A Study on the Lot Sizing and Scheduling in Process Industries

장치 산업에서 로트 크기와 작업 순서 결정을 위한 연구

  • 이호일 (한양대학교 산업공학과) ;
  • 김만식 (한양대학교 산업공학과)
  • Published : 1989.05.01

Abstract

This characteristics of process industries are high capital intensity, relatively long and sequence dependent setup times, and extremely limited capacity resources. The lot sizing, sequencing and limited capacity resources factors must he considered for production scheduling in these industries. This paper presents a mixed integer programming model for production scheduling. The economic trade offs between capacitated lot sizing flow shop scheduling and sequence dependent setup times also be compared with SMITH-DANIELS's model. As a results, it is shown that this paper has lower total cost, more efficient throughput than SMITH-DANIELS's model.

Keywords