• 제목/요약/키워드: Standard Cost

검색결과 2,261건 처리시간 0.028초

사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구 (Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis)

  • 한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF

핵의학 체외검사의 진료재료비용 절감 방안 (The Reduction ways of Medicine Material Costs of Nuclear Medicine In Vitro)

  • 송훈강;서정미;양준호;김은정;김창호
    • 핵의학기술
    • /
    • 제15권2호
    • /
    • pp.111-115
    • /
    • 2011
  • 체외 검사는 각 검사 마다 6-7개의 standard 농도를 이용한 표준곡선(Dose response curve)을 사용하여 검사 결과를 분석하며, 표준곡선 사용은 진료재료 소모에 많은 부분을 차지하고 있다. 현재 원내에서 검사하는 검사항목 가운데 일부 검사 항목은, standard 농도를 이용한 환자의 검사 결과 분석수치가 대부분 낮은 결과의 분포를 보이고 있었으며, 이러한 검사 들은 마지막 standard 농도의 사용이 불필요하다고 판단하였다. 이에 낮은 검사 결과의 분포를 보이는 검사항목들을 선정하고, 마지막 standard 농도의 자리에 사용했던 진료 재료를 절감하여 진료재료의 소모비용을 줄였다. 원내 검사 항목 중 11개의 검사 항목을 진료재료 절감 대상항목으로 하였고, 검사가 진행한 횟수 만큼 마지막 standard농도에 사용되었던 진료재료(검사 Tube)를 절감할 수 있었다. 2009년 7월부터 2011년 2월까지 월별 진료재료 절감 개수, 절감 개수를 진료재료 단가로 계산하여 진료재료 절감액과, 절감된 진료재료를 환자 검사용 진료재료로 사용하여 발생한 수익을 ABC 원가계산을 근거로 산정하였다. 2009년 7월부터 2011년 2월까지 절감된 진료 재료는 3,131개였다. 이는 약 31kit의 검사 시약에 해당되는 진료재료를 절감하였다. 이것을 진료재료 단가로 계산하면 약 640만원의 진료재료비가 절감되었고, 이러한 진료 재료는 환자 검사 진료재료로 사용되어 약 1,370만원의 수익이 발생하였다. 환자의 검사 결과가 정상이거나, 낮게 분포하는 검사항목들은 마지막 standard 농도를 사용하지 않고 범위를 줄여서 검사를 진행하여도 검사 결과를 분석하는데는 영향이 없었고, standard 농도 범위 조정이 검사 결과의 신뢰성에는 영향이 없는 것으로 분석 되었다. 따라서 이 활동은 핵의학 체외검사의 진료재료 사용에 효율성을 높이고 진료재료 절감 및 병원 수익에 많은 효과가 있을 것으로 생각한다.

  • PDF

Application of IFC Standard in Interoperability and Energy Analysis

  • Hyunjoo Kim;Zhenhua Shen
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.87-93
    • /
    • 2013
  • In this research, a new methodology to perform building energy analysis using Industry Foundation Classes (IFC) standard has been studied. With the help of Archicad 14 modeling software, a 3D test model is generated and then exported to IFCXML format. A ruby code program retrieves the building information from the resulting IFCXML file using Nokogiri library. An INP file is created and gets ready for next energy analysis step. DOE 2.2 program analyzes the INP file and gives a detailed report of the energy cost of the building. Case study shows when using the IFC standard method, the Interoperability of the energy analysis is greatly improved. The main stream 3D building modeling software supports IFC standard. DOE 2.2 is able to read the INP file generated by IFC file. This means almost any 3D model created by main stream modeling software can be analyze in terms of energy cost Thus, IFC based energy analysis method has a promising future. With the development and application of IFC standard, designers can do more complex and easy-to-run energy analysis in a more efficient way.

  • PDF

공동주택 건설공사비지수의 변동추세 분석 (Analysing Construction Cost Index Fluctuation on Apartment Housing)

  • 박원영;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

기준병상수와 상급병상수의 적정규모에 관한 연구 (A Study on the optimum scale of the number of beds of both the standard and the high-class)

  • 백승준;유승흠;손태용
    • 한국병원경영학회지
    • /
    • 제6권3호
    • /
    • pp.109-129
    • /
    • 2001
  • The purpose of this study was the acquisition of the optimum scale of the apportionment of standard & high-class bed for the maximum profit representative of the desire of customers in a General Hospital with 1,100 beds located in Seoul. This investigation was proceeded by the analysis of the result of the simulation with the survey of both the patients' needs for bed and the degree of the medical service by the grade of the ward. And finally the consequence was obtained as follows: 1. The result of the investigation of the inpatients' preference for the grade of ward classes shows that a private ward reflected 4.3 percent, a semi-private ward 1.7 percent, a three-bed ward 0.1 percent, and a ward with six beds 93.9 percent each other. 2. A questionnaire poll was paralleled of service terms of a medical doctor and a nurse by ward class, the data were used for the standard of the allotment of labor cost by the ward class. The poll shows that the service tenn of a medical doctor and a nurse based on a ward with six beds by ward class showed 1.7 times in internal medicine and 1.9 times in surgery at a private ward; 1.4 times in internal medicine and 1.7 times in surgery at a semi-private room; and 1.2 times both in internal medicine and in surgery at a three-bed ward 3. The resultant findings revealed the most profit per bed and per patient in a private ward. However, an analysis of profit with a standard of unit area by ward class represented a higher profit in both the internal medicine and the surgery semi-private ward than other ward classes. 4. The result of the analysis through simulation based on the data of the prime cost per the ward class proved the optimum scale of the distribution of beds by class as follows: sixteen beds of the internal medicine and twenty three beds of the surgery in the private ward; two hundreds and two of the internal medicine and one hundred and ninety eight of the surgery in the semi-private room; three of both the internal medicine and the surgery each other in the three-bed ward; one hundred and ninety eight of the internal medicine and two hundred and fifty two of the surgery in the ward with six beds. The result of this research exhibits that the income and expenditure of the hospital could be improved by changing parts of wards into private ones(containing the maximum profit per a unit of width) in case the scale of the number of beds is reset with the consideration of the profit per the unit width. In the near future it's strongly expected that the research for the more scientific standard of the allotment of labour cost by ward class and for definition of the optimum scale of the number of beds that actualize the maximum profit with the change of the three elements of the prime cost: cost of materials; labor costs; management expenses.

  • PDF

공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 - (Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • 표준품셈은 우리나라 건설공사에 있어 가장 기본적인 요소이지만, 표준품셈이 공동주택 건설공사에서 실제 투입 되는 노무량과 큰 차이를 나타내고 있다. 따라서 실적공사비방식에 의해 공사비를 산정하는 것이 합리적인 대안이 될 수 있으나 원가계산서상에 각종 경비 등에는 정확한 노무량을 파악하여야 비용이 산출될 것이며 공사 진도 관리를 위해 투입 노무량을 정확히 파악할 필요가 있다. 본 연구는 2000년 이후 준공 된 수도권에서 공동주택 건설공사에서 표준품셈과 실투입 노무량을 조사하여 비교한 결과 다음과 같은 결과를 얻을 수 있었다. 실제 투입 노무량은 조적공 1.184인/천매, 미장공 0.048인/$m^2$, 방수공 0.039인/$m^2$, 타일공 0.059인/$m^2$이다. 표준품셈 대비 투입율은 보면 조적공 59.8%, 미장공41.3%, 방수공 31.5%, 타일공 34.3%이다. 방수공의 투입 비율이 가장 낮고 조적공이 비교적 높았다. 따라서 우리나라 공동주택 건설공사의 노무량은 실적공사비를 토대로한 원가계산이 바람직하지만, 공사관리에서 노무량이 주요 변수인 만큼 실제에 근접한 표준품셈을 지속적인 보완이 필요할 것으로 보인다.

항공사진측량 품셈 개정을 위한 월별천후표 재계산 (Recalculation of Monthly Weather Table for Construction Standard Cost Estimating on Aerial Photogrammetry)

  • 송동섭
    • 한국측량학회지
    • /
    • 제37권6호
    • /
    • pp.571-577
    • /
    • 2019
  • 우리나라에서는 2006년부터 항공사진 촬영방식에 디지털 카메라를 도입한 이후 항공사진 촬영과 관련한 기술 패러다임이 아날로그 방식에서 디지털 방식으로 전환되고 있다. 그러나 현재 항공사진 촬영과 수치지도 제작에 대한 표준품셈은 아날로그 기반의 품셈과 디지털 기반 품셈이 혼재되어 활용되고 있다. 항공사진촬영과 관련한 품셈의 개정항목 중에서 월별천후표는 비행기의 운항일수 계산과 밀접한 관련이 있다. 현재의 월별천후표는 1999년부터 2007년 동안의 전운량 관측 자료를 이용하여 계산한 결과를 사용하고 있다. 본 연구에서는 2009년부터 2018년 동안의 전운량 관측 자료를 이용하여 월별천후표의 계산을 연구하였다. 결과적으로 29개의 동일한 지점에 대하여 신규 산출한 평균 쾌청일수는 기존의 50일에서 6일이 감소한 44일로 분석되었다. 최대 쾌청일수 감소는 진주에서 23일로 나타났으며, 최대 쾌청일이 감소한 달은 2월로 나타났다.

개발부담금제도에 따른 제주지역의 표준비용 산정 개선방안 (Improvement of the Standard Cost of Development Charge System in Jeju)

  • 홍승종;이동욱
    • 대한토목학회논문집
    • /
    • 제35권6호
    • /
    • pp.1421-1429
    • /
    • 2015
  • 본 연구는 2006년부터 2011년까지 제주특별자치도 내 개발부담금 부과대상 사업장을 통계자료로 활용하였으며, $2,700m^2$이하의 개발사업에 대해 실비정산방식에 의해 산출된 개발비용 분석을 통해 현재 적용되고 있는 단위면적당 표준비용의 적정성을 분석함으로써 표준비용 적용의 문제점을 도출하였다. 그 결과 표준비용제도의 개선방안으로 제주특별자치도의 현실성 및 특수성을 고려하여 표준비용 적용 대상을 지형별 산지 산지외로 구분하는 것보다는 "국토의 계획 및 이용에 관한 법률"에 따른 용도지역별 도시 비도시지역으로 구분하여 적용하는 방안을 제시하였다. 또한 통계분석 기법인 t-검정과 분산분석을 통해 분석결과를 검증하여 연구결과의 신뢰성을 높였다.

국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 - (Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project)

  • 정기창;이재섭
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.95-102
    • /
    • 2016
  • 공기연장에 따른 간접비 산정에 관한 연구가 최근 정량적인 부분에 집중되어 제시되고 있으며, 최근 제도개선에 관한 연구가 계속적으로 이루어지고 있다. 국내 공공 공사의 경우 발주자가 국가인 경우에는 국가계약법을, 지방자치단체인 경우에는 지방계약법을 적용받게 되는데 이러한 산정기준의 문제점에 대해 명확하게 개선방안의 요구가 있음에도 개선방안이 제시되고 있지 않아 개별 문제점에 대한 면밀한 연구가 필요한 실정이다. 본 연구는 이러한 배경에서 '국가계약법'에 따른 산정기준과 '지방계약법'에 따른 산정기준의 각 산정결과를 비교하고, 문제점을 고찰 후 현장사례를 분석하여 적정한 기준을 제시하였다. 각 규정을 고찰한 결과 기타경비 산정방식이 다르게 규정되어 있었으며 이에 따라 실제 비용이 적게는 12.37%부터 24.95%까지 차이가 발생하고 있다는 결과를 얻을 수 있었다. 이러한 문제점은 실비가 아닌 계약당시 요율을 그대로 기타경비요율로 적용하는 국가계약법에 따른산정방식의 문제점에 따른 것이며, 이에 따라 실제 비용보다 적은 공기연장 비용이 산정되는 것으로 나타났다. 이에 본 연구는 현장자료를 기반으로 적정한 기타경비 산정요율을 총공사비 대비 1일당 기타경비 요율과 간접비 대비 요율방식으로 제시하였다.

IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구 (An Empirical Study on Contract Model for IT Outsourcing Application Operation)

  • 김흥식;박소아
    • 한국IT서비스학회지
    • /
    • 제16권2호
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.