1 |
DoD, "Defense Acquisition Guidebook", 2004.
|
2 |
DOE-EM, "Technology Readiness Assessment( TRA)/Technology Maturation Plan(TMP) Process Guide, pp.4-6, 2008.
|
3 |
GAO, "Best Practices-Better Management of Technology Development can Improve Weapon System Outcomes," GAO, USA.
|
4 |
Peisen, D. J., etc., "Case Studies: Time Required to Mature Aeronautic Technologies to Operational Readiness," Task Order 221, SAIC Report, Nov. 1999.
|
5 |
Malone, P., etc., "The Application of TRL Metrics to Existing Cost Prediction Models," IEEEAC Paper #1086, Version 3, Jan. 2011.
|
6 |
Dubos, G. F., etc., "Technology Readiness Level, Schedule Risk and Slippage in Spacecraft Design: Data Analysis and Modeling," AIAA SPACE 2007 Conference and Exposition, Long Beach, CA, Sep. 2007.
|
7 |
NASA, "NASA Cost Estimation Handbook", 2008.
|
8 |
과학기술통계서비스,http://sts.ntis.go.kr/ind ex.jsp.
|