• Title/Summary/Keyword: Remodeling factors

Search Result 242, Processing Time 0.029 seconds

An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase- (공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로-)

  • Shim, Gyu-Jung;Seo, Jong-Min;Na, Young-Ju;Song, Yong-Sik;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.8 no.5
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

A Study on the Trends of Remodeling in the Apartment Housing Unit - Focused on case study of the Korea National Housing Corporation - (공동주택 주호의 리모델링 경향에 관한 연구 - 대한주택공사 리모델링 사례 및 현상공모전 사례를 중심으로 -)

  • 오진수;조영호
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.5
    • /
    • pp.198-205
    • /
    • 2004
  • The remodeling of apartment that improves the improves the life level is going to be in the market because of lots of old apartment buildings. Until now, the research of remodeling is mainly restricted to the laws and financial funding, however, the needs in the trend of remodeling. This research, first, through the examples of remodeling in the country, this study draws remodeling factors that can be applied. Secondly, this study targets the study of remodeling to apartments and analyzes the type of housings made by the Korea National Housing Corporation. Thirdly the study analyzes the features that appear in housing units and draws out factors of remodeling This research's result is arranged as follows. \circled1Need Remodeling thorough study of space expanded, grant between artificer and active performance improvement direction such as building equipment expansion along with Remodeling concept of unit repair. \circled2When apartments are newly built, systematic construction is necessary that considers future efficiency improvement from the design stage. \circled3This study, which applied the characteristic factors appearing after the 1990s to remodeling factors, show that they can be applied when remodeling the worn out wall-slab type apartments.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

A Study on Building Programming of the Public Library through the Information Factor Analysis (정보인자 분석에 의한 공공도서관 건축프로그래밍에 관한 연구)

  • 이상호;공순구
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.5
    • /
    • pp.48-55
    • /
    • 2004
  • The remodeling of apartment that improves the improves the life level is going to be in the market because of lots of old apartment buildings. Until now, the research of remodeling is mainly restricted to the laws and financial funding, however, the needs in the trend of remodeling. This research, first, through the examples of remodeling in the country, this study draws remodeling factors that can be applied. Secondly, this study targets the study of remodeling to apartments and analyzes the type of housings made by the Korea National Housing Corporation. Thirdly the study analyzes the features that appear in housing units and draws out factors of remodeling This research's result Is arranged as follows. \circled1Need Remodeling thorough study of space expanded, grant between artificer and active performance improvement direction such as building equipment expansion along with Remodeling concept of unit repair. \circled2When apartments are newly built, systematic construction is necessary that considers future efficiency improvement from the design stage. \circled3This study, which applied the characteristic factors appearing after the 1990s to remodeling factors, show that they can be applied when remodeling the worn out wall-slab type apartments.

An Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling (사무소 리모델링의 실내환경요소에 대한 선호도 분석 -수요자와 공급자 측면 비교를 중심으로-)

  • Choi, Jin-Hyuk;Park, Tae-Eun;Lee, Jeong-Bok;Kim, So-Yeon;Lee, Kyung-Hoi
    • KIEAE Journal
    • /
    • v.2 no.4
    • /
    • pp.57-64
    • /
    • 2002
  • Nowadays the importance of Building Remodeling as a means to create an architectural environment capable of responding to the social, economic changes has increased more than before. After long time pass, the aged building have faced the need for the overall repair of the structure and function. Remodeling is much more saving the time and cost than new construction in the office building. This study was focused in functional and efficient evaluation. Based on these points, we developed the evaluation factors, and verified a validity of evaluation factors through a survey. The purpose of this study was focused on the Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling. This study provides us the competitive guidance of remodeling. The owners and tenants take the maximum efficiency with the minimum cost.

A Case Study of Rural House Remodelling with Traditional Residence Factors (전통주거공간요소를 활용한 농촌주택 리모델링 현장적용 사례연구)

  • Kim, Myo-Jung;Kim, Sang Bum
    • Journal of Agricultural Extension & Community Development
    • /
    • v.14 no.2
    • /
    • pp.417-436
    • /
    • 2007
  • The purpose of this study was to prepare for developing rural house remodeling techniques utilizing the traditional residence factor. The study was carried out through both literature research and on-site research. The traditional residence space factors were identified through literature research and on-site research was carried out through analysis of the rural house remodeling cases. The results of this study was as follows ; 1) Traditional space factors were derived by literature research i. e. space arrangement (topography, direction, plane arrangement), exterior factors; walls, madang, interior factors; roofs, ondol, floors, colours. 2) The traditional residence factor utilizations of remodeling were applied a result through investigation case and analysis. Five rural houses in Namsa village, Danseong-myeon, Sangcheong-gun, Gyeongsangnam-Do were analyzed as remodeling cases including traditional residence factors. There were limitation of budget problems and material selection in the traditional residence factor utilizations of remodeling. The researchers have chosen target rural houses which applied for traditional residence factors to remodel the rural houses, and the most important factor to consider was harmony with rural unique characteristics. The researchers suggested considerations should be placed on development with energy savings and convenience in rural house remodelling.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Development of Guidelines for Indoor Environment in Apartment Remodeling Projects (아파트 리모델링의 실내환경 계획지침 개발)

  • Choi, Yoon-Jung
    • Journal of the Korean housing association
    • /
    • v.20 no.3
    • /
    • pp.1-10
    • /
    • 2009
  • The final aim of this study was to propose guidelines for the indoor environment of apartment remodeling projects. The first task of this study was to understand the major elements and the actual condition of the remodeling for apartment unit by carrying out in-depth interviews on residents and specialists. The open-access interviews were conducted with interior designers who have a wide experience of apartment remodeling and residents who live in recently remodeled apartment units. The second task was to evaluate the actual condition of the indoor environment and to analyze the main factors that affect the indoor environment in remodeled apartment units. Field measurements were carried out in twenty apartment units occupied after remodeling, recording indoor environment elements (indoor temperature, globe temperature, relative humidity, $CO_2$, CO, PM10, TVOC, HCHO, illumination, and equivalent noise level). Moreover, resident interviews and researcher observations were carried out to determine the contents of the remodeled unit and to investigate the architectural and living factors(like ventilation characteristics, etc.) related to the indoor environment. The results are as follows. The remodeling elements generally included the changing of lighting fixtures and finishing materials in all the spaces, the integration of the balcony into the children's room, the installation of furniture in the kitchen and the entrance, the changing storage furnitures and equipments in the bathroom. The average levels of each unit of relative humidity, $CO_2$, TVOC, HCHO, equivalent noise level, and illumination were proved to be on the whole in inadequate condition. The factors that affect these indoor elements were classified as remodeling factors (remodeling amounts, extent balcony integration, and lighting fixture exchange), ventilation characteristics, and living factors. According to these results, this research proposed the guidelines for the indoor environment in apartment remodeling projects.

A Study on Residential Evaluation & Remodeling Preference Characteristics with the Personality Type( I ) (성격 유형과 주거평가 및 리모델링 선호특성에 관한 연구( I ))

  • Kim Nam-Hyo;Lee Sang-Ho
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.3 s.50
    • /
    • pp.208-215
    • /
    • 2005
  • The purpose of this study is to analyze the relationship between the personality type and the residential evaluation & remodeling preference. The subjects of this investigation were collected through questionnaire from two hundred and twelve adult residents who live in Seoul, Korea. The collected cases are analyzed by using statistics software spss-win. The personality is classified eight types; E(extraversion), I(introversion), S(sensing), N(intuition), T(thinking), F(feeling), J(judging) and P(perceiving) in MBTI (Myers Briggs Type Indicator). By using the rotated component matrix of varimax method, the satisfaction of the actual residential conditions is classified into seven grouping factors. The preference of interior image is classified into thirteen factors. The important living patterns - activity, interest, and opinion - are classified into ten factors. And the important needs of residential remodeling are classified into twelve factors. By using the one way anova method, between these forty two grouping factors and personality type MBTI, there are analyzed several significances that will be useful in residential design and remodeling design & planning

Factors Determining the Price of Remodeled Multi-family Housing (리모델링 공동주택의 가격결정요인에 관한 연구)

  • Kim, JaeSung;Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.13-22
    • /
    • 2016
  • Remodeling of multi-family house (MFH) has emerged as a major issue in the construction industry. Many decision-makers are struggling to determine whether to conduct a remodeling because of insufficient information including standard or method for projecting the price of their facilities after remodeling works. In this context, this research has conducted for analyzing how the price of the MFH is shifted by remodeling works. To achieve this research goal, (i) fourteen MFH remodeling cases were collected and (ii) price variation for the collected cases was analyzed in order to figure out how remodeling work affects the price of MFH cases. Finally, this research suggested the factors determining price of the MFH, wherein remodeling work has been conducted. From the results of this research, it is expected that the decision-makers can understand what is the crucial factors for determining the price of their MFH when they plans remodeling, and further this research can be a corner stone for developing a model for predicting the price of MFH if remodeling would be performed.