Life Cycle Cost Comparative Analysis for Main Conversion System in 8200 Series Electric Locomotive |
Kim, Wan-il
(Dept. of Transportation Policy Transportation System Engineering, Korea National University of Transportation)
Chang, Yoon-Woo (Dept. of Transportation System Engineering, Korea National University of Transportation) Kim, Dong-Man (Dept. of Transportation Policy Transportation System Engineering, Korea National University of Transportation) Kim, Jae-Moon (Dept. of Transportation System Engineering, Graduate School of Transportation, Korea National University of Transportation) |
1 | W.I. Kim, K.S. Lee, J.R. Choi, J.M. Kim, "Life Cycle Cost Analysis of Main Conversion System in 8200 Series Electric Locomotive", KIEE, Vol. 66, No. 12, pp. 1830-1835, 2017 |
2 | J.K. Lee, S.M. Chae, Y.H. Lee, "A Study on Localization Development for 8200 Series Electric Locomotives", The Korean Society for Railway Conference, pp. 707-710, 2014 |
3 | K.S. Lee, "Life Cycle Cost Analysis of Auxiliary Power Unit for 8200 Series Electric Locomotive Based on Reliability", Master Thesis, 2018 |
4 | "Maintenance Manual 8200 Series Electric Locomotive (LI-3, 8, GI-3, 6, 9, 10)", KORAIL |