• Title/Summary/Keyword: Safety case

Search Result 5,971, Processing Time 0.035 seconds

Confidence Improvement of Disposal Safety by Development of a Safety Case for High-Level Radioactive Waste Disposal (고준위방사성폐기물 처분 Safety Case 개발을 통한 처분안전성 신뢰도 향상)

  • Baik, Min Hoon;Ko, Nak-Youl;Jeong, Jongtae;Kim, Kyung-Su
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.4
    • /
    • pp.367-384
    • /
    • 2016
  • Many countries have developed a safety case suitable to their own countries in order to improve the confidence of disposal safety in deep geological disposal of high-level radioactive waste as well as to develop a disposal program and obtain its license. This study introduces and summarizes the meaning, necessity, and development process of the safety case for radioactive waste disposal. The disposal safety is also discussed in various aspects of the safety case. In addition, the status of safety case development in the foreign countries is briefly introduced for Switzerland, Japan, the United States of America, Sweden, and Finland. The strategy for the safety case development that is being developed by KAERI is also briefly introduced. Based on the safety case, we analyze the efforts necessary to improve confidence in disposal safety for high-level radioactive waste. Considering domestic situations, we propose and discuss some implementing methods for the improvement of disposal safety, such as construction of a reliable information database, understanding of processes related to safety, reduction of uncertainties in safety assessment, communication with stakeholders, and ensuring justice and transparency. This study will contribute to the understanding of the safety case for deep geological disposal and to improving confidence in disposal safety through the development of the safety case in Korea for the disposal of high-level radioactive waste.

A Case Study on Safety Case for the Verification of Railway Safety (철도시스템의 안전운영 검증을 위한 Safety Case 사례연구)

  • Kwak Sang-Log;Kim Sang-Ahm;Wang Jong-Bae;Cho Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.618-622
    • /
    • 2005
  • Railway safety case is an important measure for demonstrates operating company's capability, commitment and competence in accordance with Railway Regulation 2000 in UK. Safety case describes the scope of operation, definition and boundary of activity, risk analysis, system safety activity, annul safety plan. Relationships between' these components and company's policy, organization, human resource, control measure, investment plan are also included. A case study for Network Rail (infrastructure manager)'s safety case is described in this paper for the construction of safety rule and safety planning.

  • PDF

Analysis of Safety Assessment of Railway Signalling by Safety Case Documents (Safety Case 문서를 기반한 열차제어시스템 안전성 평가방법 분석)

  • Hwang, Jong-Gyu;Jo, Hyun-Jeong;Yoon, Yong-Ki;Kim, Yong-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1016-1022
    • /
    • 2007
  • It is demanded to produce the safety evidence documents in other to approval safety characteristic of railway signaling system which stands is included, it is demanding from IEC 62425 standards. Also it is express clearly that safety assessment if signaling system has to be verification of these safety evidence documents. This Safety Case has the results of safety activity through system life-cycle, such as hazard lists, hazard identification and analysis, risk assessment and countermeasure, verification and test results. Consequently, first of all, the analysis and verification of these Safety Case documents has to be accomplished to approval and acceptance of signaling system safety. And also if the safety assessor was want, it is able to be experimental test auditory which is, arbitrary faults injection test, to above described documents verification. In this paper, the contents and architecture of Safety Case are presented as first steps of safety assessment technology establishment for railway signaling system.

  • PDF

Risk Analysis for Installation Types of Pressure Safety Valve used in the High-pressure Gas Facility (고압가스 사용시설 내 안전밸브 설치유형별 리스크 분석)

  • Kim, Myung-Chul;Woo, Jeong-Jae;Lee, Hyung-Sub;Baek, Jong-Bae
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.129-136
    • /
    • 2017
  • This study investigated the probability of possible accident through qualitative and quantitative analysis of the pressure safety valve types installed in facilities using high pressure gas to compare the installation domestic and foreign pressure safety valve standards sought the safety characteristics and safety improvement direction accordingly. The three types are the case where the shut-off valve is not installed at the front of the PSV (Case A), If a shut-off valve is installed at the front of the PSV for inspection (Case B) and If a shut-off valve is installed in front of PSV (C.S.O), PSV is installed in parallel (Case C). Three types of cases were compared with FTA and HAZOP. The results of study of the possible accidents due to over-pressure safety valve installation type, used in a high-pressure gas facilities was shows in the following order Case B > Case A > Case C. The results of analysis through FTA was in order to protect the reservoir for the possible occurring of accident the safety valve installation is depend on its type. In the FTA analysis, defects in the device itself which attached to the storage tank as a substitute for analysis of the probability of operator mistakes was Case B with as high as $2.01{\times}10^{-6}$. Depending on the type of installation analysis of Case B in order to ensure safety is prohibited to install shut-off valve and believes that mandatory regulations are needed. Rationally installing of pressure safety valve in the high pressure using facilities will be expected to improve the industrial safety from severe accidents such as high-pressure gas fire explosion.

Reasoning Model of the Case-Based Construction Safety Management System (사례기반 건설안전 관리시스템의 추론 모형)

  • 예태곤;이재용;이현수
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.167-176
    • /
    • 1999
  • Construction accidents occur reiteratively in similar fashions. There have been several attempts to develop a safety program for preventing construction accidents on sites. It will be very effective to use previous accident cases for establishing proper safety plan and managing safety process. This research develops a case-based construction safety management system which enables construction managers or safety managers to prevent potential accidents during the construction process. The case-oriented approach is performed through the representation of previous accident cases in accordant with the similarity to the conditions of current site. It uses a case-based reasoning which is one of the reasoning methods of an expert system. A prototype system for the reasoning model was implemented using one of the case based system development tools. The system was applied to a real construction site to verify its capability and validity. It was founded that the causes of accidents were successfully removed, so the proposed model proved to be reasonable. Additional research is needed to resolve the technical problem how to adapt the countermeasures for accident prevention provided by the reasoning model.

  • PDF

Guideline on the Risk Assessment for Railway Safety Case (철도 Safety Case 작성을 위한 위험도평가 가이드라인)

  • Jung, Won;Wang, Jong-Bae;Park, Chan-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1255-1263
    • /
    • 2008
  • A Safety Case is an railway organization's formal arrangement, through the provision of policies, resources and processes, to ensure the safety of its work activity within safety management system. An effective system helps the organization to identify and manage risks effectively. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. The purpose of this research is to give how to the risk assessments are described within Railway Safety Cases can be prepared and maintained to meet the criteria specified by the upcoming railway regulations. Through this research, we propose the elements of safety management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.

  • PDF

Safety Case for AREX's E&M System (공항철도 기전시스템의 종합안전대책기술서)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

An Evaluation of Safety and Health Level in Chemical Laboratories

  • Lee, Keun-Won
    • International Journal of Safety
    • /
    • v.6 no.2
    • /
    • pp.33-37
    • /
    • 2007
  • In recent days, the accidents have happened at experimental laboratories in universities or institutes. In order to improve safety assurance of workers in laboratories, it is required to carry out systematic study concerned with evaluation of safety and health level. The safety and health inspection checklists were developed and conducted the case study. The case study was carried out laboratory safety inspection with 5 inspectors by the checklists to become aware of safety and health level. From the evaluation results of the inspection, we could be made quantification of laboratory through evaluation of safety and health level in laboratory. It was found that was recognized present states of the laboratory and established a plan for improvements in laboratory safety facilities from the case study. The safety inspection checklists can be used as basic data to establish evaluation criteria of safety and health level.

The Effectiveness of a Participatory Road Traffic Safety Education Program for the Elementary School Students (참여 중심 어린이 교통안전교육 프로그램 효과 평가)

  • Shon, Ju-Hyun;Lee, Myung-Sun
    • Korean Journal of Health Education and Promotion
    • /
    • v.27 no.1
    • /
    • pp.49-60
    • /
    • 2010
  • Objectives: The purpose was to evaluate the effectiveness of participatory road safety education program for the lower grade in elementary schools. This program was developed based on the Activated Health Education model. Methods: Study design was compromise experimental group pre-post design. 456 students in 8 schools were nonrandomly assigned to study group(n=224) or control(n=232). The students finished self-administered questionnaire before and after education. Collected data was analyzed by using the SPSS. Results: 1. The common relevant factors in road safety knowledge and attitude were 'residential state' and 'experience of traffic accident'. 2. The knowledge showed that the case and control scored at 6.48 and 6.41 points before. After this intervention, the case and control scored at 8.38 and 6.51. The difference of the case was significant(p<0.001). 3. The attitude showed that the case and control scored at 19.67 and 19.63 before. After this, the case and control scored at 19.86 and 19.63. The difference of the case was significant(p<0.05). Conclusion: In order to implement the road safety education, children's socio-demographic characteristics were considered. Because this education was effective in both improving knowledge and attitude and bringing interest, various participatory program will be applied in road safety education for children.

A study for Decision Method of Human Body Safety according to Power Load Fluctuation of the Chechon Area (제천지역 전력부하변동에 따른 인체 전 판단 방법에 대한 연구)

  • 김상철;김두현
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.69-77
    • /
    • 2000
  • This paper presents a study for decision method of human body safety according to power load fluctuation of the Chechon area. To cope with substantial electromagnetics analysis, the safety assessments were analyzed the double 154 [kV] T/L, 345 [kV] T/L, Chechon-Ichon, Chechon-Youngju, respectively. As the results of case study, in case of 345 [kV] T/L, the electric field value was 11.4927 [kV/m], magnetic field value was 0.4622 [G] at the point about 7 [m] away from the line in severest case. The results showed that the membership of a proposition fuzzy '11.4937 [kV/m] is hazardous' is 0.7063 for the severest case in case of 345 [kV] T/L. As the analytic results using the fuzzy qualifier term, the membership in case of very false is 0.0862 and fairly false is 0.5419, respectively.

  • PDF