• Title/Summary/Keyword: RUNWAY

Search Result 212, Processing Time 0.028 seconds

The 3D Numerical Analysis on the Turbulent at 40° Crosswind, for the Predictions of Flight Stability at Take-off and Landing (이·착륙 비행 안정성 예측을 위한 측풍 40° 방향에 대한 3차원 수치해석)

  • Sheen, Dong-Jin;Kim, Do-Hyun;Park, Soo-Bok
    • Journal of Advanced Navigation Technology
    • /
    • v.16 no.2
    • /
    • pp.179-189
    • /
    • 2012
  • The aim of this paper is to research the change in the turbulent flow and the AOA(Angle Of Attack) occurred by $40^{\circ}$ crosswind to the direction of runway through the three-dimensional numerical analysis and to predict the take-off and landing flight stability. As a result, the maximum amplitude of AOA variation on runway reached $2^{\circ}$ within 3 second because of the wake formed by the constructions in the vicinity of the airport, and the overall effects appeared as an irregular aperiodic forms. Additionally, it was observed that the layout and shape of the buildings effected on the strength of turbulence directly, and the rapid flow generated between the buildings changed into stronger wake and eventually expected that the flow raises serious take-off and landing flight instability.

Experimental Study on Fatigue Crack in Welded Crane Runway Girders (2) -Repair methods of Fatigue Crack- (크레인 거더의 피로균열에 관한 실험적 연구 (2) -피로균열의 보수법-)

  • Kim, Jin-Ho;Im, Sung-Woo;Chang, In-Hwa;Shiga, Atsumi
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.2 s.35
    • /
    • pp.303-315
    • /
    • 1998
  • Four types of repair procedures are applied to the fatigue cracked crane runway gilders, which are stop-holes as crack arrester stop-holes reinforced with high strength bolts, welding repair and reinforcement with high strength bolted splices. The fatgiue cracks are reinitiated at the region where stop-holes and weld repairments are applied, while none of the cracks are observed in the cases of stop-holes reinforcement and reinforcement with high strength bolted splices. When using stop-holes and hole-reinforcement all repaired regions show a same fatigue strength to the one before the repairments. The experiments also reveal that the proper weldment is an essential factor when applying the welding repairement as a properly welding produces the same level of fatigue strength after the repairement. When the situation permits to use reinforcement with high strength boilted splices, the experiments shows the repairment is the best possible method among the procedures available.

  • PDF

An Analysis on the Degradation of Elevation Angle Accuracy Due to the Multi-Path Effect Using a Phased Array Antenna and the Beam Pattern Optimization to Minimize Its Degradation (위상배열 안테나를 활용한 다중 경로 효과에 의한 고각 정확도 열화 분석 및 열화 최소화를 위한 빔 패턴 최적화)

  • Kim, Young-Wan;Lee, JaeMin;Chae, Heeduck;Jin, Hyung-suk;Park, Jongkuk
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.27 no.12
    • /
    • pp.1036-1043
    • /
    • 2016
  • In this paper, an analysis about the elevation angle accuracy degradation of an APAR(Airport Precision Approach Radar) due to the multi-path effect using a phased array antenna was performed. An APAR installed around a runway of airport will be continuously affected in a runway surface of the fixed environment. In this paper, an analysis about the elevation angle accuracy degradation of APAR due to the multi-path effect of runway surface was conducted through a calculation of monopluse slope and sum/difference beam pattern analysis of array antenna. Also, a difference pattern for monopulse to minimize this degradation was optimized in an appropriate configuration to improve a elevation angle accuracy. Finally, a degree of improvement of elevation angle accuracy was confirmed by calculating a monopulse slope including the ground reflection after applying optimized difference patterns of array antenna.

Advanced Estimation Model of Runway Visual Range using Deep Neural Network (심층신경망을 이용한 활주로 가시거리 예측 모델의 고도화)

  • Ku, SungKwan;Park, ChangHwan;Hong, SeokMin
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.6
    • /
    • pp.491-499
    • /
    • 2018
  • Runway visual range (RVR), one of the important indicators of aircraft takeoff and landing, is affected by meteorological conditions such as temperature, humidity, etc. It is important to estimate the RVR at the time of arrival in advance. This study estimated the RVR of the local airport after 1 hour by upgrading the RVR estimation model using the proposed deep learning network. To this end, the advancement of the estimation model was carried out by changing the time interval of the meteorological data (temperature, humidity, wind speed, RVR) as input value and the linear conversion of the results. The proposed method generates estimation model based on the past measured meteorological data and estimates the RVR after 1 hour and confirms its validity by comparing with measured RVR after 1 hour. The proposed estimation model could be used for the RVR after 1 hour as reference in small airports in regions which do not forecast the RVR.

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

A Suitability Study and Development of Low Strength Perlite Concrete as Aircraft Rapid Arresting System (항공기 과주방지 포장시스템에 적합한 저강도 펄라이트 콘크리트의 개발 및 적합성 연구)

  • Kim, Choon-Seon;Lee, Young-Soo;Ha, Wook-Jai;Han, Jae-Hyun
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.59-70
    • /
    • 2010
  • More than 10 different cases of airline overrun accidents happened annually home and abroad in recent years. So the government put the guidelines to protect that kinds of accidents, which is named 'Runway End Safety Area'. However, the great part of airports are far from the standards, because most of the airports have been built before the guidelines. Moreover, in many cases natural obstacles, ambiance, and local area developments obstruct the extension of the runway to meet the criteria. For these reasons, the Federal Aviation Administration (FAA) recommends that the aviation fields construct 'Aircraft Rapid Arresting System(ARAS)' at the end of the runway. Many airdromes have been constructing the system and some airports have already completed the construction. In this research, our team performed a basic study about low strength perlite concrete to provide the proper material with 'ARAS'. As a result, the unit weight of the low strength perlite concrete was $4.5{\sim}6.4kN/m^3$ and uniaxial compressive strength was measured in the range of $400{\sim}1,470kN/m^2$. In addition, we tested penetration compressive strength by using CBR tester, and we observed that the strength was increased after around 60% of penetration rate. Also, 40% of penetration rate was measured through the penetration test with dump trucks.

A Study on Performance of Steel Monocell Expansion Joints (강재형 모노셀 신축이음장치 성능 연구)

  • Kim, Yong-Hoon;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.502-509
    • /
    • 2019
  • Studies have been made on performance evaluation of expansion joint systems for an ordinary highway or road bridge. However little study has been made for runway connection bridges at airports. A study on performance evaluated from computer code analysis and shrinkage, extension, and compression repetition tests based on KS F 4425 is conducted to a newly developed expansion joint system which has been installed in a runway connection bridge at Incheon Airport Extension 2 Construction Site. The MIDAS computer code is used to analyze the performance before the manufacture of the mock-up of expansion joint system on the basis of design requirements. Tests based on the KS F 4425 of 2001 year-version are conducted for the mock-up. Domestic codes and standards to validate the performance of the expansion joint system in a connection bridge have been developed for a vehicle. However the expansion joint system tested in this study is installed in a runway connection bridge for an aircraft. Conservatively the heaviest one among airplanes departing and landing at Incheon Airport is assumed level-F $468.4kN/m^2$ and adopted for the tests and analyses in this study. KS F 4425 method is selected for the shrinkage, extension, and compression repetition tests. No remarkable problem was observed for the 2,500-cycle shrinkage and extension and two million-cycle repeatition load tests. The results of this study are expected to contribute to establishment of code and standard for the performance validation of an expansion joint system installed in a runway connection bridge for an aircraft by providing performance test results and computer analysis results based on finite element methods.

Development of Brake System with ABS Function for Aircraft

  • Jeon, Jeong-Woo;Woo, Gui-Aee;Lee, Ki-Chang;Kim, Yong-Joo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.423-427
    • /
    • 2003
  • In this paper, it is to development of brake system with ABS function for aircraft. The test of brake system is required before applying on aircraft. The real-time dynamic simulator with 5-D.O.F. aircraft dynamic model is developed for braking performance test of ABS (Anti-skid Brake System) control h/w with anti-skid brake functions. The dynamic simulator is real-time interface system that is composed of dynamic simulation parts, master control parts, digital and analog in/out interface parts, and user interface parts. The 5-D.O.F. aircraft dynamic model is composed of a big contour and a little contour by simulation s/w. The big contour represents the interactions of forces in airframe, nose and main landing gear, and engines on the center of gravity. The little contour represents interactions of wheel, braking units, hydraulic units and a control unit. ABS control h/w unit with ABS control algorithm is also developed and is tested with simulator under the some conditions of gripping coefficient. We have known that ABS control h/w unit on wet or snowy runway as well as dry runway very well protects wheel skid.

  • PDF