상급병상수의 적정규모에 관한 연구)

  • Back, Seung-Joon;Yu, Seung-Hum;Sohn, Tae-Yong
    • Korea Journal of Hospital Management
    • /
    • v.6 no.3
    • /
    • pp.109-129
    • /
    • 2001
  • The purpose of this study was the acquisition of the optimum scale of the apportionment of standard & high-class bed for the maximum profit representative of the desire of customers in a General Hospital with 1,100 beds located in Seoul. This investigation was proceeded by the analysis of the result of the simulation with the survey of both the patients' needs for bed and the degree of the medical service by the grade of the ward. And finally the consequence was obtained as follows: 1. The result of the investigation of the inpatients' preference for the grade of ward classes shows that a private ward reflected 4.3 percent, a semi-private ward 1.7 percent, a three-bed ward 0.1 percent, and a ward with six beds 93.9 percent each other. 2. A questionnaire poll was paralleled of service terms of a medical doctor and a nurse by ward class, the data were used for the standard of the allotment of labor cost by the ward class. The poll shows that the service tenn of a medical doctor and a nurse based on a ward with six beds by ward class showed 1.7 times in internal medicine and 1.9 times in surgery at a private ward; 1.4 times in internal medicine and 1.7 times in surgery at a semi-private room; and 1.2 times both in internal medicine and in surgery at a three-bed ward 3. The resultant findings revealed the most profit per bed and per patient in a private ward. However, an analysis of profit with a standard of unit area by ward class represented a higher profit in both the internal medicine and the surgery semi-private ward than other ward classes. 4. The result of the analysis through simulation based on the data of the prime cost per the ward class proved the optimum scale of the distribution of beds by class as follows: sixteen beds of the internal medicine and twenty three beds of the surgery in the private ward; two hundreds and two of the internal medicine and one hundred and ninety eight of the surgery in the semi-private room; three of both the internal medicine and the surgery each other in the three-bed ward; one hundred and ninety eight of the internal medicine and two hundred and fifty two of the surgery in the ward with six beds. The result of this research exhibits that the income and expenditure of the hospital could be improved by changing parts of wards into private ones(containing the maximum profit per a unit of width) in case the scale of the number of beds is reset with the consideration of the profit per the unit width. In the near future it's strongly expected that the research for the more scientific standard of the allotment of labour cost by ward class and for definition of the optimum scale of the number of beds that actualize the maximum profit with the change of the three elements of the prime cost: cost of materials; labor costs; management expenses.

  • PDF

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Recalculation of Monthly Weather Table for Construction Standard Cost Estimating on Aerial Photogrammetry (항공사진측량 품셈 개정을 위한 월별천후표 재계산)

  • Song, DongSeob
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.37 no.6
    • /
    • pp.571-577
    • /
    • 2019
  • Since the introduction of digital cameras in an aerial-photogrammetry field on 2006, the technological paradigm related to the photogrammetry has been shifting from the analog types to digital types. However, current construction standard cost for the aerial-photogrammetry and the digital mapping are being mixed with analog-based concepts and digital-based methods. In the current standard cost, the monthly weather table is closely related to the calculation of the number of flying days in a taking of aerial photograph. The current monthly weather table uses the results calculated from the observation data of total cloud amount from 1999 to 2007. In this study, the monthly weather table was calculated using the total cloud data during ten years from 2009 to 2018. As a result, the newly calculated number of clear days for 29 stations was analyzed as 44 days decreased by 6 days. The maximum number of clear days decreased in Jinju as 23 days, and the highest decreased clearing days was February.

Improvement of the Standard Cost of Development Charge System in Jeju (개발부담금제도에 따른 제주지역의 표준비용 산정 개선방안)

  • Hong, Seung-Jong;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1421-1429
    • /
    • 2015
  • During the six years from 2006 to 2011, based on a study of projects with an area equivalent to or less than $2,700m^2$ located in Jeju self-governing province, it was shown, through comparison with the pre-existing calculation methods, that there were many problems with the application of the standard cost. Accounting for the uniqueness of Jeju province, the study suggested an alternative method for applying the standard cost, basing it on property usage of either urban area or non-urban area pursuant to the National Land Planning and Utilization Act rather than land type of either mountain area or non-mountain area, with the utilization of T-test and ANOVA raising the reliability of this study.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

An Empirical Study on Contract Model for IT Outsourcing Application Operation (IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구)

  • Kim, Heungshik;Park, Soah
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.