• 제목/요약/키워드: Series system

검색결과 5,722건 처리시간 0.034초

8200호대 전기기관차 주변환장치 LCC 비교 분석 (Life Cycle Cost Comparative Analysis for Main Conversion System in 8200 Series Electric Locomotive)

  • 김완일;창윤우;김동만;김재문
    • 전기학회논문지
    • /
    • 제67권12호
    • /
    • pp.1717-1722
    • /
    • 2018
  • Parts and units of 8200 series electric locomotive are aging, but and source technology is not secured. As a results, maintenance costs are increasing steadily due to using expensive substitute parts. Therefore, various studies have been conducted to reduce maintenance costs. In this paper, the life cycle cost(LCC) of the developed and conventional products were compared and analyzed about main conversion system in 8200 Series electric locomotive. As a result of analysis, the material cost was the highest in the conventional product among the various item costs. On the other hand, it is confirmed that preventive cost was the highest among the costs about the developed product.

State estimation based on fuzzy state transition model

  • Hanazaki, Izumi;Saguchi, Shinichi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1993년도 한국자동제어학술회의논문집(국제학술편); Seoul National University, Seoul; 20-22 Oct. 1993
    • /
    • pp.18-23
    • /
    • 1993
  • In this paper, we attempt to estimate the state of a finite state system. In such system, we can observe time series data which has some significant behaviors corresponding to its system states. The behavior is characterized by feature parameters extracted from time series. Our thought is that the system output time series data is expressed as a sequence of behavior patterns which are represented by clusters in feature parameters space. An algorithm jointing fuzzy clustering to fuzzy finite state transition model is suggested.

  • PDF

Reliability for Series System in Bivariate Weibull Model under Bivariate Type I Censorship

  • Cho, Jang-Sik;Cho, Kil-Ho
    • Journal of the Korean Data and Information Science Society
    • /
    • 제14권3호
    • /
    • pp.571-578
    • /
    • 2003
  • In this paper, we consider two components system which have bivariate weibull model with bivariate type I censored data. We proposed maximum likelihood estimator and relative frequency estimator for the reliability of series system. Also, we construct approximate confidence intervals for the reliability based on the two proposed estimators. And we present a numerical study.

  • PDF

직렬 피이드백 보상기를 이용한 위치제어 유압시스템의 성능향상에 관한 연구 (A study on the performance improvement of hydraulic position control system using series-feedback compensator)

  • 이교일;이종극
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1988년도 한국자동제어학술회의논문집(국내학술편); 한국전력공사연수원, 서울; 21-22 Oct. 1988
    • /
    • pp.332-337
    • /
    • 1988
  • A digital series-feedback compensator algorithm for tracking time-varying signal is presented. The series-feedback compensator is composed of one closed loop pole / zero cancellation compensator and one desired-input generator. This algorithm is applied to nonlinear hydraulic position control system. The hydraulic servo system is modelled as a second order linear model and cancellation compensator is modelled from it. The desired input generator is inserted to reduce modelling error. Digital computer simulation output using this control method is present and the usefulness of this control algorithm for nonlinear hydraulic system is verified.

  • PDF

Reliability for Series System in Bivariate Weibull Model under Bivariate Random Censorship

  • Cho, Jang-Sik
    • Journal of the Korean Data and Information Science Society
    • /
    • 제15권1호
    • /
    • pp.219-226
    • /
    • 2004
  • In this paper, we consider two-components system which the lifetimes have a bivariate Weibull distribution with bivariate random censored data. Here the bivariate censoring times are independent of the lifetimes of the components. We obtain estimators and approximated confidence intervals for the reliability of series system based on likelihood function and relative frequency, respectively. Also we present a numerical study.

  • PDF

시스템의 신뢰성(信賴性) 예측(豫測)을 위한 컴퓨터 프로그램 (A Computer Program for System Reliability Prediction)

  • 김영휘;최문기
    • 대한산업공학회지
    • /
    • 제1권2호
    • /
    • pp.51-56
    • /
    • 1975
  • A computer program for computing complex system reliability is described. The program is composed of three phases : Phase I program reduces all series, parallel and series-parallel components and subsequently obtains an irreducible non-series-parallel system. Phase II program enumerates all the possible paths from the source to the sink of the graph. Phase III program then computes system reliability based on the information obtained by the Phase II program. The program is based on a modified version of the algorithm published in [6]. An example of the use of the computer program is given.

  • PDF

8200호대 전기기관차 주변환장치 LCC 분석 (Life Cycle Cost Analysis of Main Conversion System in 8200 Series Electric Locomotive)

  • 김완일;이계승;최종록;김재문
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1830-1835
    • /
    • 2017
  • 8200 Series Electric Locomotives are mostly imported from overseas due to aging and uncertainty of source technology, and it's the maintenance cost is increasing. We are analyzed life cycle costs based on international standards such as IEC 60300-3-3 and IEC62278. The main conversion system of the 8200 series electric locomotive is closely related to vehicle operation and is one of the subsystems requiring frequent maintenance. In this paper, the life cycle cost of the main conversion unit in 8200 series electric locomotive is analyzed based on the maintenance manual. As a result of analysis, maintenance cost of GTO module and control device is relatively high, and it is confirmed that the cost increases according to the useful life.

Simplified Control Scheme of Unified Power Quality Conditioner based on Three-phase Three-level (NPC) inverter to Mitigate Current Source Harmonics and Compensate All Voltage Disturbances

  • Salim, Chennai;Toufik, Benchouia Mohamed
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권3호
    • /
    • pp.544-558
    • /
    • 2013
  • This paper proposes a simplified and efficient control scheme for Unified Power Quality Conditioner (UPQC) based on three-level (NPC) inverter capable to mitigate source current harmonics and compensate all voltage disturbances perturbations such us, voltage sags, swells, unbalances and harmonics. The UPQC is designed by the integration of series and shunt active filters (AFs) sharing a common dc bus capacitor. The dc voltage is maintained constant using proportional integral voltage controller. The shunt and series AF are designed using a three-phase three-level (NPC) inverter. The synchronous reference frame (SRF) theory is used to get the reference signals for shunt and the power reactive theory (PQ) for a series APFs. The reference signals for the shunt and series APF are derived from the control algorithm and sensed signals are injected in tow controllers to generate switching signals for series and shunt APFs. The performance of proposed UPQC system is evaluated in terms of power factor correction and mitigation of voltage, current harmonics and all voltage disturbances compensation in three-phase, three-wire power system using MATLAB-Simulink software and SimPowerSystem Toolbox. The simulation results demonstrate that the proposed UPQC system can improve the power quality at the common connection point of the non-linear load.

가변 위상변위 스위칭방식을 적용한 연료전지용 변압기 직렬형 DC/DC 컨버터 (Series Connected DC/DC Converter for Fuel Cell System using Variable Phase Shift Switching Method)

  • 박노식;권순재;박성준
    • 전력전자학회논문지
    • /
    • 제13권6호
    • /
    • pp.461-468
    • /
    • 2008
  • 본 논문에서는 연료전지용 전력변환 장치에서 높은 승압비를 구현하기 위하여 절연형 풀브릿지 컨버터의 고주파 변압기 2차측을 직렬로 연결한 새로운 DC/DC 컨버터와 이에 적합한 가변 위상변위 스위칭 방식을 제안하였다. 제안된 컨버터는 기존 방식에 비해 정류부와 필터부의 일원화가 가능한 구조로 출력레벨의 증가를 위해 컨버터의 수를 증가 하더라도, 수동소자의 수를 대폭 줄일 수 있다. 제안된 직렬 방식의 컨버터의 출력전압은 기존의 일정위상변위 스위칭 방식으로는 극성이 반대로 되는 구간이 발생하므로, 제안된 전력변환기에 적합한 간단한 가변 위상 변위 스위칭 방식을 적용함으로써, 출력전압의 감소문제를 해결하였으며, 시뮬레이션과 실험을 통하여 제안된 방식의 타당성을 검증하였다.

옥천대(沃川帶)의 지질(地質) 및 광물자원(鑛物資源)에 관(關)한 연구(硏究) -제천남부(堤川南部)의 옥천계(沃川系)의 조선계(朝鮮系)의 경계(境界) 및 부근(附近)의 지질(地質)- (Geology and Mineral Resources of the Okchǒn Zone-The Boundary between the Okchǒn and Chosǒn Systems in the South of Jechǒn, and the Geology in its Vicinity-)

  • 김옥준;민경덕;김규한
    • 자원환경지질
    • /
    • 제19권3호
    • /
    • pp.225-230
    • /
    • 1986
  • Various interpretations on the boundary between the $Okch{\check{o}}n$ system and the Great Limestone series of the $Chos{\check{o}}n$ system, and on the geologic structure and stratigraphy of the $Okch{\check{o}}n$ system have been yielded by the previous studies, and they are still in hot debate. The present work has mainly studied on the boundary between the $Okch{\check{o}}n$ and $Chos{\check{o}}n$ systems in the south of $Jech{\check{o}}n$, and the geology in its vicinity to clarify the previous misinterpretations if any on the geologic structure and in trun stratigraphy of the area concerned. The boundary between the $Okch{\check{o}}n$ system and the Great Limestone series of the $Chos{\check{o}}n$ system has been thought to be (1) gradational relation which means two systems are the same formation, (2) unconformable relation in which the $Okch{\check{o}}n$ system overlies the $Chos{\check{o}}n$ system, (3) unconformable relation in which the $Chos{\check{o}}n$ system overlies the Okchon system indicating that the age of the $Okch{\check{o}}n$ system is Precambrian, and (4) fault contact in which the $Okch{\check{o}}n$ system of Precambrian age comes in contact with the $Chos{\check{o}}n$ system of Cambro-Ordovician age. The present study clearly found that the relationship between the two systems is a fault zone contact. Shear zone of a width of 300 to 400m is developed, and andesitic volcanics and basic dikes are intruded along the fault zone. This fault contact is exactly the north extension of the Bonghwajae fault, which was denominated long time ago by two of the present authors. The eastern side of the fault has been uplifted so that the $S{\check{o}}changri$ formation of the $Okch{\check{o}}n$ system cropped out in the zone of the Great Limestone series. All the previous workers thought that the $S{\check{o}}changri$ formation rests on the Great Limestone series, but the present study found an overthrust having a strike of $N8^{\circ}E$ and dip of $30^{\circ}NW$ between them, and the $S{\check{o}}changri$ formation has thrusted over the Great Limestone series at the central part of the study area. In the southern and northern parts of this uplifted $S{\check{o}}changri$ formation, the Great Limestone series rests unconformably on it. In the eastern part of the study area where the Mt. Dangdu is located and the previous workers thought that the $S{\check{o}}changri$ formation rests on the Great Limestone series, Precambrian basement rock whose age is older than 1720+50 m.y. crops out in the northern part of the east-west trending high angle fault, and the Great Limestone series rests unconformably on the basement.

  • PDF