• Title/Summary/Keyword: Scheduling System

Search Result 2,161, Processing Time 0.028 seconds

Opportunistic Scheduling and Power Control for Cross-Layer Design of Ad Hoc Networks (Ad Hoc네트워크의 Cross-Layer설계를 위한 Opportunistic Scheduling과 Power Control기법)

  • Casaquite Reizel;Ham Byung-Woon;Hwang Won-Joo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.9A
    • /
    • pp.856-867
    • /
    • 2006
  • This paper proposes a new algorithm for opportunistic scheduling that take advantage of both multiuser diversity and power control. Motivated by the multicast RTS and priority-based CTS mechanism of OSMA protocol, we propose an opportunistic packet scheduling with power control scheme based on IEEE 802.11 MAC protocol. The scheduling scheme chooses the best candidate receiver for transmission by considering the SINR at the nodes. This mechanism ensures that the transmission would be successful. The power control algorithm on the other hand, helps reduce interference between links and could maximize spatial reuse of the bandwidth. We then formulate a convex optimization problem for minimizing power consumption and maximizing net utility of the system. We showed that if a transmission power vector satisfying the maximum transmission power and SINR constraints of all nodes exist, then there exists an optimal solution that minimizes overall transmission power and maximizes utility of the system.

Production Scheduling using Overtime (잔업을 고려한 생산 스케쥴링)

  • 민병도;임석철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.197-205
    • /
    • 1997
  • Manufacturers can meet the due dates of orders by using overtime, in which case, additional cost incurs for the amount of overtime. Although many studies have been reported on scheduling, only a few papers are founds on production scheduling using overtime. We consider the problem of production scheduling using overtime on a single machine, in which each job has a given due-date, a constant processing time. We assume that the daily overtime does not exceed the daily regular operation time. The objectives is to minimize the total overtimes, while meeting all due dates. We first present a mathematical model, and then suggest a heuristic algorithm for the problem.

  • PDF

Scheduling Computational Loads in Single Level Tree Network

  • Cui, Run;Sundaram, Suresh;Kim, Hyoung-Joong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2009.08a
    • /
    • pp.131-135
    • /
    • 2009
  • This paper is the introduction of our work on distributed load scheduling in single-level tree network. In this paper, we derive a new calculation model in single-level tree network and show a closed-form formulation of the time for computation system. There are so many examples of the application of this technology such as distributed database, biology computation on genus, grid computing, numerical computing, video and audio signal processing, etc.

  • PDF

A Hueristic Algorithm for Nonidentical Parallel Machines Scheduling (동일하지 않는 병렬기계 일정계획을 위한 휴리스틱 방법)

  • 전태웅;박해천
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.37-42
    • /
    • 2000
  • The parallel machines scheduling problems is one of the combinatorial optimization problems that often occurs in the real world. This problem is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. Not so much researches have been made on the case that nonidentical parallel machines scheduling problem. This study proposes Tabu Search methods for solving parallel machines scheduling problems related to due dates: minimizing mean tardiness, minimizing the number of tardy jobs, minimizing the maximum tardiness.

  • PDF

FUZZY Logic-Based Fast Gain Scheduling Control Using Fuzzy Preprocessor

  • Lee, Seon-Ho;Kim, Sung-Gyu;Zeungnam Bien
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1997.11a
    • /
    • pp.73-76
    • /
    • 1997
  • This paper proposes the fuzzy logic-based fast gain scheduling(FFGS) controller for regulation problem in nonlinear systems. It utilizes which reflects the derivative information on the original scheduling variable in order to achieve better performance than the existents. Moreover, we apply the proposed control scheme to control active suspension systems with nonlinear components.

  • PDF

A Time-fraction Based Scheduling Method for Downlink Transmissions in Wireless Network (이동무선 네트워크에서 하향링크 전송을 위한 시간비율 기반 스케줄링 기법에 관한 연구)

  • Soni, Samit;Paik, Chun-Hyun
    • Korean Management Science Review
    • /
    • v.24 no.1
    • /
    • pp.113-126
    • /
    • 2007
  • This paper deals with a mathematical approach for finding the time-fractions for the time-fraction based scheduling method in multimedia wireless networks. By introducing a constraint that regulates the performance fairness amongst users, we present a systematic method for harmonizing both the system and user performance. Numerical results show that the time-fraction based scheduling method reinforced with our scheme is very effective especially in multimedia environments.

Scheduling Algorithms with Transmit Power Constraint fer CDMA Packet Services

  • Minjoung Sheen;Lee, Seungbeom;Park, Sin-Chong
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1721-1723
    • /
    • 2002
  • In 3rd-generation mobile communication systems providing packet service, optimal scheduling algorithms we needed to increase service efficiency. In this paper, three scheduling algorithms (SP, EDF, and RPQ) which have been studied in the field of computer networks are applied with transmit power constraint to an interference-limited CDMA system, proving to be efficient.

  • PDF

A Study on the Lot Sizing and Scheduling in Process Industries (장치 산업에서 로트 크기와 작업 순서 결정을 위한 연구)

  • 이호일;김만식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.19
    • /
    • pp.79-88
    • /
    • 1989
  • This characteristics of process industries are high capital intensity, relatively long and sequence dependent setup times, and extremely limited capacity resources. The lot sizing, sequencing and limited capacity resources factors must he considered for production scheduling in these industries. This paper presents a mixed integer programming model for production scheduling. The economic trade offs between capacitated lot sizing flow shop scheduling and sequence dependent setup times also be compared with SMITH-DANIELS's model. As a results, it is shown that this paper has lower total cost, more efficient throughput than SMITH-DANIELS's model.

  • PDF

A QoS-aware Scheduling Algorithm for Multiuser Diversity MIMO-OFDM System (다중 사용자 MIMO-OFDM 시스템에서의 QoS 제공을 위한 스케줄링 기법)

  • An Se-Hyun;Yoo Myung-Sik
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.7A
    • /
    • pp.717-724
    • /
    • 2006
  • In order to maximize the throughput and provide the fairness between users in MIMO-OFDM system, FATM(fairness-aware throughput maximization) scheduling algorithm was proposed. In this paper, a QoS-aware scheduling algorithms for MINO-OFDM system are proposed, each of which is based on FATM. These scheduling algorithms aim to satisfy the different service requirements of various service classes. Three proposed QoS scheduling algorithms called SPQ (Strict Priority Queueing), DCBQ (Delay Constraint Based Queuing), HDCBQ (Hybrid Delay Constraint Based Queuing) are compared through computer simulations. It is shown that HDCBQ algorithm outperforms other algorithms in satisfying different requirements of various service classes.

CFP Scheduling for Real-Time Service and Energy Efficiency in the Industrial Applications of IEEE 802.15.4

  • Ding, Yuemin;Hong, Seung Ho
    • Journal of Communications and Networks
    • /
    • v.15 no.1
    • /
    • pp.87-101
    • /
    • 2013
  • In industrial applications, sensor networks have to satisfy specified time requirements of exchanged messages. IEEE 802.15.4 defines the communication protocol of the physical and medium access control layers for wireless sensor networks, which support real-time transmission through guaranteed time slots (GTSs). In order to improve the performance of IEEE 802.15.4 in industrial applications, this paper proposes a new traffic scheduling algorithm for GTS. This algorithm concentrates on time-critical industrial periodic messages and determines the values of network and node parameters for GTS. It guarantees real-time requirements of periodic messages for industrial automation systems up to the order of tens to hundreds of milliseconds depending on the traffic condition of the network system. A series of simulation results are obtained to examine the validity of the scheduling algorithm proposed in this study. The simulation results show that this scheduling algorithm not only guarantees real-time requirements for periodic message but also improves the scalability, bandwidth utilization, and energy efficiency of the network with a slight modification of the existing IEEE 802.15.4 protocol.