• Title/Summary/Keyword: Risk management plan

Search Result 577, Processing Time 0.029 seconds

Tightened-Normal-Tightened Group Acceptance Sampling Plan for Assuring Percentile Life

  • Aslam, Muhammad;Azam, Muhammad;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.390-396
    • /
    • 2012
  • The present paper extends the idea of tightened-normal-tightened sampling scheme to group acceptance sampling plans under the time truncated life tests. We consider three famous distributions that are widely used in the area of reliability such as the generalized exponential distribution, the Weibull distribution, and the Birnbaum-Saunders distribution in the proposed sampling plan. The plan parameters are determined such that the producer's risk and the consumer's risk are satisfied at the specified median life. Extensive tables showing plan parameters are provided at various values of the experiment time and the consumer's risk for each of three distributions for the practical use. Some examples are given to illustrate the procedure of the proposed plan.

Proposal for Government Quality Assurance Risk Assessment System for Military Supplies (군수품 정부품질보증 위험성 평가제도 개선을 위한 제언)

  • Namsu Ahn
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.155-170
    • /
    • 2023
  • Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

A Study on the Risk Identification Methods for Initial and Mass Production Stage of Military Products Using FMEA (FMEA를 활용한 군수품 초도 생산 및 양산 단계의 위험 식별 방안 연구)

  • Lee, Chang Hee;Yang, Kyung Woo;Park, Du Il;Lee, Il Lang;Kwon, Jun Sig;Choe, Il Hong;Kim, Sang Boo
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.311-324
    • /
    • 2014
  • Purpose: It can deduce improvement plan that recognizes any risk factors in initial production and mass production by using FMEA and through this process, the appropriate criteria for defence items can be established. Methods: It proposes two methodology - Apply DT/OT data achieved from the beginning mass production stage based on FMECA data of the design stage, to risk management, and risk management plan that reflected line and field faliure data in case of is offered. Results: It proposes the risk management plan through Bayesian method and the risk identification that considered MTTF estimated value in case of initial production process. In case of mass production process, both risk identification by using fault occurrence frequency scores and Byaesian method, In case of the Initial production and mass production, it proposes use both two methods. Conclusion: A more realistic risk identification method can be applied, and by this method the quality improvement effect is expected.

A Study on the Establishment of a Container Terminal Safety Management Plan based on Risk Assessment (위험성평가 기반 컨테이너 터미널 안전관리계획 수립 방안 연구)

  • Hwi-Jin Kang;SangJun Han
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.873-882
    • /
    • 2022
  • Purpose: The purpose of this paper is to analyze accidents and potential risks occurring at container terminals and to conduct on safety management plans tailored to container terminals. Method: A model for establishing a safety management plan is presented through a case study of container terminal risk assessment and literature analysis. Result: According to the 'Statistics of Accidents in the Harbor Handling Industry', 2,800 people were killed or injured during port work for 10 years from 2011 to 2021. This corresponds to an occupational accident rate of one person every 1.5 days. As a method of improving these accidents and disasters, a highly effective safety management plan should be established to prevent the recurrence of accidents in accordance with the Special Act on Port Safety. It is proposed to establish a safety management plan that reflects the risk assessment of container terminals, safety organization, safety budget, safety rules, and safety education.

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Study on Development Plan and Derivation of Improvement by Procedure for the Systematization in Steep Slope Management System (급경사지 관리의 체계화를 위한 절차별 개선사항 도출과 발전 방안 연구)

  • Lee, Jae Joon;Yun, Hong Sic;Kim, Yun Hee;Park, Sang Hyun
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.111-122
    • /
    • 2020
  • Purpose: In order to manage the steep slopes effectively, this study diagnose problems in the procedure of steep slopes management and propose Improved frame work is intended to mitigate human and property damage Method: Problems in the system are drawn through review of procedures for designation of collapse risk zones and fied investigation, interviews with local governments, and expert advice. Result: The selection stage, the subject of the management, the management method, and the factors that need to be improved by the management stage before the evaluation are derived. Conclusion: This paper identified the problems raised and drew improvements and presented the research direction for the development of the new system (plan) and the steep slope site.

A Study on Risk Assessment of GHG Inventory Verification (온실가스 인벤토리 검증의 위험성평가에 대한 연구)

  • Lee, Kang-Bok;Kim, Geon-Ho;Lee, Seung-Hwan;Lee, Eun-Sook
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.203-208
    • /
    • 2009
  • Government and company are unfolding greenhouse gas reduction activity to prevent the effects of global warming. Also, verification business through greenhouse gas inventory construction is spreaded variously. Greenhouse gas verification proceeds by document examination, risk analysis, field survey. Document investigates emission information, calculation standard, emission report, data management system. And through risk assessment result, establish field verification plan. Through study on risk assessment of greenhouse gas inventory verification, wish to reduce risk of verification.

  • PDF

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.

A Study on Risk Management Plan for Container Terminals - with Safety Accidents - (컨테이너터미널의 리스크 관리 방안 연구 - 안전사고를 중심으로 -)

  • Yeun, Dong-Ha;Choi, Yong-Seok;Kim, Sun-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.163-164
    • /
    • 2015
  • This paper analyze a pattern and a cause of safety accident occupied in work filed of container terminals, calculate risk index considering accident frequency and severity, and then provide the relative risk assessment. Based on this, this paper provides the priority of risk reducing method in container terminals, proposes the risk management plan.

  • PDF