근거리선로고장전류 차단시험용 Artificial line (Artificial line for short-line fault test)

  • 박승재;류형기;강영식;고희석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 C
    • /
    • pp.1783-1785
    • /
    • 2001
  • With the 4-MJ synthetic testing facilities completed, KERI can perform the circuit breaker testing up to 420 kV, 50 kA ratings. The short-line fault test is one of the necessary test items which are required for the circuit breaker, and in order to perform the short-line fault test KERI(Korea Electrotechnology Institute) has used the "new artificial line" which has small dimension and is easy to generate the saw-tooth wave. This paper describes the following items of the new artificial line. -Description of 4-kinds of artificial lines and determination of the circuit parameter of artificial line. -TRV characteristics of saw-tooth waves for each circuit. -KERI's artificial line.

  • PDF

직류전원을 이용한 배전급 차단기의 등가 3상 합성투입시험법 (Equivalent three-phase synthetic making test for medium voltage circuit breaker of distribution system using DC power)

  • 박병락;조만영;김진석;신희상;김재철
    • 조명전기설비학회논문지
    • /
    • 제25권7호
    • /
    • pp.105-113
    • /
    • 2011
  • The study about three-phase synthetic making test using DC power has been performed in order to increase the making test capacity on Vacuum Circuit Breaker. And, it made possible to solve the limitations that short-circuit testing facilities can not fulfill the testing requirements of VCB exceeding three-phase 36[kV] 31.5[kA]. By using DC power and high speed spark-gap switch, this method made the equivalence with the pre-arc that occurred during the making process under the fault condition of power system. As results, KERI(Korea Electrotechnology Research Institute) could have capacity to carry out type test for VCB under three-phase 52[kV] 40[kV], which satisfies the IEC Standard.

여자전류 재단에 따른 단락 시험용 변압기의 절연영향 평가 (Estimating the Effect of Overvoltage Results from Excitation Current Chopping in Short-circuit Transformer)

  • 오승렬;박지훈;박종화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.78-80
    • /
    • 2007
  • The residual flux in transformer's iron cores leads to a distortion of short-circuit current occasionally. And some considerable distortion may have effect on the validation of the test results. To avoid the substantial distortion, a suitable pretest is performed before the actual test. In case of applying this method there must be excessive overvoltage due to switching of an unloaded transformer and chopping of an excitation current. The purpose of this paper is estimate that the effect of the overvoltage results from this phenomenon on insulation performance of short-circuit transformer.

  • PDF

송전케이블 삼상단락 실증시험을 통한 전자력 대책방안 연구 (The Study on Countermeasures of Electromagnetic Force by Three Phase Short-Circuit Test of Underground Transmission Cable)

  • 강지원;박흥석;윤종건;김양상;홍동석;장우석
    • 전기학회논문지
    • /
    • 제58권12호
    • /
    • pp.2342-2348
    • /
    • 2009
  • Even though underground transmission cable is an essential transmission method to supply stable power for downtown and population center, the interaction of electromagnetic force by fault current is very large comparing to overhead transmission line due to restricted installation space such as tunnel, and close consideration is required for it. This paper presents countermeasures to reduce and release the effect of electromagnetic force with rope binding and installation of spacer and describes its efficacy through three phase short-circuit test, which will be utilized as basic materials for improvement and development of cleat, hanger, etc. to reduce and release effect of electromagnetic force in the future.

차단기의 투입성능 평가를 위한 최적 합성투입시험설비 (Optimized Synthetic Making Test Facilities for Estimating the Making Performance of Circuit Breaker)

  • 서윤택;김맹현;송원표;고희석;박승재
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권6호
    • /
    • pp.284-292
    • /
    • 2005
  • Because all of the short-circuit testing laboratories have the limitation of test facilities, the synthetic making test methods have been used to estimate the short-circuit making performance of the ultra high-voltage circuit breaker as the alternative to direct test methods. So, KERI(Korea Eelctrotechnology Research institute) has completed the construction of the synthetic making test facilities using the low capacity step-up transformer method which fulfill the requirements specified in newly revised IEC 62271-100 Edition 1.1(2003) and have the testing capability up to 550kV, 63kA full-pole circuit breaker. The test facilities using the low capacity step-up transformer method presented in this paper are made up of the unit equipments such as HCS(High-speed Closing Switch), ITMC(Initial Transient Making Current) circuit and UP TR(low capacity step-up transformer) and have the operating range of 17.6$^{\circ}$ $\~$ 145.1$^{\circ}$ for testing the circuit breaker rated on up to 50kA and 43.1$^{\circ}$ $\~$ 119.6$^{\circ}$ for more than 50kA.

초전도 한류기 설계 검증을 위한 초전도 한류 모듈 단락 특성 시험 (Test of a Current Limiting Module for Verifying of the SFCL Design)

  • 양성은;김우석;이지영;김희선;유승덕;현옥배;김혜림
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제14권3호
    • /
    • pp.13-17
    • /
    • 2012
  • KEPCO Research Institute has been researching a Superconducting Fault Current Limiter (SFCL) which is considered one of solutions of fault current problems with Korea Institute of Machinery & Materials (KIMM) and Hanyang University since 2011. In this paper, we fabricated a current limiting module and conducted electrical short circuit tests for checking the validity of the transmission level SFCL design. Based on the short circuit characteristics of the second generation High Temperature Superconductor (HTS), we analyzed the short circuit characteristics of 3 parallel connected superconducting wires. The structure of the HTS wire is as follows: the stainless steel stabilizer of $100{\mu}m$ is laminated on the superconductor layer and under the substrate, both of which are electrically jointed with solder. We fabricated the current limiting module which has 40 series and 6 parallel connections and studied the short circuit characteristics of the module under various voltage levels.

30(kVA) 초전도발전기 제작 및 특성 (Fabrication and Characteristics of 30〔kVA〕 Superconducting Generator)

  • 손명환;권영길;백승규;박도영;이언용;조영식;류강식
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제3권2호
    • /
    • pp.32-38
    • /
    • 2001
  • A 30[kVA] superconducting generator (SCG) is built and tested at Korea Electrotechnology Research Institute (KERI) in Korea. This superconducting generator has an air-gap winding instead of the typical steel teeth structure. The rotor has 4 field coils of race-track type with NbTi superconducting wired. The rotor is composed of two dampers and a liquid helium composed of two dampers and a liquid helium container in which the field poles reside. The space between the outermost damper and the container is vacuum insulated. A ferrofluid seal is used between the stationary part connected to the couping and the rotor. A helium transfer coupling(HTC) has 3 passages of the recovered heilum gas and a gas flow control system. The open circuit test and sustained short circuit test are preformed to obtain the open circuit characteristics (OCC) and short circuit characteristics (SCC) Also. the test results usder the light load (up to 3.6[kW]) are given. The structure, manufacturing and basis test of the 30[kVA]SCG are discussed.

  • PDF

회전기의 기여에 의한 시변성의 순간전압강하 예측에 관한 연구 (Investigation of the Estimation of Time-Varying Voltage Sags Considering the Short Circuit Contributions of Rotating Machines)

  • 윤상윤
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권6호
    • /
    • pp.315-322
    • /
    • 2005
  • In this article, 1 would like to explore the estimation method of time-varying voltage sags in large industrial systems considering the short circuit contributions of rotating machines. For the power distribution system of KEPCO(Korea Electric Power Corporation), the magnitude of initial symmetrical short circuit current is generally not changed. However, in industrial systems which contain a number of rotating machines, the magnitude of voltage sag is generally changed from the initial to the clearing time of a fault due to the decreasing contribution of rotating machines for a fault current. The time-varying characteristics of voltage sags can be calculated using a short circuit analysis that is considered the time-varying fault currents. For this, the prediction formulations of time-varying voltage sags are proposed using a foreign standard. The proposed method contains the consideration of generator and motor effects. For the test of proposed formulations, a simple system of industrial consumer is used for the comparison conventional and proposed estimation method of voltage sag characteristics.

Weil-Dobke 합성단락 시험회로의 Parameter 분석과 최적화 (Analysis and optimization of Wiel-Dobke synthetic testing circuit parameters)

  • 김맹현;류형기;박종화;고희석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.623-627
    • /
    • 1995
  • This paper describes analysis and optimization of Weil-Dobke synthetic testing circuit parameters, which is efficient and economical test method in high capacity AC circuit breaker. In this paper, analysis of synthetic short-circuit test circuit parameter proposed nondimensional factor that is reciprocal comparison value of circuit parameter and is not related to rated of circuit breaker, in particular, this study induce minimization of required energy of critical TRV generation specified in IEC 56 standards and present optimal design of synthetic short circuit testing facilities.

  • PDF

대용량(50kA)의 Making Switch와 Back Up Breaker 접점 개발에 따른 검증시험의 연구 (The Study of the Verification Test for Development of Contacts(50kA) of Making Switch and Back Up Breaker)

  • 김선구;김원만;나대열;노창일;이동준;정흥수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.842-844
    • /
    • 2004
  • The Back Up Breaker and Making Switch are very important equipments for the short circuit test facility, and contacts are the most important parts of the above switches. There are very many kind of contacts according to switches characteristic and should be done the verification test before use, especially development contacts. This study describes the class of switches, arc chute, material of whole contacts and essential test for verification. The essential test for verification are dielectric test, mechanical operation test, short-time withstand current test, load current breaking test, and short-circuit making current test etc.

  • PDF