• 제목/요약/키워드: Schedule delay risk

검색결과 26건 처리시간 0.031초

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 - (Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -)

  • 조규만;김태훈
    • 한국건축시공학회지
    • /
    • 제18권4호
    • /
    • pp.385-394
    • /
    • 2018
  • 오피스 건축물의 리모델링 사업에서, 신축과는 다른 리모델링 사업의 다양한 리스크로 인해 공기가 지연되는 사례가 빈번하게 보고되고 있다. 이에 본 연구에서는 리모델링 프로젝트의 리스크 요인들과 리모델링 공사의 작업별 공기지연 발생가능성의 관계를 분석하고자 수행되었다. 리모델링 사업의 경험이 있는 29명의 전문가 면담결과의 과학적 통계적 분석을 통해, 리모델링 사업의 리스크 요인과 그로 인한 작업별 공기지연 가능성을 크게 3가지 측면에서 분석하였다. 즉, (i) 리모델링 공사의 작업별 공기지연 가능성, (ii) 리모델링 공사의 리스크 요인별 중요도, (iii) 리모델링 공사의 공기지연에 영향을 미치는 리스크 요인 등 세가지 분석결과를 제시하였다.

공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화 (Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log)

  • 박종호;조민건;엄세호;박선규
    • 대한토목학회논문집
    • /
    • 제43권1호
    • /
    • pp.109-117
    • /
    • 2023
  • 건설공사에서의 공기지연은 공사금액 증가, 발주처 클레임, 무리한 공기단축에 따른 건설공사의 질 하락 등 건설프로젝트에 악영향을 끼치는 주요 리스크 요인이다. 기존 연구에서는 공기지연 리스크의 중요도 및 우선순위를 파악하고 중요도에 따라 공정을 관리하였으나, 공기지연 리스크의 심도는 데이터 수집의 한계 등으로 정량화 연구가 미흡하다. 따라서 본 연구에서는 BERT (Bidirectional Encoder Representations from Transformers) 언어 모델을 활용하여 비정형데이터로 저장된 공사일지의 작업내용을 분석 가능한 WBS (Work Breakdown Structure) 기반의 정형데이터로 변환하고 리스크 분류 및 도출 체계, 공정계획에 사용가능한 리스크 발생확률, 리스크 확률분포(심도)의 정량화 방안을 제시하였다. 제안된 프로세스를 고속도로공사 8개 공구에 적용하여, 39개 세부 공중 중 8개의 세부 공종에서 75건의 우천 공기지연 리스크를 도출하였다. K-S 검정을 통해 4개 공종에서 유의미한 확률분포를 도출하였으며 위험도를 비교하였다. 향후 본 연구에서 제시된 프로세스는 시공단계에서 발생하는 다양한 공기지연 요인의 도출 및 심도 정량화에 적용될 수 있을 것으로 기대된다.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도 (Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors)

  • 조규만;김태훈
    • 한국건설관리학회논문집
    • /
    • 제19권5호
    • /
    • pp.22-31
    • /
    • 2018
  • 리모델링 사업의 고유 리스크 요인들로 인해, 리모델링 사업의 실패가 빈번하게 발생하고 있는 실정이며 특히 공기지연이 거의 대부분의 리모델링 프로젝트에서 발생하고 있는 실정이다. 이러한 리모델링 프로젝트의 공기지연을 야기하는 리스크요인들이 모든 리모델링 프로젝트에 공통적으로 발생하는 것은 아니며, 해당 프로젝트의 다양한 특성에 따라 리스크 요인들의 발생가능성이 영향을 받게 된다. 이러한 맥락에서, 리모델링 프로젝트를 수행한 경험이 있는 29명의 현장관리자들을 대상으로 수행된 신뢰성 있는 설문조사 결과를 바탕으로, (1) 리모델링 프로젝트의 속성들이 리스크 요인의 발생에 얼마나 빈번하게 영향을 미치는지를 평가한 "프로젝트의 속성별 중요도"를 산정하였고, (2) 어떤 리스크 요인의 발생가능성이 가장 큰지를 평가한 "리모델링 사업의 공기지연 리스크 요인별 중요도" 그리고 (3) 이상의 두 가지를 혼합한, "각각의 리스크 요인의 발생에 영향을 미치는 프로젝트 속성별 영향도"를 분석하였다. 본 연구를 통하여, 리모델링을 고려하는 건축물의 다양한 특성들과 공기지연 리스크 발생가능성 사이의 관계를 다각적인 측면으로 분석하였고, 이를 통해, 리모델링을 계획하고 있는 발주자가 해당 프로젝트의 오피스의 특성에 따라 발생가능성이 높은 공기지연 리스크를 사전에 파악할 수 있을 것으로 기대된다.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF

착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안 (Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase)

  • 류한국;김선국;이현수
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.119-127
    • /
    • 2005
  • 최근의 건설시장 축소와 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화에 따라 건설 수주 경쟁은 더욱 치열해지고 있다. 그러나 건설공사는 공기지 연을 유발하는 수많은 공정리스크가 존재하고 있으며 이러한 공정리스크에 대한 인식과 그에 따른 체계적인 관리가 부진한 경우 건설공사의 경쟁력을 확보하는 데 여러 어려움이 존재한다. 이러한 문제점을 해결하기 위한 기존 연구는 공정리스크의 분류, 공정 리스크의 관리, 리스크 관리를 위한 시스템 개발에 치중하였다. 이에 본 연구는 전체 공정에 영향력이 크며, 위험발생 확률이 높은 철근콘크리트공사를 대상공종으로 선정하고 기존연구를 바탕으로 수차례의 전문가 면담과 난상토론을 실시하여 현실적인 리스크 요인과 관리방안을 제시하였다.

항공우주개발 프로젝트에서 개발기간과 비용에 대한 TRL의 영향 분석 (TRL Impact on Development Schedule and Cost in the Aerospace Project)

  • 황형원;김홍래;장영근
    • 한국항공우주학회지
    • /
    • 제40권3호
    • /
    • pp.264-272
    • /
    • 2012
  • 시스템개발 프로젝트에서 기술성숙도(TRL; Technology Readiness Level)는 개발기간과 비용에 직접적인 영향을 미친다. 만약 프로젝트 주관기관의 핵심기술요소(CTEs)에 대한 기술 성숙도를 정확히 평가하여, 그에 따른 개발기간과 일정의 영향 정도를 세밀히 분석한다면, 개발이 진행되는 과정에서 예산 추가와 일정 지연과 같은 위험을 최소화시킬 수 있다. 본 논문에서는 기술성숙도가 항공우주개발 프로젝트의 개발기간과 비용에 미치는 영향을 분석하고, 무인기시스템 개발사업에 적용하여 개발기관의 기술성숙도 수준 차이에 따른 개발기간과 비용의 정량적인 변화를 분석하였다.