1 |
Ahn, S. (2015). "A Case Study of the Risk Identification in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23.
DOI
|
2 |
California (2012). Project Risk Management Handbook, California Department of Transportation.
|
3 |
Han, S.H., Park, H.K., Yeom, S.M., Chae, M.J., and Kim, U.Y. (2014). "Risk-Integrated Cash Forecasting for Overseas Construction Projects." KSCE Journal of Civil Engineering, 18(4), pp. 875-886.
DOI
|
4 |
Kang, H.W., and Kim, Y.S. (2016). "Analysis of the Probabilistic Cost Variation Ranges According to the Effect of Core Quantitative Risk Factors for an Overseas Plant Project." KSCE Journal of Civil Engineering, 20(2), pp. 509-518.
DOI
|
5 |
Kim, J.H. (2010). "Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site." Journal of the Korea Institute of Building Construction, 10(4), pp. 83-93.
DOI
|
6 |
Ovidiu, C. (2014). Risk Management for Design and Construction, Wiley.
|
7 |
Texas. (2010). Risk-Based Construction Cost Estimating Reference Guide, Texas Department of Transportation.
|
8 |
Kang, H.W., Lee, W.B., Kim, M.J., Kim, Y.S. (2020). "A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction." Korean Journal of Construction Engineering and Management, KICEM, 21(1), pp. 32-39.
DOI
|
9 |
Cha, H.S., and Shin, K.Y. (2011). "Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea." Journal of Asian Architecture and Building Engineering, 10(2), pp. 437-444.
DOI
|
10 |
Kang, H.W., and Kim, Y.S. (2018). "A Model for Risk Cost and Bidding Price Prediction Based on Risk Information in Plant Construction Projects." KSCE Journal of Civil Engineering, 22(11), pp. 4215-4229.
DOI
|
11 |
Kim, Y.S., and Kang, H.W. (2017). "Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects." KSCE Journal of Civil Engineering, 20(5), pp. 1549-1562.
|
12 |
Kim, K.K. (2007). "A Study for Major Cost Increaseing Factors in Skyscraper Construction using FMEA." Journal of Architectural Institute of Korea, 23(5), pp. 171-178.
|
13 |
Sousa, V. (2014). "Risk-Informed Time-Cost Relationship Models for Sanitation Projects." ASCE Journal of Construction and Engineering Management, 140(5).
|
14 |
Lee, M.J. (2016). "The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facility." Korea Journal of Construction Engineering and Management, 17(3), pp. 125-133.
DOI
|
15 |
Park, Y.M., Kim, S.Y., Kim, K.Y. (2005). "An Analysis of Risk Factors of a Construction Project Through Execution Plan." Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 139-149.
|