• Title/Summary/Keyword: Seoul metro

Search Result 359, Processing Time 0.026 seconds

A Study on the analysis about the power density according to the structural forms of the urban railway stations (도시철도 정거장의 구조형태에 따른 전력원단위 분석에 관한 연구)

  • Jung, Hyun-Ki;Kim, Se-Dong;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.42-47
    • /
    • 2014
  • The urban railway station is a structure that consumes a large amount of electric energy. Thus, the rationalization of using electric power is acutely demanded, but statistical data and design criteria that consider operating power load characteristics and structures, are very insufficiency. Therefore, this study investigated and analyzed that electricity consumption a year, characteristics, gross floor area of the station, structure, and etc, on the basis of Seoul metro station 1~4 line. Through regression analysis theory, we verified the overall features and the main tendency by analysis of specific parameter value(average, maximum, minimum, etc). The object of this study is the analysis about power density considering structure of the urban railway station, managing electric energy for the rationalization and setting a new standard of maintenance and construction.

The Development of DCU for the Platform Screen Door (승강장 스크린 도어용 제어장치의 개발)

  • Woo, Chun-Hee;Kim, Jin-Sik
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.2
    • /
    • pp.68-71
    • /
    • 2011
  • In the case of Seoul Metro, prior to installation of platform screen doors, had seen 4~6 cases a month of mortal injuries from accidents on the platforms, including suicide attempts towards the oncoming train. However, since the installation of platform screen doors, Seoul Metro has achieved a feat of '0 mortal injuries'. In the initial stages of introducing platform screen doors domestically, due to a lack of experience in controlling platform screen doors, the products were imported and installed through technical cooperations from Japan, France and the United States. Thereafter, following investments in technologies by domestic firms, domestic production of parts such as overall control mechanism, specific control mechanism, RF devices and others were achieved. However, having installed platform screen doors in a relatively short period of time, DCU(Door Control Unit), an integral part of the whole platform screen door system, is yet to be fully domestically produced. At this moment in time, installation is being done with imported products or DCUs developed with DC motors. In this research, advantages and disadvantages of DC and BLDC motors for use in DCU will be analyzed and will produce an own BLDC controlling unit in order to solve any problems arised. Furthermore, the BLDC controlling unit produced will be integrated with DCU to improve the performance of the product and its price competitiveness.

A Study on the Wearing Phenomenon of Pantograph Slider for the SEOUL METRO Line 4 Rail Vehicles (4호선 전동차 판토그라프 주습판 마모현상에 관한 연구)

  • Kim, Young-Gyu;Yang, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.51-56
    • /
    • 2007
  • Pantograph of the electric train is the important part receiving current by adhereing contact wire. Wearing rate of pantograph or contact wire is changed by the type of pantograph and material of adhering part. In special, the weather influences the relative wearing rate and wearing type of pantograph Slider and Contact wire with steep wearing in arc and life cycle of pantograph slider. Presently, the weather causes side-wearing and over-wearing of pantograph slide installed in electric train. So it is difficult to manage and operate the electric train. Although the quality of slide using in line4 vehicle was finished the test in line 2 vehicle experimentally, it has to apply after pantograph is installed in some electric trains and check the influence in it and contact wire. It is because line4 section is very different from line2 section. Experimental application is the sequence to certify the safety and abrasion resistance importantly by enlarging experimental application with increase of the experimental electric train. The lenth of line4 in Seoul Metro is 71.5[km]. It is long section. The line is mixed DC 1,500[V] section and AC 25,000[V] section. It has underground section of 41.5[km] and ground section of 30[km]. Ground section is about 42% and receives much influence in the rain during the rainy season. After experimental application we found that this pantograph slide has twice as much abrasion resistance despite a little deviation and found the occurrence probability of arc and side-wearing is decreased considerably.

  • PDF

Case of Application of Rail Temperature Detector for Track Management (궤도 관리를 위한 레일온도검지장치 설치 사례)

  • Chung, Sung-Hyun;Shin, Gil-Cheol;Kim, Gil-Soo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1362-1369
    • /
    • 2007
  • Seoul Metro continuously converted the standard rail into continuous welded rail since the later part of 1990's, and currently, most of the sectors of the Seoul Metro are continuous welded rails. As the continuous welded rail is inhibited by the contraction and expansion force of the rail as well as rail-bed, this force is stored as the internal stress of the rail with the exception of portion of the both ends of the continuous welded rail. If the contraction and expansion of the rail is restricted, the internal stress, that is, the force in the direction of the axis, is proportional to the cross-sectional area of the rail. Therefore, with regards to the temperature changes, the internal stress changes in accordance with the type of rail, bolting apparatus, railroad tie and rail-bed. As such, the rail temperature becomes important data in securing the gap at the adjoining section of the rail in the standard rail section, and to determine the setting temperature for the continuous welded rail. In addition, it becomes basic data for maintenance of the track. Accordingly, this thesis introduces cases of installation of rail temperature detector in order to prevent and manage track defectiveness due to increase in rail temperature, and to utilize as basic data at the time of various construction and maintenance. Furthermore, this thesis aims to assist maintenance of track through systematic temperature management in the future by looking into means of its utilization.

  • PDF

Development of Station Dwelling Time Estimation Model for Seoul Metro Line No. 4 (도시철도 정차시간 분석을 통한 모형식 개발에 관한 연구 (서울시 도시철도 4호선을 중심으로))

  • Park, Jeong-Su;Sin, Dong-Hui;Won, Je-Mu
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.147-156
    • /
    • 2006
  • Metropolitan Subway, tke volume of station, distance between station is short. when the demand is concentrated during moving peak periods, the Headway that than Line Headway in which Station Headway is applied to Station Capacity computation be. The factors to determine the Station Headway have a fixing Price of the machine and the Dwell time. Other factors aye decided already or fixing price but the Dwell time that change according to demand cause the biggest effect at Station Headway. After analyze constituents that influence to Station Headway in this study calculated correct Station Capacity drawing estimating dwell time model that change according to demand.

Express Train Choice and Load Factor Analysis as Line Extension in Seoul Metro 9 (서울지하철 9호선 2단계 개통에 따른 급행열차 선택 및 혼잡도 변화분석)

  • Kim, Kyung Min;Oh, Suk Mun;Rho, Hag Lae
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.663-671
    • /
    • 2016
  • This paper investigates how to change passengers' preferences for express trains according to line extension in Seoul Metro Line 9. Before-and-after line extension, we traced passengers' path choices using Smart Card data via the method suggested by Kim et al. (2015). We developed two multinomial logit models before-and-after line extension. Transferability test showed that there is no difference between the two models. However, the load factor of the express train increased by 6.7% and the gap between the local and express trains became significantly wider.

Pre-study for the improvement of air filtration performance in the air handling unit of subway station (도시철도 지하역사 공기조화기의 미세먼지 저감성능 개선을 위한 사전연구)

  • Kang, Joong-Goo;Shin, Chang-Heon;Bae, Sung-Joon;Kwon, Soon-Bark;Kim, Se-Young;Han, Seok-Yoon
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.541-545
    • /
    • 2008
  • Particulate matter (PM) is one of the major indoor air pollutants especially in the subway station in Korea. In order to remove PM in the subway station, several kinds of PM removal system such as roll-filter, auto-washable air filter, demister, and electrostatic precipitator re used in the air handling unit (AHU) of subway station. However, those systems are faced to operation and maintenance problems since the filter-regeneration unit consisting of electrical or water jet parts is malfunctioned due to the high load of particulates and the filter material needs periodic replacement. In this study, we surveyed the particle removal systems in order to develop the new system of particle removing can be adopted in the current AHU of subway station.

  • PDF

Change analysis with A.C of D.C electric railway (직류 전기철도의 교류화 분석)

  • Kim, Youn-Sik;Lee, Gi-Seung;Sim, Jae-Suk
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.151-156
    • /
    • 2008
  • The after 1974 capital region electric railroad is opened to traffic Koraill and Seoul metro adopt each other different power supply method and they operate and they are come. AC 25[kv] method voltage the insulation becomes larger standing distance highly, the case tunnel section which will introduce in the underground segment becomes on a large scale and the cost of construction increases to the city center and the underground segment adoption of DC method was many. To recent times with R-bar (Rigid-bar) introductions change of tunnel section the introduction of AC method came to be easy without in the underground segment. Operates sees in the electric protection where the Seoul metro and the Korail are different each other and, from the dead section segment the interior electric light to put out lights the passenger brings about inconveniently and the civil appeal which demands a power supply method unification occurs, within the company interchange electric railroad brazier safety improvement and maintenance expense curtailment etc. the flaw is original proposal, is a condition which finishes a feasibility study service about the power supply method fringe land. Interchange analysis of the DC electric railway it leads from the present paper and it compares under analyzing being it could be reflected to also the route which is in the process of actual using boil the strong point and a weak point of DC and AC method of the establishment route constructive at the time of and

  • PDF

Analysis of Catchment Area of Seoul Metropolitan Express Train (수도권 광역급행철도 도입에 따른 철도역 영향권 산정 연구)

  • Lee, Jang-Ho;Lee, Inhee;Jin, Woo-Jeong
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.49-60
    • /
    • 2014
  • For the demand analysis of Metropolitan Train Express project, the catchment area of station should be reevaluated considering the journey speed of it. In this paper, we estimated travel mode choice model using stated preference data including Seoul metropolitan express train and compared the parameters of access/egress travel time between existing metro and Seoul metropolitan express train. The parameter of Seoul metropolitan express train is 2.5 times smaller than that of existing metro. Consequently, the catchment area can be expanded in same proportion. It can be concluded that the result of demand forecasting can be increased by 10% accommodating the expanded catchment area.

Signalling system switch-over and Interoperability implementation without Suspension of the Train service (Seoul Line No.2 Signalling system refurbishment) (열차 운행의 중단없는 신호시스템 절체 및 병행운전 구현 (서울 2 호선 신호설비 개량))

  • Lee Jung-Won;Lee Jong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.976-981
    • /
    • 2005
  • The Seoul subway line No.2 is the one of the busiest metro service line of the passenger transportation in Seoul metropolitan city. The number of the passengers served by the Seoul subway line No.2 is more than 1.9 million in a day according to the transportation reference of 2004, which is about $15\%$ of the whole population in Seoul metropolitan city. This is the reason why the Seoul Metropolitan Subway Corporation(SMSC) is implementing the refurbishment of the current ATS signalling system of Seoul Line No.2 into the most advanced ATO system with the continuous air-gap telegram transmission through the track circuit without any suspension of the train service either in when or in where, which is the first in the world in its attempt to refurbish the old signalling system under service without any suspension of the train operation.

  • PDF