• Title/Summary/Keyword: Research Facility

Search Result 4,470, Processing Time 0.031 seconds

A Comparative Study On Optimization Algorithms for Capacited Facility Location (설비용량에 제한이 있는 입지선정 문제에 대한 기존해법간의 비교분석)

  • 차동완;정승학;명영수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.11 no.2
    • /
    • pp.1-6
    • /
    • 1986
  • Capacitated facility location problems have received a great deal of attention in the past decade, resulting in a proliferation of algorithms for solving them. As is the case with mixed 1-1 integer programming problems, the computational success of such algorithms depends greatly on how to obtain lower bounds in good quality within a resonable time. The objective of this paper is to provide a comparative analysis of those algorithms in terms of lower bounds they produce. Analyses of the strategies for generating lower bounds as well as the quality of generated lower bounds are provided.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

An Experimental Study on Two Parameter Control for Radiant Floor Heating System

  • Cho, Sung-Hwan;Tae, Choon-Seob;Jang, Chel-Yong
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.6
    • /
    • pp.136-147
    • /
    • 1998
  • An experimental facility consisting of two 3$\times$4.4$\times$2.8m rooms identical in construction is built. Each room has a control system and storage tank supplying hot water to the radiant floor heating system. The facility enables simultaneous comparison of two different control strategies each implemented in a separate room. The operating performance of three kinds of flow control scheme is tested and compared in this study: (ⅰ) conventional on-off control based on feedback from room air temperature (ⅱ) TPSC(two parameter switching control )(ⅲ) TPOC(two parameter on-off control). Results show that TPSC and TPOC using room air and surface temperature sequentially as feedback signal to control hot water supply is the better temperature regulation scheme than conventional control based on feedback from only room air temperature. They are good candidates for the room with radiant floor heating system under continuous and intermittent heating mode.

  • PDF

A Simulation Study of Navy Drydocks (해군 건선거 모의실험 연구)

  • Jo Deok-Un
    • Journal of the military operations research society of Korea
    • /
    • v.9 no.2
    • /
    • pp.23-30
    • /
    • 1983
  • A simulation study was conducted to determine optimum capacity of Navy drydock facility using GASP-IV, an advanced FORTRAN-based simulation language, under demands of regular overhauls and emergency repairs by ships of an hypothetical fleet composition. Three year dock usage data was analyzed to produce probability distributions underlying drydock repair demands. The present facility size of two drydocks was simulated and was found to be somewhat short of adequate service capability, showing excessive average waiting time and average queue length. The simulation model was then modified to include an additional drydock of similar size as the other two and a year's simulation was again conducted. All repair needs were quite satisfactorily met and all docks showed very high utilization factor (0.98). This contributed to an increase in the fleet's ship availability from 0.95 to 0.99. This study illustrates the usefulness of simulation technique as a tool for analyzing policy alternatives in military long-term investment areas.

  • PDF

The (s, S) Policy for Production/Inventory Systems with Lost Sales (판매기회가 유실되는 생산/재고 시스템에서의 (s, S) 재고정책)

  • 이효성
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.1
    • /
    • pp.13-34
    • /
    • 1991
  • A production/inventory system is considered in which a production facility produces one type of product. The demand for the product is given by a compound Poison process and is supplied directly from inventory when inventory is available and is lost when inventory is out of stock. The processing time to produce one item is assumes to follow a general distribution. An (s, S) policy is considered in which production stops at the instant the stock on hand reachs S and the setup of the production facility begins at an inspection point when the stock on hand drops to or below s for the first time. The time interval between two successive inspection points during a non-production period is a random variable which follows a general distribution.

  • PDF

A dual based heuristic for the hub location and network design problem with single assignment constraint (단일연결 제약하의 설비입지를 고려한 망설계 문제의 쌍대기반 해법)

  • 윤문길
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.1
    • /
    • pp.67-84
    • /
    • 2000
  • In this paper, we address a network design problem including the decision of hub facility locatiions which is typically found in a communicatio and a transportation network design studies. Due to the administrative and the geographical restrictions, it is common to assume that each user should be assigned to only one hub facility. To construct such a network, three types of network costs should be considered: the fixed costs of establishing the hubs and the arcs in the network, and the variable costs associated with transversing the network. The complex problem is formulated as a mixed IP embedding a multicommodity flow problem. Exploiting its special structure, a dual-based heuristic is then developed, which yields near-optimal design plans. The test results indicate that the heuristic is an effective way to solve this computationally complex problem.

  • PDF

A study on the homestay in Donghae City (동해시 민박업실태에 관한 연구)

  • 김광수;손재영;곽희진
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.12 no.2
    • /
    • pp.43-58
    • /
    • 2001
  • This study focuses on analyzing the present conditions of homestay in Donghae, which helps to increase the fishing and agrarian villages' income and offer a low-priced lodging facility to tourists. Furthmore it tries to find the related problems and to suggest the solutions. For this purpose, homestsy businesses in Donghae city was surveyed by the questionnaire. Frequency analysis and Cross table analysis of the collected 97 questionnaries were conducted by the SPSS, and the related problems were found as follows. After homestay business turned to the liberal business, professional homestay businessmen appeared and conflicts between farmer and professional businessman came out. And there's a limitation on providing subsidiary facilities and services for the local businesses because of their financial difficulty and on-off season. Therefore to develop “fishing and agrarian villages' homestay businesses” well-defined standards of homestay is required. Then to provide subsidiary facility, services and special programs activation of homestay association is necessary. Finally, to attract tourists, local government's tourist attraction policy is needed.

  • PDF

A study on the developing the diagnosis technology and expert system in fossil power plant (화력발전설비 진단기술 및 전문가 시스템개발에 관한 연구)

  • Baik, Young-Min;Jeong, Hee-Don;Shin, Eun-Ju
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.642-648
    • /
    • 2008
  • In order to analyze the causes of fossil power plant facilities due to a degradation and corrosion, artificial degraded materials composed of the facilities were manufactured. Various experiment were performed based on mechanical test, microstructure observation, hardness test, electrochemical potentiokinetic reactivation test(EPR) and corrosion scale thickness measurement test. The master curves were write out using Larson-Miller parameter to evaluate the degree of degradation with the above diagnosis methods. These data were applied to materials database of fossil power plant diagnosis. Finally expert system on the fossil power plant diagnosis was developed using the master curves and diagnosis algorithms.

  • PDF

A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility (대기시간 제약을 고려한 반도체 웨이퍼 생산공정의 스케쥴링 알고리듬)

  • Joo, Byung-Jun;Kim, Yeong-Dae;Bang, June-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.266-279
    • /
    • 2009
  • This paper focuses on the problem of scheduling wafer lots with limited waiting times between pairs of consecutive operations in a semiconductor wafer fabrication facility. For the problem of minimizing total tardiness of orders, we develop a priority rule based scheduling method in which a scheduling decision for an operation is made based on the states of workstations for the operation and its successor or predecessor operation. To evaluate performance of the suggested scheduling method, we perform simulation experiments using real factory data as well as randomly generated data sets. Results of the simulation experiments show that the suggested method performs better than a method suggested in other research and the one that has been used in practice.

Analysis of Loading/Unloading Activity for Efficient Urban Goods Movement Plan - Focusing on Chiba City -

  • Park Sang-Chul;Yun Jeong-Mi
    • Journal of Navigation and Port Research
    • /
    • v.29 no.4
    • /
    • pp.305-312
    • /
    • 2005
  • Pick-up/delivery of consumer goods to offices, shops, and restaurants in order to support urban lives is one of the most vital activities in a city. With economic growth and technological innovation, a greater variety of goods have come to be supplied, and pick-up/delivery of consumer goods has become more complex. Efficient urban goods movement in Central Business District(CBD} starts with an efficient system for loading/unloading, and pick-up/delivery activities. Loading/unloading activity may be carried out on-street, or on especially designated space inside or outside buildings. Therefore, purpose of this study is to clarity the efficient urban goods movement in CBD(also called the pick-up/delivery activity) from the three different types of loading/unloading facilities. For this purpose, the differences in loading/unloading and truck-trip activity time of each loading/unloading facility was compared by performing the simulation analysis.