• 제목/요약/키워드: Quantity take off

검색결과 90건 처리시간 0.022초

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발 (Development of A Prototype for Wall Formwork Designs using Open BIM)

  • 김승권;김현주;현창택;한상원
    • 한국건설관리학회논문집
    • /
    • 제19권6호
    • /
    • pp.3-13
    • /
    • 2018
  • 거푸집공사비는 건축공사비의 10~15%, 골조공사비의 30~40%로, 건축공사에서 차지하는 비중이 상당하다. 또한 거푸집 붕괴로 인한 사망재해가 빈번하게 발생하고 있어, 다른 공종에 비하여 상대적으로 재해강도가 높은 공종이라 할 수 있다. 이처럼 건설 프로젝트에서 거푸집을 설계할 때 정확한 물량산출과 구조계산은 매우 중요한 사항이다. 따라서 본 연구에서는 거푸집설계를 용이하게 하기 위하여 거푸집공사에 관련된 새로운 IFC Entity를 제안하였으며, "개방형 BIM 거푸집설계 프로토타입"을 개발하였다. 본 연구에서 제안하는 거푸집설계 접근법은 시공 관리자로 하여금 정확한 물량산출과 신속한 계획 및 시공을 수행하는데 도움을 줄 것으로 기대된다. 하지만 본 연구는 소규모 특정건축물과 유로폼 만을 대상으로 수행하였기 때문에, 그 외의 건축물의 거푸집공사에 적용하기에는 한계가 있고, 범용적으로 거푸집공사에 적용하기 위해서는 추가적인 연구가 필요할 것이다.

Preparing a Construction Cash Flow Analysis Using Building Information Modeling (BIM) Technology

  • Kim, Hyunjoo;Grobler, Francois
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권1호
    • /
    • pp.1-9
    • /
    • 2013
  • Construction is a competitive industry and successful contractors must be able to win bids to obtain projects. Cash flow analysis not only determines actual profit at the end of the project, but also estimates required cash resources or cash ballances at the end of every month. Cash flow analysis is important in managing a construction project; however, it requires extensive information that is not immediately available to the general contractor. Before contractors can perform cash flow analysis, they must first complete a series of pre-requisites such as the quantity take off, scheduling, and cost estimating, followed by accurate assessments of project costs incurred and billable progress made. Consequently, cash flow analysis is currently a lengthy, uncertain process. This paper suggests improved cash flow analysis can be developed using data extraction in Building Information Modeling (BIM). BIM models contain a wealth of information and tools have been developed to automate a series of process such as quantity takeoff, scheduling, and estimating. This paper describes a prototype tool to support BIM-based, automated cash flow analysis.

비용-일정통합기반 진도관리 개선방안 (Improvement of Cost-Schedule integration based Progress Management through PMIS)

  • 윤유상;서상욱;장규성;최장식
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.144-152
    • /
    • 2013
  • 최근 건설프로젝트가 대형화되면서 건설사들은 PMIS(Project Management Information System)를 이용하여 대부분의 관리업무를 수행한다. 특히, 건설공사 수행과정에서 가장 빈번한 정보입출력이 발생하는 진도관리 기능은 PMIS의 여러 기능 중 가장 효율적으로 운영되어야 한다. 그러나 PMIS 내에서 입력되는 정보가 대부분 중복입력 없이 운영되고 있음에도 불구하고, 진도관리를 위한 데이터는 비용과 일정 정보의 개별 입력을 통해 관리되고 있는 실정이다. 따라서 물가상승, 설계변경 등에 의해 비용과 일정이 변경되는 사항에 대한 정보가 연계되지 못하여 진도측정의 부정확성과 PMIS에서 관리해야할 데이터의 증가를 유발한다. 이와 같은 문제를 해결하기 위해서 진도측정방법의 개선과 이를 기반으로 한 PMIS 진도관리 모듈의 구현이 요구되고 있다. 이에 본 논문에서는 수량산출정보 기반의 비용-일정 통합 진도측정방법과 비용-일정 통합관리에 필요한 PMIS 공통관리항목을 기반으로 한 PMIS 진도관리 개선 모듈을 제시하고자 한다.

BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축 (Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase)

  • 송치호;김치경;이시은;최현철
    • 한국전산구조공학회논문집
    • /
    • 제29권5호
    • /
    • pp.447-454
    • /
    • 2016
  • 최근에 각광받고 있는 3D BIM기반 철근 물량 산출 현황을 살펴보면 상용 BIM 도구들이 철근 모델링 기능을 제공하지만 그 기능을 이용해서 철근을 모델링하려고 하면 방대한 양의 모델링 시간이 소요가 되어 현재 실용적으로 사용할 수 있는 BIM 소프트웨어는 없다. 본 연구에서는 BIM 기반 설계 현업에서 실용적인 철근 물량 산출 프로세스를 정리 및 제시하고, 초기설계단계의 단면 정보가 없는 상태에서 기존의 2D방식에 비하여 보다 정확하게 기동, 보, 슬래브, 벽체의 철근 단면 정보를 자동으로 배근해주는 프로그램인 Rebar Automatic Arrangement Program(이하 RAAP)을 개발하였다. 본 연구 결과는 건설프로젝트의 초기 설계단계에서 설계 진행상 구조 부재 단면 설계가 완료되지 않은 상태의 골조 물량 산출 시 적은 노력으로 기존의 2D기반 방식보다 신뢰성을 향상시킨 물량을 산출할 수 있는 기술로 발전시키는데 의미가 있으며, 합리적인 초기 설계단계의 물량 산출 프로그램을 구축할 수 있는 기초 연구로서 활용될 수 있을 것으로 기대된다.

복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 - (A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex -)

  • 강신엽;안재홍;김주형
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

건축공사 내역서 세부항목 구성에 대한 사례연구 (A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities)

  • 노혜라;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

PSC 박스 거더교의 시공성 검사 프로그램 개발 (Development of the Program Checking the Constructible Possibility of Prestressed Concrete Box Girder Bridges)

  • 김병석;김영진;강재윤;한석희
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1998년도 가을 학술발표대회 논문집(III)
    • /
    • pp.701-705
    • /
    • 1998
  • The objective of this study is to develop the practical program which can check the constructible possibility of prestressed concrete box girder bridges for design. Checking constructible possibility is defined as checking the interference of each elements in a PSC box girder bridge and computing the distances of each elements. To check the constructible possibility of a PSC box girder bride, bridge must be modelled using solid in three dimension. By using a 3 dimensional solid modeling system, engineers can get the photo realistic 3D viewing images of the bridge and produce FEM analytic model of it. Users can manipulate their drawings easier and take off quantity of the whole structure and its elements as well as check the constructible possibility of their PSC box girder bridges.

  • PDF

해외 화공플랜트 건설사업 위험요인 영향도 분석 (A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects)

  • 조승연;김용수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

고강도 철근 사용에 따른 순수 철근량에 대한 정착 및 이음 철근량 비교 (Comparison of Pure Reinforcement Quantity to Development & Splice Reinforcement Quantity using High-strength Reinforcing Bars)

  • 조승호;나승욱;노영숙
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제22권1호
    • /
    • pp.72-80
    • /
    • 2018
  • 초고층 및 장경간 등 대형 구조물에 대한 시공시 부재의 품질이 저하될 정도로 과다한 철근이 배근되고 있다는 문제점이 제기되고 있으며, 최근 건축되고 있는 초고층 건축물에서는 건물의 안정성과 내구성 등을 감안하여 사용 재료의 강도도 점차 증가하고 있다. 초고층 및 장경간 구조물의 시공에서 고강도 철근을 사용할 경우 기존의 일반 강도 철근에 비해 배근량 감소로 인하여 부재에서 배근 간격에도 여유를 줄 수 있어 시공성 향상, 공기단축, 접합부 상세가 간소화 되는 장점이 있다. 이 연구에서는 SD500, SD600 철근을 국내에서 설계되었거나 시공되어진 라멘 구조 형식의 지하주차장 건축물에 적용하여 각 부재별로 철근의 강도에 따른 순수 철근량에 대한 정착 및 이음 철근량 증감을 비교 분석한 결과 다음과 같은 결론을 얻었다. 계산된 철근의 정착 및 이음 물량은 사용철근의 강도가 증가함에 따른 정착 및 이음길이의 증가량과 순수 물량의 감소비율, 사용철근의 직경이 줄였을 때의 단면적 감소 등의 요인들에 의해 정착 및 이음 물량이 결정되었으며, 전체적으로 순수 물량에 대한 정착 및 이음 물량의 비율이 SD400대비 SD500의 경우는 증가하였지만 SD500대비 SD600의 경우는 감소하였다. 이는 보의 정착 및 이음 물량이 전체 정착 및 이음 물량에 미치는 영향이 크기 때문으로 판단된다. 한편 순수 물량에 대한 정착 및 이음 물량의 비율에서 SD400과 SD500의 차이와 SD400과 SD600의 차이가 미미하여 철근의 정착 및 이음 물량이 강도 증가에 따른 전체 철근 물량의 증감에는 큰 영향을 주지 않는 것으로 파악되었다.