• 제목/요약/키워드: Safety Inspections

검색결과 239건 처리시간 0.044초

고유동 충전재의 개발과 노후 터널의 배면공동 뒤채움에 관한 연구 (A Study on Development of the Controlled Low-Strength and High-Flowable Filling Material and Application of the Backfilling in Cavities behind the Old Tunnel Lining)

  • 마상준;서경원;배규진;안상철;임경하
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권3호
    • /
    • pp.177-184
    • /
    • 2002
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the cavities where exist behind the tunnel lining, through the tunnel safety inspections. These cavities were analysed to affect a stability of a running-tunnel seriously. This study is on the development of the controlled low-strength and flowable filling material which is able to apply to the cavity behind the tunnel lining. The major materials of backfilling developed are a crushed sand and a stone-dust which exists as a cake-state and is a by-product obtained in the producting process of aggregate. It is conformed with the design standard to the physical characteristics of backfilling. The backfilling material developed is designed to reduce the fair amount of cement. According to the designed compound ratio, it is carried out the laboratory tests such as a compressive strength and a chemical analyses and is applied to dilapidated old tunnel for an application assessment.

영상전류 측정을 이용한 부재수용가의 전기설비에 대한 안전확보 방안 (A Plan to Ensure Safety of Electrical Installation in Empty Houses by Measuring Zero Phase Current)

  • 임용배;배석명;김영석;박치현;김기현;조성원
    • 전기학회논문지P
    • /
    • 제55권4호
    • /
    • pp.196-201
    • /
    • 2006
  • A electrical fault that may generate an electrical disaster is defined as any abnormal condition caused by reduction in the insulation strength. To find out the abnormal condition, periodical inspections have being performed every 3 years. Recently, the number of empty houses during normal working hours is rising by dramatic increase in the number of nuclear families and double income families. To define the potential risk of the electric installation, measurement of zero phase current has been being considered. But the measured value could not be adapted to an absolute reference to the installation because the measured zero phase current value also contained capacitive leakage current. Therefore, in this paper, the correlation between the condition of the electrical installation and the zero phase current was analyzed. The result focuses on to detect them in a cost efficient way.

투수콘크리트 현장품질관리 지침서 개발에 관한 연구 (A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete)

  • 고은정;고은주;석호중;이승혁
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

석분을 이용한 터널 뒤채움용 경량기포 충전재의 개발과 현장적용에 대한 연구 (A Study on Development of Lightweight Foam Filling Material for the Voids behind Tunnel Liner using Stone-dust and Application to the Old Tunnel)

  • 마상준
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제7권4호
    • /
    • pp.139-147
    • /
    • 2003
  • 국내 재래식 터널의 대부분에 존재하는 배면공동은 라이닝의 균열, 누수, 응력집중 등을 유발하여 터널 안정성에 큰 영향을 미치게 된다. 이러한 배면공동의 보강은 공동을 뒤채움하는 방법이 일반적으로 적용되고 있는데, 본 연구에서는 현재 산업폐기물로 취급되어 버려지고 있는 석분토를 이용하여 터널 뒤채움용 경량기포 충전재를 개발하였고, 실내물성시험과 노후터널에 대한 현장적용시험을 수행하여 개발 충전재의 적용성 평가를 실시하였다.

A Study on the Fire Safety of High-rise Apartments Based on Fire Door Switch and Automatic Fire Extinguishing System

  • Zhang, ZeChen;Kong, Ha-Sung
    • International Journal of Advanced Culture Technology
    • /
    • 제9권4호
    • /
    • pp.424-430
    • /
    • 2021
  • The purpose of this study is to analyse the characteristics and spreading laws of parameters such as fire smoke, concentration of CO, visibility, and temperature at fire scene in high-rise residential buildings under the different conditions of fire doors and automatic fire extinguishing systems. Using Pyrosim to simulate diverse fire scenes in a high-rise apartment with corridors, to analyze the changes in those parameters. The results show that when a fire occurs, closing the fire-fighting corridor will increase the smoke temperature and concentration of CO in the stairwell, and reduce the height and visibility of the smoke layer; the automatic fire extinguishing system effectively suppresses the increase in the temperature of the fire smoke and the sedimentation of the smoke layer. Reasonable setting and operation of the automatic fire extinguishing system could effectively inhibit the spread of fire. Although closing fire corridor can slow down the direct upward spread of smoke through the corridor, it will force the fire smoke into the stairwell, which will seriously affect evacuation through the stairs. Therefore, in order to reduce risks, it is forbidden to close the fire doors of the firefighting corridor and stacking combustible materials in the corridor, Also, intensifying inspections and ensuring the normal operation of the automatic fire extinguishing system are indispensable. Based on the research results, the significance of installing fire-fighting facilities in the construction of high-rise apartments was discussed and proved.

BIM model-based structural damage localization using visual-inertial odometry

  • Junyeon Chung;Kiyoung Kim;Hoon Sohn
    • Smart Structures and Systems
    • /
    • 제31권6호
    • /
    • pp.561-571
    • /
    • 2023
  • Ensuring the safety of a structure necessitates that repairs are carried out based on accurate inspections and records of damage information. Traditional methods of recording damage rely on individual paper-based documents, making it challenging for inspectors to accurately record damage locations and track chronological changes. Recent research has suggested the adoption of building information modeling (BIM) to record detailed damage information; however, localizing damages on a BIM model can be time-consuming. To overcome this limitation, this study proposes a method to automatically localize damages on a BIM model in real-time, utilizing consecutive images and measurements from an inertial measurement unit in close proximity to damages. The proposed method employs a visual-inertial odometry algorithm to estimate the camera pose, detect damages, and compute the damage location in the coordinate of a prebuilt BIM model. The feasibility and effectiveness of the proposed method were validated through an experiment conducted on a campus building. Results revealed that the proposed method successfully localized damages on the BIM model in real-time, with a root mean square error of 6.6 cm.

상태평가와 내하성능평가를 통한 소규모 노후교량의 유지관리 적정성 분석 (Analysis of Appropriateness for Maintenance of Aged Small Bridges based on Condition and Load Carrying Capacity Evaluation)

  • 이후석;노화성;선종완;박경훈
    • 한국산학기술학회논문지
    • /
    • 제20권2호
    • /
    • pp.59-66
    • /
    • 2019
  • 현재 시설물 안전 및 유지관리에 관한 특별법에 의하면 소규모 교량은 육안점검 위주의 정기점검만 실시하고 있다. 특히 공용년수 30년 이상의 교량은 노후화에 따라 개축여부에 관한 의사결정이 필요하지만 외관상태만으로 결정해야 하는 상황이 발생하여 안전적인 유지관리의 측면에서 미흡한 부분이 있다. 본 논문에서는 기존의 교량 점검시 사각지대에 있는 일반국도의 공용년수 30년 이상의 소규모 노후교량 12개소에 대해서 육안점검을 통한 상태평가와 차량재하실험을 통한 내하성능평가를 수행하였다. 정기적인 내하성능평가를 수행하지 못하는 소규모 교량들에 대해서 육안점검을 통해 결정된 상태등급과 교량의 내하성능평가 결과를 비교하여 개축 여부 의사결정과 관련된 유지관리의 적정성을 검토하였다. 검토결과 대상 교량 중 2개소가 상태평가 결과 안전에 이상이 없는 것으로 나타났으나 내하력이 부족한 것으로 나타났다. 이것은 육안점검만으로 소규모 노후교량에 대해 안전성을 판단하고 개축에 관한 의사결정을 수행하는 것은 유지관리에 미흡한 부분이 발생할 수 있다는 나타낸다. 따라서 소규모 노후교량의 유지관리를 위해서는 상시 계측 및 내하성능평가에 대한 추가적인 연구와 교량관리시스템의 이용을 통해 가 필요한 것으로 판단된다.

임대주택단지의 생활안전 위해요인 해소방안 (Resolution Method of Hazard Factor for Life Safety in Rental Housing Complex)

  • 손정락;조건희;김진원;송상훈
    • 토지주택연구
    • /
    • 제8권1호
    • /
    • pp.1-11
    • /
    • 2017
  • The government has been constructing and supplying public rental housing to ordinary people in order to stabilize housing since 1989. However, the public rental houses initially supplied to ordinary people are at high risk for safety accidents due to the deterioration of the facilities. Therefore, this study is aimed to propose a solution to solve the life safety hazards of the old rental housing complex as a follow-up study of Analysis of Accident Patterns and Hazard Factor for Life Safety in Rental Housing Complex. Types of life safety accidents that occur in public rental housing complexes are sliding, falling, crash, falling objects, breakage, fire accidents, traffic accidents and criminal accidents. The types of safety accidents that occur in rental housing complexes analyzed in this study are sliding, crashes, falling objects, and fire accidents. Although the incidence of safety accidents such as falling, breakage, traffic accidents and crime accidents in public rental housing complexes is low, these types are likely to cause safety accidents. The method of this study utilized interviews and seminar results, and it suggested ways to solve the life safety hazards in rental housing complexes. Interviews were conducted with residents and managers of rental housing complexes. Seminars were conducted twice with experts in construction, maintenance, asset management, housing welfare and safety. Through interviews and seminars, this study categorizes the life safety hazards that occur in rental housing complexes by types of accidents and suggests ways to resolve them as follows. (1) sliding ; use of flooring materials with high friction coefficient, installation of safety devices such as safety handles, implementation of maintenance, safety inspections and safety education, etc. (2) falling ; supplementation of safety facilities, Improvement of the design method of the falling parts, Safety education, etc. (3) crash ; increase the effective width of the elevator door, increase the effective width of the lamp, improve the lamp type (U type ${\rightarrow}$ I type), etc. (4) falling objects and breakage ; design of furniture considering the usability of residents, replacement of old facilities, enhancement of safety consciousness of residents, safety education, etc. (5) fire accidents ; installation of fire safety equipment, improvement by emergency evacuation, safety inspection and safety education, etc. (6) traffic accidents ; securing parking spaces, installing safety facilities, conducting safety education, etc. (7) criminal accidents; improvement of CCTV pixels, installation of street lights, removal of blind spots in the complex, securing of security, etc. The roles of suppliers, administrators and users of public rental housing proposed in this study are summarized as follows. Suppliers of rental housing should take into consideration the risk factors that may arise not only in the design and construction but also in the maintenance phase and should consider the possibility of easily repairing old facilities considering the life cycle of rental housing. Next, Administrators of rental housing should consider the safety of the users of the rental housing, conduct safety checks from time to time, and immediately remove any hazardous elements within the apartment complex. Finally, the users of the rental housing needs to form a sense of ownership of all the facilities in the rental housing complex, and efforts should be made not to cause safety accidents caused by the user's carelessness. The results of this study can provide the necessary information to enable residents of rental housing complexes to live a safe and comfortable residential life. It is also expected that this information will be used to reduce the incidence of safety accidents in rental housing complexes.

40mm 고속유탄(K212) 신관의 안전성 및 신뢰성 강화를 위한 탄약 자동화검사 알고리즘에 관한 연구 (Research on the Ammunition Automatic Test Algorithm for Improving Safety & Reliability of 40mm Grenade(K212) Fuze)

  • 주진천;권미선;김상민;안남수
    • 한국산학기술학회논문지
    • /
    • 제17권7호
    • /
    • pp.14-22
    • /
    • 2016
  • 신관은 다양한 부품과 복잡성으로 인해 육안 검사 시 휴먼에러가 발생할 수 있으며 부품 누락, 장전된 신관 등이 제품에 혼입될 경우 탄약이 폭발할 가능성을 내재하고 있다. 본 논문에서는 신관 검사 시 휴먼에러를 방지하기 위한 탄약 자동화검사 알고리즘을 제안한다. 탄약 자동화검사 알고리즘은 다음과 같은 세 단계로 구성된다. 첫 번째로 검사 이미지 입력 및 전처리 단계로써 검사 대상 이미지를 입력하고, 이미지 회전 알고리즘을 적용하여 이미지를 회전한 후 이진화 알고리즘을 사용하여 이미지를 컴퓨터 계산에 적합하도록 이진화한다. 두 번째로 장전 및 비장전 여부를 검사하는 단계로써 Masked Template Matching 알고리즘 등을 활용하여 탄약의 장전여부를 판단한다. 세 번째로 부품검사 단계로써 이미지 탐색 알고리즘 등을 활용하여 부품 위치나 부품 누락 여부에 대해서 판단한다. 본 탄약 자동화검사 알고리즘을 신관 검사에 적용한 결과 부품 누락, 장전 여부 등을 오류 없이 효율적으로 검출함으로써 40mm 고속유탄 신관의 신뢰성 및 안전성 향상에 기여할 것으로 판단된다.

GIS를 이용한 도로의 노면결빙구간 추출 (Extraction of Road Surface Freezing Section using GIS)

  • 최병길;김중식
    • 대한공간정보학회지
    • /
    • 제13권4호
    • /
    • pp.19-25
    • /
    • 2005
  • 본 연구의 목적은 GIS를 이용하여 도로의 노선계획시 예상되는 노면결빙구간을 추출함으로써 도로 안정성 확보에 대한 방안을 제시하는데 있다. 산악지역 도로계획의 경우 겨울철에는 결빙구간이 발생될 우려가 있다. 또한 도로의 신설 및 확장공사 턴키심의시 노면결빙율 평가자료가 요구되고 있다. 따라서 도로의 노선 계획시 기본설계에서부터 도로 각 구간에서의 일조 환경 및 노면결빙우려구간을 정량적으로 예측할 수 있는 분석방법이 필요하다. 본 연구에서는 동해고속도로 중 약 29km 구간에 대하여 3차원 모델링, 일조 시뮬레이션, 지오데이터베이스 구축, GIS 중첩 기능에 의한 공간분석을 통해 노면결빙 예상구간을 추출할 수 있었다. 본 연구를 통하여 음영에 따른 노면결빙이 우려되는 구간을 예측하고, 노면결빙위험 구간을 효과적으로 파악함으로써 최종적으로 정책결정자가 판단을 내리고 기본 설계시 반영하는 사전 안정성 평가 방안으로 사용할 수 있을 것이다.

  • PDF