• Title/Summary/Keyword: Ramp method

Search Result 270, Processing Time 0.027 seconds

Comparison of Various Edge Detection Techniques Using 2D Intensity Image (2D 영상에서의 에지 검출 기법들의 비교 연구)

  • Yang, Woo-Suk;Cho, Nam-Gook
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.883-885
    • /
    • 1995
  • Edges are one of the most important features used in various computer vision applications. Most of the known edge detection techniques are categorized into three gropus: First two approaches are to find gray level changes using first-order or second-order differentiation. The third method uses intrinsic propoeties of edges such as the result shown during scale space filtering. In this paper, we study various kind of edge detection techniques. Two images (Lenna image and a certain image which is composed of step, ramp, roof, and other artificial edge patterns) are used to compare different edge detection techniques and to verify the advantages and disadvantage of each techniques.

  • PDF

Probabilistic Load Flow for Power Systems with Wind Power Considering the Multi-time Scale Dispatching Strategy

  • Qin, Chao;Yu, Yixin;Zeng, Yuan
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1494-1503
    • /
    • 2018
  • This paper proposes a novel probabilistic load flow model for power systems integrated with large-scale wind power, which considers the multi-time scale dispatching features. The ramp limitations of the units and the steady-state security constraints of the network have been comprehensively considered for the entire duration of the study period; thus, the coupling of the system operation states at different time sections has been taken into account. For each time section, the automatic generation control (AGC) strategy is considered, and all variations associated with the wind power and loads are compensated by all AGC units. Cumulants and the Gram-Charlier expansion are used to solve the proposed model. The effectiveness of the proposed method is validated using the modified IEEE RTS 24-bus system and the modified IEEE 118-bus system.

Assessment of Three-Phase Actuated Signal Operation at Diamond Interchanges (다이아몬드 인터체인지의 3 현시 신호운영 평가)

  • 이상수
    • Proceedings of the KOR-KST Conference
    • /
    • 2002.02a
    • /
    • pp.143-159
    • /
    • 2002
  • The performance of two single-barrier three-phase actuated control systems at diamond interchanges was evaluated for various traffic conditions. To emulate the actuated signal control, hardware-in-the-loop system combined with CORSIM simulation program was used. Two performance measures, average delay and total stops, were used for the evaluation process. Results showed that the two three-phase systems gave similar performance in terms of average delay, but not stops. The delay performance of each phasing system was generally dependent on the traffic pattern and ramp spacing. The total stops decreased as the spacing increased, and it was the most sensitive variable that can differentiate between the two three-phase systems. It was also shown that the hardware-in-the-loop control could provide a good method to overcome the limitations of current simulation technology.

  • PDF

Designing Test Methods for IT-Enabled Energy Storage System to Evaluate Energy Dynamics

  • Kim, Young Gon;Kim, Dong Hoon;Lee, Eun-Kyu
    • Journal of Information Processing Systems
    • /
    • v.13 no.6
    • /
    • pp.1487-1495
    • /
    • 2017
  • With increasing interests in renewables, more consumers are installing an energy storage system (ESS) in their backyards, and thus, the ESS will play a critical role in the emerging smart grid. Due to mechanical properties, however its operational dynamics must be well understood before connecting the ESS to the smart grid (and eventually to an IT system). To this end, we investigate charging and discharging processes in detail. This paper, then, proposes methods for four type tests (state of charge test, conversion efficiency test, response time test, and ramp rate test) that can assess the dynamics of the ESS. The proposed methods can capture accurate delay values of mechanical processes in the ESS, and it is expected for those values to help design real-time communication systems in the smart grid involving the ESS.

Security Cost Analysis with Linear Ramp Model using Contingency Constrained Optimal Power Flow

  • Lyu, Jae-kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.3
    • /
    • pp.353-359
    • /
    • 2009
  • This paper proposes a novel technique for calculating the security costs that properly includes ramping constraints in the operation of a deregulated power system. The ramping process is modeled by a piecewise linear function with certain assumptions. During this process, a ramping cost is incurred if the permissible limits are exceeded. The optimal production costs of the power producers are calculated with the ramping cost included, considering a time horizon with N-1 contingency cases using contingency constrained optimal power flow (CCOPF), which is solved by the primal-dual interior point method (PDIPM). A contingency analysis is also performed taking into account the severity index of transmission line outages and its sensitivity analysis. The results from an illustrative case study based on the IEEE 30-bus system are analyzed. One attractive feature of the proposed approach is that an optimal solution is more realistic than the conventional approach because it satisfies physical constraints, such as the ramping constraint.

An Experimental Study of Pipkin-Rogers Model for Automotive Bushing (자동차 부싱에 대한 Pipkin-Rogers 모델의 실험적 연구)

  • Kim, Sung-Jin;Lee, Su-Young;Lee, Seong-Beom
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.11 s.176
    • /
    • pp.118-124
    • /
    • 2005
  • An automotive bushing is a device used in automotive suspension systems to reduce the load transmitted from the wheel to the frame of the vehicle. A bushing is a hollow cylinder, which is bonded to a solid steel shaft at its inner surface and a steel sleeve at its outer surface. The relation between the force applied to the shaft and the relative deformation of a bushing is nonlinear and exhibits features of viscoelasticity. In this paper, an automotive bushing is regarded as nonlinear viscoelastic incompressible material. Instron 8801 equipment was used for experimental res earch and ramp-to-constant displacement control test was used for data acquisition. Displacement dependent force relaxation function was obtained from the force extrapolation method and expressed as the explicit combination of time and displacement. Pipkin-Rogers model, which is the direct relation of force and displacement, was obtained and comparison studies between the experimental results and the Pipkin-Rogers results were carried out.

Modified Driving Method for Reducing Address Time During Subfield Time in AC PDP (플라즈마 디스플레이 패널에서 부화면 시간동안 기입시간을 단축시키기 위한 수정된 구동파형)

  • Cho, Byung-Gwon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.1
    • /
    • pp.135-139
    • /
    • 2015
  • The address discharge time lags are investigated in each subfield time in AC plasma display panel and a modified driving waveform is proposed to reduce the address discharge time lag by applying different additional scan voltage under no misfiring discharge production. The weak plasma discharge in AC PDP is generated by applying high positive-going ramp waveform to the scan electrode during the first reset period and that induce the production of the priming particle and wall charge. Because the wall charge becomes the wall voltage in a cell, the wall plus external address voltage produce the address discharge. However, as the wall charge in a cell is gradually disappeared as time passed, the address discharge time in the subfield time for 1 TV frame is lagged. In the first subfield time, the address discharge is faster produced than the other subfield time because the wall charge are much remained by the high positive-going ramp voltage during the reset period in the first subfield time. Meanwhile, from the second to last subfield, the address discharge production time is gradually delayed due to the dissipation of the wall charge in a cell. In this study, the address discharge time lags are measured in each subfield time and the total address discharge time lags are shortened by applying the different additional scan voltage during the address period in each the subfield time.

The Selection of Optimal Interchange Types by Quantifying the User Costs and Construction Costs of Ramps (연결로의 사용자 비용과 공사비 계량화를 통한 입체교차로 최적형식 선정 기법)

  • Kim, Sang-Youp;Choi, Jai-Sung;Min, Kyung-Chan;Choi, Hyun-Ho
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.33-41
    • /
    • 2010
  • It is stated in the highway geometric design guide that expressway interchange types should be selected considering a set of input variables including travel demand, topography, construction cost and interchange spacing. However, this selection method has a problem of providing different interchange types even for the same input variables depending upon different applications of engineers discretion. A procedure that produces consistent results is necessary and this paper presents the development of an efficient and reliable procedure based on the quantification of road user costs and construction costs on interchanges. To develop this procedure, a survey of existing expressway interchange types in South Korea was made and 10 basic interchange types and 52 supplementary interchange types were identified. To relate road user costs and construction costs to these interchange types, this research uses two method. First, interchange types were expressed by a set of ramp configurations. Second, road user benefits and construction costs associated with these different interchange types were formulated based on the current national guide of the expressway economical analysis. As a result, it was proved that an interchange type to provide minimum costs could be selected consistently and this research result should be useful for future expressway geometric designs.

Development of pressurizing support tunneling method and case study of its field application (가압지보 터널공법 개발 및 현장적용 사례 분석)

  • Kim, Dea-Young;Lee, Hong-Sung;Lee, Se-Jin;Lee, Hee-Kwang;Sim, Bo-Kyoung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.4
    • /
    • pp.397-419
    • /
    • 2012
  • The pressurizing support tunneling method has been developed that overcomes shortcomings of conventional trenchless methods and applied to the field. The main concept of the new method is the pressurization system which, by means of pressurization bag between outer flange of steel ribs and excavated perimeter, applies higher pressure than the pressure relaxed by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through 3D numerical analyses. The new method was applied to the construction of a 10.7 m wide, 7.9 m high and 85 m long ramp tunnel that passes under ${\bigcirc}{\bigcirc}$ Expressway. By applying the new method, the tunnel construction was successfully completed in 13.5 months which decreases construction time to 35% compared to conventional methods, and ground displacement was almost negligible.

Continuous Sliding Mode Control for Permanent Magnet Synchronous Motor Speed Regulation Systems Under Time-Varying Disturbances

  • Wang, Huiming;Li, Shihua;Yang, Jun;Zhou, XingPeng
    • Journal of Power Electronics
    • /
    • v.16 no.4
    • /
    • pp.1324-1335
    • /
    • 2016
  • This article explores the speed regulation problem of permanent magnet synchronous motor (PMSM) systems subjected to unknown time-varying disturbances. A continuous sliding mode control (CSMC) technique is introduced for the speed loop to enhance the robustness of PMSM systems and eliminate the chattering phenomenon caused by high-frequency switch function in the conventional control law. However, the high control gain of the CSMC law in the presence of strong disturbances leads to large steady-state speed fluctuations for PMSM systems. In many application fields, PMSM systems are affected by time-varying disturbances instead of constant disturbances. For example, electric bicycles are usually affected by changing environmental disturbances, including wind speeds, road conditions, etc. These disturbances may be in the form of constant, ramp, and parabolic disturbances. Hence, a generalized proportional integral (GPI) observer is employed to estimate these types of disturbances. Then, the disturbance estimation method and the aforementioned CSMC method are combined to establish a composite sliding mode control method called the CSMC+GPI method for the speed loop of PMSM systems. Contrary to the conventional sliding mode control technique, the proposed method completely eliminates the chattering phenomenon caused by the switching function in the conventional control law. Moreover, a small control gain for the CSMC+GPI method is chosen by feed-forwarding estimated values to the speed controller. Hence, the steady-state speed fluctuations are small. The effectiveness of the proposed control scheme is verified by simulation and experimental result.